! l ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( Tower 61 E-479552, N-6050468 Tyrrell N3-S03 N3-S02 N3-Soils-106 N3-Aqua-200 N3-Soils-105 N3-Soils-107 N3-Wild-102 N3-Wild-101 N3-Aqua-101 N3-Aqua-104 N3-Aqua-102 N3-Aqua-103 N3-Hert-101 N3-Hert-102 N3-Hert-100 28 27 28 27 30 29 22 33 31 33 * MAP SHEET FULLY WITHIN THE N3-AQUA-200 FEATURE Coordinate System: UTM Zone 14N NAD83 Data Source: MB Hydro, ProvMB, NRCAN Date Created: November 29, 2013 ± 1:10,000 0 250 500 125 Metres Map 117 Bipole III Transmission Project Construction Environmental Protection Plan Construction Section N3 Environmentally Sensitive Site Locations DOCUMENT PATH: G:\_GIS_PROJECT_FOLDER\00_HYDRO\111440054_BPIII_EPP\ARCMAP\ESS_N3\BPIII_CENVPP_N1N2N3N4C1SECTIONBASEMAP_MAPBOOK_BTB_STANTEC_20131128A.MXD ESS Features Heritage ! ( Archaeological Water ! ( Water Crossing Wildlife ! ( Birds and Habitat Soils and Terrain Permafrost Water Groundwater Points of Access* ! ( Proposed Access Point ! ( Major Stream Crossing Abandoned Rail Crossing Rail Crossing " ) Transmission Line Crossing Project Infrastructure Proposed Access Route Land Base 66 m Right of Way BPIII Final Preferred Route Angle Tower Locations # # *Labels correspond to BPIII Access Management Database Mining ! ! Transmission Line Highway Major Road Local Road Winter Road Railway (Operational) Railway (Discontinued) Provincial Park

Transcript of * MAP SHEET FULLY WITHIN THE N3-AQUA-200 FEATURE · i2 N3-Wild-101 N3-Aqua ... * MAP SHEET FULLY...

Page 1: * MAP SHEET FULLY WITHIN THE N3-AQUA-200 FEATURE · i2 N3-Wild-101 N3-Aqua ... * MAP SHEET FULLY WITHIN THE N3-AQUA-200 FEATURE Coordinate System: UTM Zone 14N NAD83 Data Source:

! l

!(

!(

!(!(

!(!(!(

!(

!(!(

!( !(

!(

!(

!(

!(

!(

Tower 61E-479552, N-6050468

Tyrrell

N3-S03N3-S02

N3-Soils-106

N3-Aqua-200

N3-Soils-105

N3-Soils-107

N3-Wild-102 N3-Wild-101

N3-Aqua-101N3-Aqua-104

N3-Aqua-102

N3-Aqua-103

N3-Hert-101N3-Hert-102

N3-Hert-100

28 2728 27

30

29

22

33

31

33

* MAP SHEET FULLY WITHIN THE N3-AQUA-200 FEATURE

Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: November 29, 2013

±

1:10,000

0 250 500125

Metres

Map 117

Bipole III Transmission ProjectConstruction Environmental Protection Plan

Construction Section N3Environmentally Sensitive Site Locations

DO

CU

ME

NT

PA

TH

: G

:\_G

IS_

PR

OJE

CT

_F

OLD

ER

\00_

HY

DR

O\1

114

4005

4_B

PII

I_E

PP

\AR

CM

AP

\ES

S_

N3

\BP

III_

CE

NV

PP

_N1N

2N3N

4C1S

EC

TIO

NB

AS

EM

AP

_MA

PB

OO

K_

BT

B_S

TAN

TE

C_2

0131

128A

.MX

D

ESS FeaturesHeritage!( Archaeological

Water!( Water Crossing

Wildlife!( Birds and Habitat

Soils and TerrainPermafrost

WaterGroundwater

Points of Access*!( Proposed Access Point

!( Major Stream Crossing

Abandoned Rail Crossing

Rail Crossing

") Transmission Line Crossing

Project Infrastructure

Proposed Access Route

Land Base

66 m Right of Way

BPIII Final Preferred Route

Angle Tower Locations

#

#

*Labels correspond to BPIII Access Management Database

Mining

! ! Transmission LineHighwayMajor RoadLocal RoadWinter RoadRailway (Operational)Railway (Discontinued)

