© Crown copyright Using ensemble rainfall predictions in a countrywide flood forecasting model in...

22
© Crown copyright Using ensemble rainfall predictions in a countrywide flood forecasting model in Scotland Why Predict? The value of prediction in hydrological sciences and policy Michael Cranston, EGU General Assembly 2012

Transcript of © Crown copyright Using ensemble rainfall predictions in a countrywide flood forecasting model in...

© Crown copyright

Using ensemble rainfall predictions in a countrywide flood forecasting model in Scotland

Why Predict? The value of prediction in hydrological sciences and policy

Michael Cranston, EGU General Assembly 2012

© Crown copyright

Acknowledgements• Bob Moore, Steve Cole, Alice Robson, Vicky Bell

and Phil Howard of CEH Wallingford

• Alex Minett and Marcel Ververs of Deltares

• Peter Buchanan and Alan Motion of Met Office

• Richard Maxey, Amy Tavendale, Lauren McLean and Rachel Geldart of the Flood Forecasting and Warning Section of SEPA

© Crown copyright

Aims• What policy is driving our flood forecasting

developments

• What are the key challenges in flood forecasting uncertainty and how are we tackling this through science developments and applications

• What have we learned from recent operational experience of use of probabilistic flood forecasts

© Crown copyright

Flood Risk Management (Scotland) Act 2009

Science to improve flood forecasting

Flood warning and risk based communication

© Crown copyright

Flood Warning Policy

“…SEPA will aim to reduce the impact of flooding through the provision of actively disseminated, reliable and timely flood warnings to registered users of a national flood warning service.

…and SEPA will aim to provide an effective flood warning service and to reduce the impact of flooding from all sources.”

SEPA (2010) Statement of Intent for Implementing Flood Warning Duties under the Flood Risk Management Scotland Act

© Crown copyright

Service Expectations

“…public expectations around flood warning systems can never be fully met.”

Association of Chief Police Officers (2008) Scottish Parliament Flooding and Flood Management Review, RAE Committee 2nd Report.

© Crown copyright

Hydro-meteorological forecasting

“…the committee recommends that the Scottish Government ensures that SEPA has the necessary funding to enable it to collaborate with the Met Office to provide an effective flood warning system for all types of floods.”

Scottish Government (2008) Scottish Parliament Flooding and Flood Management Review, RAE Committee 2nd Report.

© Crown copyright

National guidance on expected flood risk based on risk based approach (likelihood and impact). Raising vigilance and awareness. Lead time T +5 days

Community level warning when flooding is expected – Immediate Action Required. Lead time T+ 3-6 hours

Administrative authority level scale alerts when flooding is possible – be prepared. Lead time T +24 – 36 hours

© Crown copyright

Flood forecasting on a national scale – Is this achievable?

Grid-to-Grid (G2G) Distributed Model

• Uses spatial datasets on terrain, soil/geology, land-cover • Responds to spatial variation of rainfall input

Distributed Model Structure

Subsurface flow-routing

Saturation-excess surface runoff

Drainage

River

Surface flow-routing

Precipitation Evaporation

Return flow

River flow

Runoff- producing soil column

Acknowledgement: Moore et. al, CEH Wallingford, 2011

G2G Model Performance: R2 Efficiency

2008 Water Year(all configured sites)

Acknowledgement: Moore et. al, CEH Wallingford, 2011

© Crown copyright

Quantitative Precipitation Forecasts

• Deterministic Grid-to-Grid utilises best available (greatest resolution) weather prediction

• Nowcast (2 km)

• UK4 (4 km)

• North Atlantic European (12 km)

• Global (25 km)

• Ensemble Grid-to-Grid utilises current operational MOGREPS-R (18 km)

Flood Forecasting and Warning

MOGREPS members T +54

UKPP, UK4, NAE, GM deterministic T +144

P > 75%

P > 25%

© Crown copyright

• Countrywide assessment of flood risk

• Probability of exceeding flow threshold Q(T)

• Good indication of flooding hotspots

Operational Utility4th January 2012

© Crown copyright

© Crown copyright

Flood Warning

Threshold(Q)

Peak Flow

(Q)

Warning Status

G2GDeterministic

Peak(Q)

G2GMOGREPS

Median(Q)

G2G% ileFW

Crossing

105 395 205 118 75%

112 321 281 224 100%

70 66 59 62 25%

126 110 93 116 25%

© Crown copyright

© Crown copyright

Value of countrywide forecasting• Distributed model provides spatial representation

of forecast risk with lead time of 1-2 days, especially when using probabilities

• Greater accuracy of river flow forecast when using higher resolution deterministic QPF models

• Ensemble-based MOGREPS-R forecasts provide objective assessment of risk on a national scale

© Crown copyright

National guidance on expected flood risk based on risk based approach (likelihood and impact). Raising vigilance and awareness. Lead time T +5 days

Community level warning when flooding is expected – Immediate Action Required. Lead time T+ 3-6 hours

Administrative authority level scale alerts when flooding is possible – be prepared. Lead time T +24 – 36 hours

© Crown copyright

Application for flood warning

“…(the forecast) provided a useful heads up, not only for the potential for high levels especially within the Irvine but also the confidence that could be attributed to these forecasts by seeing the spread of the predicted hydrographs.

…it did mean that … I was more prepared.”

David Fadipe (2012) Flood Warning Duty Officer response to consultation on use of probabilistic forecasts, pers. comms.

© Crown copyright

Conclusions• Greater than ever expectations on flood warning

delivery based on policy drivers

• Significant advances in hydrometeorology with specialists working together

• Use of ensemble prediction good at countrywide scale but higher resolution (storm scale) models needed for flood warning application

• Understanding uncertainties helps risk based flooding guidance and communication