Page 1:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 2:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 3:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 4:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15

DTP-0001 (Revised Mar, 1 2018 v7.08)

Assembly: Senate: Congressional:

ADA ImprovementsInc. Sustainable Communities Strategy Goals

End Closeout Phase (Closeout Report) 01/01/2023 06/30/24*

ADA Notice For individuals with sensory disabilities, this document is available in alternate formats. For information call (916) 654-6410 or TDD (916) 654-3880 or write Records and Forms Management, 1120 N Street, MS-89, Sacramento,

End Construction Phase (Construction Contract Acceptance Milestone) 07/01/2022 12/31/23*Begin Closeout Phase 07/01/2022 12/31/23*

End Right of Way Phase (Right of Way Certification Milestone) 12/01/2019 12/01/19Begin Construction Phase (Contract Award Milestone) 06/01/2020 06/01/20

End Design Phase (Ready to List for Advertisement Milestone) 12/01/2018 12/01/19*Begin Right of Way Phase 05/01/2018 05/01/18

End Environmental Phase (PA&ED Milestone) 04/01/2018 05/16/18*Begin Design (PS&E) Phase 06/01/2018 06/28/18*

Circulate Draft Environmental Document Document Type EIR/FONSI 10/01/2017 10/01/17Draft Project Report 04/01/2017 04/01/17

Project Study Report Approved 12/09/15Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15

Y Y YY Y

Project Milestone Existing Proposed

Bike/Ped Improvements Reversible Lane analysis

Local streets and roads Sidewalk Feet 10,600Local streets and roads Bicycle lane linear feet Feet 7,400

Intercity Rail/Mass Trans Grade separations/ rail crossing improvements Feet 420Local streets and roads Operational improvements Each 6 lanes

Project BenefitsThe project reduces congestion and vehicle emissions, and improves safety. When completed, the project will reduce congestion caused by delays from the existing traffic signal and passing trains, and will improve safety between vehicles traveling on Rice Avenue and the at-grade railroad crossing adjacent to SR-34. Continued on page 2

Purpose and NeedThe purpose of this project is to eliminate the conflict between vehicles, pedestrians, bicylists, and trains at the Rice Avenue rail-highway crossing, to address future traffic congestion and circulation challenges forecasted for the project area. The Project is needed to increase safety, relieve vehicle congestion, reduce vehicle emissions, and reduce goods movement delays. From 2010 to 2016, there have been sixty-one separate accidents at the Rice Avenue/SR-34 (Fifth Street) Continued on page 2

Category Outputs/Outcomes Unit Total

Construction City of OxnardLegislative Districts

44 19 26

PA&ED City of OxnardPS&E City of OxnardRight of Way City of Oxnard

Project TitleRice Avenue & Fifth Street Grade Separation ProjectLocation (Project Limits), Description ( Scope of Work)The Rice Avenue & Fifth Street Grade Separation Project is located in the City of Oxnard, Ventura County, at the Rice Avenue, Fifth Street (Route 34), and Union Pacific Railroad (UPRR) intersection. Project scope is to construct a grade separation structure to elevate Rice Avenue over Fifth Street and the UPRR track to eliminate the existing at-grade railroad crossing. The Project also includes the construction of two connector roads, one in the southeast quadrant and another in the southwest quadrant of the Rice Avenue grade separation, to provide access between Rice Avenue and Fifth Street.

Component Implementing Agency

Project Manager/Contact Phone E-mail AddressJustin Link (805) 385-8308 [email protected]

ElementSCAG RAIL

VEN 6.3 6.8 Caltrans/City of OxnardMPO

County Route/Corridor PM Bk PM Ahd Project Sponsor/Lead Agency

Project ID PPNO MPO ID Alt Proj. ID / prg.75 TC0001 0018000289 4961

Reduces Greenhouse Gas Emissions

STATE OF CALIFORNIA ● DEPARTMENT OF TRANSPORTATIONPROJECT PROGRAMMING REQUEST

General InstructionsAmendment (Existing Project) No Date: 06/12/18

District EA

Exhibit A

Page 5:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15

DTP-0001 (Revised Mar, 1 2018 v7.08) Date: 06/12/18

ADA Notice

STATE OF CALIFORNIA ● DEPARTMENT OF TRANSPORTATION

PROJECT PROGRAMMING REQUEST

Additional InformationContinued from page 1 - Project Benefits - The benefit from reduced accidents and emissions at the existing intersection is estimated at $2.4 million annually, and an annual reduction of 1,195 tons of CO2 emissions and over 4 tons of criteria pollutants (Cal-B/C results). The Project improves congestion, air quality and safety for all residents along Oxnard Boulevard in central Oxnard.

Continued from page 1 - Purpose and Need - and Rice Avenue/UPRR tracks intersections, averaging nine accidents per year in that area during that seven-year period. Two of the sixty-one accidents occurred on June 3, 2014, and February 24, 2015, and resulted in three fatalities from a Metrolink train hitting a car and a truck at the at-grade railroad crossing. The intersection is currently operating at Level of Service (LOS) D for vehicle traffic and will continue to deteriorate without the Project build, eventually resulting in LOS F in 2020 during the late day peak.