Provincial Park

Page 2: * MAP SHEET FULLY WITHIN THE N3-AQUA-200 FEATURE · i2 N3-Wild-101 N3-Aqua ... * MAP SHEET FULLY WITHIN THE N3-AQUA-200 FEATURE Coordinate System: UTM Zone 14N NAD83 Data Source:

MAP NUMBER : 117

ESS Group : Permafrost

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance

N3-S02 N3-Soils-105 Permafrost Site: 27 to 28 E-481729 N-6051522

E-481605 N-6051462 14N 137m

N3-S02 N3-Soils-106 Permafrost Site: 29 to 30 E-481146 N-6051240

E-479741 N-6050560 14N 1561m

N3-S03 N3-Soils-107 Permafrost Site: 33 to 34 E-478526 N-6050117

E-477212 N-6049669 14N 1388m

Potential Effects: Melting or loss of permafrost due to disturbance of the active layer Specific Mitigation:

Carry out construction activities on frozen ground to minimize surface damage and rutting Use existing trails, roads or cut lines whenever possible as access routes Avoid organic soils containing permafrost to the extent possible Maintain shrub and herbaceous vegetation to the extent possible Remove trees by low-disturbance methods Confine vehicle traffic to established trails to the extent possible Implement erosion protection before commencing construction in accordance with Erosion/Sediment Control

Plan

ESS Group : Groundwater

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM

Zone Distance

N3-S02 N3-Aqua-200

Aquifers Vulnerable to contamination Site: 21 to 22 E-487455

N-6054295 E-479552 N-6050468 14N 8780m

N3-S03 N3-Aqua-200

Aquifers Vulnerable to contamination Site: 31 to 32 E-479552

N-6050468 E-460122 N-6044246 14N 20403m

Potential Effects: Potential groundwater contamination from a contingency event (e.g., spill) Specific Mitigation:

Marshaling yards will be located on upland sites where possible An Emergency Preparedness and Spill Response Plan will be developed and an emergency response spill kit will be

kept on-site at all times in case of fluid leaks or spills from machinery

ESS Group : Water Crossing

Sec-Seg ID ESS ID ESS Name Easting Northing UTM

Zone Channel Width

Wet Width

Fish Habitat Class

Habitat Sensitivity

N3-S02 N3-Aqua-101

Unnamed Tributary into Mitishto River

481627 6051473 14N 9m 9m Marginal Moderate

N3-S03 N3-Aqua-102 Mitishto River 479219 479219 14N 17m 17m Important High

N3-S03 N3-Aqua-103 Mitishto River 479131 6050324 14N 22m 22m Marginal Moderate

N3-S03 N3-Aqua-104

Unnamed Tributary into Mitishto River

478723 6050185 14N N/A N/A Marginal Moderate

Potential Effects: Habitat loss & contamination from structure foundations & installations; increased erosion & sedimentation of streams; damage to stream banks; loss of riparian vegetation; fish habitat disturbance & impeded fish movement Specific Mitigation:

Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion Use existing trails, roads or cut lines whenever possible as access routes Identify and flag buffer areas prior to start of work Riparian Buffers shall be a minimum of 30m and increase in size based on slope of land entering waterway. Within

these buffers shrub and herbaceous understory veg will be maintained along with trees that do not violate MH Veg Clearance Requirements.

7m no machine zone will restrict equipment in close proximity to the waterbody except at the trail crossing. Adhere to Department of Fisheries and Oceans (DFO) Operational Statements for Temporary Stream Crossings, Ice

Bridges and Snow Fills, and Overhead Line Construction No instream works or fording from April 15 - July 15

Page 3: * MAP SHEET FULLY WITHIN THE N3-AQUA-200 FEATURE · i2 N3-Wild-101 N3-Aqua ... * MAP SHEET FULLY WITHIN THE N3-AQUA-200 FEATURE Coordinate System: UTM Zone 14N NAD83 Data Source:

MAP NUMBER : 117 cont’d

ESS Group : Archaeological

Sec-Seg ID ESS ID ESS Name Easting Northing UTM Zone

N3-S03 N3-Hert-100 Mitishto River 479227 6050357 14N

N3-S03 N3-Hert-101 Registered Archaeological Site (The Les Phillips (Sky Sailor) Site) 479112 6050321 14N

N3-S03 N3-Hert-102 Mitishto River 479138 6050309 14N Potential Effects: Potential disturbance to Heritage Resources Specific Mitigation:

Carry out construction activities on frozen or dry ground to minimize surface damage, rutting and erosion

Identify and flag prior to start of work Conduct site investigation with Archaeologist post clearing and prior to construction Minimize surface disturbance around the site to the extent possible Inspect excavated materials or surface disturbance for heritage resources and report any finds to

Environmental Inspector Implement additional mitigation from site investigation

ESS Group : Birds and Habitat

Sec-Seg ID ESS ID ESS Name Easting Northing UTM Zone

N3-S03 N3-Wild-101 Waterfowl Sensitivity Area 479228 6050336 14N

N3-S03 N3-Wild-102 Waterfowl Sensitivity Area 479138 6050309 14N Potential Effects: Higher risk of wire collision, risk of wire collision is localized to the right-of-way Specific Mitigation:

Adhere to reduced risk timing windows for protection of birds (August 1- April 30) Maintain setback during timing window Conduct priority assessment for bird diverters and other measures prior to transmission line stringing Install bird diverters or other measures at high priority sites Monitor bird density and mortality/injury in accordance with Biophysical Monitoring Plan and adjust

mitigation accordingly

Page 4: * MAP SHEET FULLY WITHIN THE N3-AQUA-200 FEATURE · i2 N3-Wild-101 N3-Aqua ... * MAP SHEET FULLY WITHIN THE N3-AQUA-200 FEATURE Coordinate System: UTM Zone 14N NAD83 Data Source:

This page is intentionally left blank.

Page 5: * MAP SHEET FULLY WITHIN THE N3-AQUA-200 FEATURE · i2 N3-Wild-101 N3-Aqua ... * MAP SHEET FULLY WITHIN THE N3-AQUA-200 FEATURE Coordinate System: UTM Zone 14N NAD83 Data Source:

!(!( !( !( !( !(!( !( !(

N3-S03

N3-Aqua-200

N3-Soils-107

N3-Soils-107

N3-Aqua-10541 40 39 38 37 36 35 34

* MAP SHEET FULLY WITHIN THE N3-AQUA-200 FEATURE

Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMB, NRCANDate Created: November 29, 2013

±

1:10,000

0 250 500125

Metres

Map 118

Bipole III Transmission ProjectConstruction Environmental Protection Plan

Construction Section N3Environmentally Sensitive Site Locations

DO

CU

ME

NT

PA

TH

: G

:\_G

IS_

PR

OJE

CT

_F

OLD

ER

\00_

HY

DR

O\1

114

4005

4_B

PII

I_E

PP

\AR

CM

AP

\ES

S_

N3

\BP

III_

CE

NV

PP

_N1N

2N3N

4C1S

EC

TIO

NB

AS

EM

AP

_MA

PB

OO

K_

BT

B_S

TAN

TE

C_2

0131

128A

.MX

D

ESS FeaturesWater!( Water Crossing

Soils and TerrainPermafrost

WaterGroundwater

Points of Access*!( Proposed Access Point

!( Major Stream Crossing

Abandoned Rail Crossing

Rail Crossing

") Transmission Line Crossing

Project Infrastructure

Proposed Access Route

Land Base

66 m Right of Way

BPIII Final Preferred Route

Angle Tower Locations

#

#

*Labels correspond to BPIII Access Management Database

Mining

! ! Transmission LineHighwayMajor RoadLocal RoadWinter RoadRailway (Operational)Railway (Discontinued)