Explanation of the distance lengths - The distance of the bridge is 420 feet long. The distance of the road lane is 3,400 feet long along Rice Avenue. The sidewalk and bike lane are on both sides of Rice Avenue; therefore the distance on Rice Avenue is 6,800 feet long and with an additional 600 feet long of tapers which require bike lane as well for a total distance of 7,400 feet long. The sidewalk is along both sides of Rice Avenue with a distance of 7,400 feet long, and an additional 3,200 feet long of sidewalk along Fifth Street and the connector roads.

Project Milestone dates changed to actual dates for certain milestones that have begun since the original project application was submitted. Construction end dates changed to better align with the CTC's Timely Use of Funds Rule. Design end date has been corrected from what was listed in the original PPR with the application. The date of 12/01/18 was listed in error; the correct date to complete design is 12/01/19. The new PPR has 2.0 miles of sidewalk, instead of 2.5 miles in the submitted application. The submitted application listed the at-grade railroad crossing elimination of 0.5 mile instead of 0.64 mile, and the original total operational improvements of 1.4 miles, instead of the 3.5 miles of total new project improvements.

For individuals with sensory disabilities, this document is available in alternate formats. For information call (916) 654-6410 or TDD (916) 654-3880 or write Records and Forms Management, 1120 N Street, MS-89, Sacramento, CA 95814.

Page 6:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15

DTP-0001 (Revised June, 7 2018 v7.09) Date: 7/19/18

ADA Notice

STATE OF CALIFORNIA ● DEPARTMENT OF TRANSPORTATION

PROJECT PROGRAMMING REQUEST

Additional InformationProject Benefits (Continued from pg 2):

The results page from the Cal B/C v6.2 model is presented below.

For individuals with sensory disabilities, this document is available in alternate formats. For information call (916) 654-6410 or TDD (916) 654-3880 or write Records and Forms Management, 1120 N Street, MS-89, Sacramento, CA 95814.

Page 7:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15

DTP-0001 (Revised Mar, 1 2018 v7.08) Date: 06/12/18District EA

75 TC0001Project Title:

Component Prior 18/19 19/20 20/21 21/22 22/23 23/24+ TotalE&P (PA&ED) 3,132 3,132PS&E 6,860 6,860R/W SUP (CT)CON SUP (CT)R/W 8,000 8,000CON 61,200 61,200TOTAL 3,132 14,860 61,200 79,192

E&P (PA&ED) 3,132 3,132PS&E 1,523 5,337 6,860R/W SUP (CT)CON SUP (CT)R/W 8,000 8,000CON 61,200 61,200TOTAL 4,655 13,337 61,200 79,192

Fund No. 1:

Component Prior 18/19 19/20 20/21 21/22 22/23 23/24+ TotalE&P (PA&ED)PS&E 4,406 4,406R/W SUP (CT)CON SUP (CT)R/W 8,000 8,000CON 56,200 56,200TOTAL 12,406 56,200 68,606

E&P (PA&ED)PS&E 4,406 4,406R/W SUP (CT)CON SUP (CT)R/W 8,000 8,000CON 56,200 56,200TOTAL 12,406 56,200 68,606

Fund No. 2:

Component Prior 18/19 19/20 20/21 21/22 22/23 23/24+ TotalE&P (PA&ED) 2,773 2,773PS&E 487 487R/W SUP (CT)CON SUP (CT)R/WCONTOTAL 2,773 487 3,260

E&P (PA&ED) 2,773 2,773PS&E 487 487R/W SUP (CT)CON SUP (CT)R/WCONTOTAL 2,773 487 3,260

Existing Funding ($1,000s) 20.30.010.810Funding Agency

City of Oxnard

Proposed Funding ($1,000s) Notes

Proposed Funding ($1,000s) NotesAdopted in May 2018, Advance Allocation June 2018 - FY2017/2018

RSTP - STP Local Regional (STPL-R) Program Code

State SB1 TCEP - Trade Corridors Enhancement Account (TCEA) Program CodeExisting Funding ($1,000s) 30.20.723.100

Funding AgencyCaltrans

City of OxnardCity of Oxnard

Proposed Total Project Cost ($1,000s) Notes

Existing Total Project Cost ($1,000s)Implementing Agency

City of OxnardCity of OxnardCity of OxnardCity of Oxnard

VEN, , , , 0018000289 4961Rice Avenue & Fifth Street Grade Separation Project

STATE OF CALIFORNIA ● DEPARTMENT OF TRANSPORTATION

PROJECT PROGRAMMING REQUEST

County Route Project ID PPNO Alt. ID

Page 8:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15

Fund No. 3:

Component Prior 18/19 19/20 20/21 21/22 22/23 23/24+ TotalE&P (PA&ED)PS&E 1,523 1,523R/W SUP (CT)CON SUP (CT)R/WCONTOTAL 1,523 1,523