Provincial Park

Page 6: * MAP SHEET FULLY WITHIN THE N3-AQUA-200 FEATURE · i2 N3-Wild-101 N3-Aqua ... * MAP SHEET FULLY WITHIN THE N3-AQUA-200 FEATURE Coordinate System: UTM Zone 14N NAD83 Data Source:

MAP NUMBER : 118

ESS Group : Groundwater

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance

N3-S03 N3-Aqua-200

Aquifers Vulnerable to contamination Site: 31 to 32 E-479552

N-6050468 E-460122 N-6044246 14N 20403m

Potential Effects: Potential groundwater contamination from a contingency event (e.g., spill) Specific Mitigation:

Marshaling yards will be located on upland sites where possible An Emergency Preparedness and Spill Response Plan will be developed and an emergency response spill kit will be

kept on-site at all times in case of fluid leaks or spills from machinery

ESS Group : Water Crossing

Sec-Seg ID ESS ID ESS Name Easting Northing UTM

Zone Channel Width

Wet Width

Fish Habitat Class

Habitat Sensitivity

N3-S03 N3-Aqua-105

Unnamed Tributary into Mitishto River 476179 6049316 14N 6m N/A Marginal Low

Potential Effects: Habitat loss & contamination from structure foundations & installations; increased erosion & sedimentation of streams; damage to stream banks; loss of riparian vegetation; fish habitat disturbance & impeded fish movement

Specific Mitigation:

Carry out construction activities on frozen ground to minimize surface damage, rutting and erosion Use existing trails, roads or cut lines whenever possible as access routes Identify and flag buffer areas prior to start of work Riparian Buffers shall be a minimum of 30m and increase in size based on slope of land entering waterway. Within

these buffers shrub and herbaceous understory veg will be maintained along with trees that do not violate MH Veg Clearance Requirements.

7m no machine zone will restrict equipment in close proximity to the waterbody except at the trail crossing. Adhere to Department of Fisheries and Oceans (DFO) Operational Statements for Temporary Stream Crossings, Ice

Bridges and Snow Fills, and Overhead Line Construction No instream works or fording from April 15 - July 15

ESS Group : Permafrost

Sec-Seg ID ESS ID ESS Name Location Start Stop UTM Zone Distance

N3-S03 N3-Soils-107 Permafrost Site: 33 to 34 E-478526 N-6050117

E-477212 N-6049669 14N 1388m

N3-S03 N3-Soils-107 Permafrost Site: 35 to 36 E-477123 N-6049638

E-477043 N-6049611 14N 84m

N3-S03 N3-Soils-107 Permafrost Site: 37 to 38 E-476118 N-6049295

E-475909 N-6049226 14N 221m

N3-S03 N3-Soils-107 Permafrost Site: 39 to 40 E-475601 N-6049129

E-475531 N-6049106 14N 74m

N3-S03 N3-Soils-107 Permafrost Site: 41 to 42 E-475320 N-6049040

E-474214 N-6048691 14N 1159m

Potential Effects: Melting or loss of permafrost due to disturbance of the active layer Specific Mitigation:

Carry out construction activities on frozen ground to minimize surface damage and rutting Use existing trails, roads or cut lines whenever possible as access routes Avoid organic soils containing permafrost to the extent possible Maintain shrub and herbaceous vegetation to the extent possible Remove trees by low-disturbance methods Confine vehicle traffic to established trails to the extent possible Implement erosion protection before commencing construction in accordance with Erosion/Sediment Control

Plan