E&P (PA&ED)PS&E 1,523 1,523R/W SUP (CT)CON SUP (CT)R/WCONTOTAL 1,523 1,523

Fund No. 4:

Component Prior 18/19 19/20 20/21 21/22 22/23 23/24+ TotalE&P (PA&ED) 359 359PS&E 444 444R/W SUP (CT)CON SUP (CT)R/WCONTOTAL 359 444 803

E&P (PA&ED) 359 359PS&E 444 444R/W SUP (CT)CON SUP (CT)R/WCONTOTAL 359 444 803

Fund No. 5:

Component Prior 18/19 19/20 20/21 21/22 22/23 23/24+ TotalE&P (PA&ED)PS&ER/W SUP (CT)CON SUP (CT)R/WCON 5,000 5,000TOTAL 5,000 5,000

E&P (PA&ED)PS&ER/W SUP (CT)CON SUP (CT)R/WCON 5,000 5,000TOTAL 5,000 5,000

Caltrans Sec 190

Proposed Funding ($1,000s) NotesProposed funding is subject to Section 190 application approval

Section 190 State Funds Program CodeExisting Funding ($1,000s) 20.30.010.400

Funding Agency

Existing Funding ($1,000s) 20.10.400.100Funding Agency

Oxnard, City of

Proposed Funding ($1,000s) Notes

FRA STEP

Proposed Funding ($1,000s) NotesAllocated June 2018

Local Funds - FEE (FEE) Program Code

Federal Disc. - 2011 Federal Discretionary Grants (2011FDG) Program CodeExisting Funding ($1,000s) 30.20.725.000

Funding Agency

Page 9:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15

Exhibit B

Page 10:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 11:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 12:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 13:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 14:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 15:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 16:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 17:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 18:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 19:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 20:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 21:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 22:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 23:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 24:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 25:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 26:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 27:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 28:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 29:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 30:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 31:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 32:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 33:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 34:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 35:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 36:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 37:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 38:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 39:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 40:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 41:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 42:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 43:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 44:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 45:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 46:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 47:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 48:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 49:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 50:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 51:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 52:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 53:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 54:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 55:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 56:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 57:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 58:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 59:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 60:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 61:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 62:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 63:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 64:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 65:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 66:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 67:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 68:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 69:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 70:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 71:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 72:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 73:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 74:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 75:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 76:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 77:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 78:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 79:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 80:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 81:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 82:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 83:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 84:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 85:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 86:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 87:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 88:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 89:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 90:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 91:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 92:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 93:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 94:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 95:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 96:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 97:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 98:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 99:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 100:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 101:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 102:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 103:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 104:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 105:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 106:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 107:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 108:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 109:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 110:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 111:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 112:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 113:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 114:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 115:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 116:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 117:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 118:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 119:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 120:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 121:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 122:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 123:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 124:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 125:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 126:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 127:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 128:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 129:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 130:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 131:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 132:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 133:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 134:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 135:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 136:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 137:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 138:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 139:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 140:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 141:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 142:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 143:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 144:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 145:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 146:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 147:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 148:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 149:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 150:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 151:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 152:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 153:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 154:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 155:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 156:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 157:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 158:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 159:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 160:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 161:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 162:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 163:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 164:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 165:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 166:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 167:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 168:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 169:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 170:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 171:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 172:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 173:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 174:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 175:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 176:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 177:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 178:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 179:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 180:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 181:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 182:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 183:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 184:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 185:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 186:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 187:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 188:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 189:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 190:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 191:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 192:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 193:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 194:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 195:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 196:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 197:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 198:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 199:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 200:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 201:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 202:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 203:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 204:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 205:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 206:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 207:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 208:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 209:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 210:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 211:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 212:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 213:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 214:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 215:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 216:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 217:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 218:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 219:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 220:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 221:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 222:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 223:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 224:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 225:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 226:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 227:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 228:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 229:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 230:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 231:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 232:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 233:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 234:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 235:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 236:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 237:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 238:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 239:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 240:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 241:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 242:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 243:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 244:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 245:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 246:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 247:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 248:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 249:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 250:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 251:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 252:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 253:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 254:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 255:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 256:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 257:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 258:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 259:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 260:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 261:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 262:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 263:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 264:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 265:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 266:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 267:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 268:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 269:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 270:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 271:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 272:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 273:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 274:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 275:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 276:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 277:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 278:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 279:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 280:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 281:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 282:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 283:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 284:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 285:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 286:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 287:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 288:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 289:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 290:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 291:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 292:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 293:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 294:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 295:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 296:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 297:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 298:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 299:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 300:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 301:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 302:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 303:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 304:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 305:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 306:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 307:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15
Page 308:  · EIR/FONSI 10/01/2017 10/01/17 Draft Project Report 04/01/2017 04/01/17 Project Study Report Approved 12/09/15 Begin Environmental (PA&ED) Phase 12/15/2015 12/15/15