© CNT Energy 2013 Steam System Operation & Distribution Optimization Jayne Choi CNT Energy May 2,...
-
Upload
juan-penberthy -
Category
Documents
-
view
218 -
download
1
Transcript of © CNT Energy 2013 Steam System Operation & Distribution Optimization Jayne Choi CNT Energy May 2,...
![Page 1: © CNT Energy 2013 Steam System Operation & Distribution Optimization Jayne Choi CNT Energy May 2, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062322/56649c865503460f9493d84b/html5/thumbnails/1.jpg)
© CNT Energy 2013
Steam System Operation & Steam System Operation & Distribution OptimizationDistribution Optimization
Jayne Choi
CNT Energy
May 2, 2013
![Page 2: © CNT Energy 2013 Steam System Operation & Distribution Optimization Jayne Choi CNT Energy May 2, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062322/56649c865503460f9493d84b/html5/thumbnails/2.jpg)
© CNT Energy 2013© CNT Energy 2013
CNT EnergyCNT Energy
• A nonprofit organization dedicated to helping communities and consumers save energy and money
• An affiliate of the Center for Neighborhood Technology
• Other CNT affiliates include I-Go Car Sharing
![Page 3: © CNT Energy 2013 Steam System Operation & Distribution Optimization Jayne Choi CNT Energy May 2, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062322/56649c865503460f9493d84b/html5/thumbnails/3.jpg)
© CNT Energy 2013© CNT Energy 2013
CNT EnergyCNT Energy
• We help reduce energy usage and costs in households, buildings, and communities.
• Areas of expertise include: – Dynamic pricing and smart grid– Energy-efficient, green, and healthy
buildings– Regional energy planning
• We manage programs in Illinois and consult nationally and internationally
![Page 4: © CNT Energy 2013 Steam System Operation & Distribution Optimization Jayne Choi CNT Energy May 2, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062322/56649c865503460f9493d84b/html5/thumbnails/4.jpg)
© CNT Energy 2013
PARRPARR
• Current collaboration with GTI as a part of the PARR Building America team– Steam Systems Balancing
and Tuning Study– Heating Season 2011-
2012
![Page 5: © CNT Energy 2013 Steam System Operation & Distribution Optimization Jayne Choi CNT Energy May 2, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062322/56649c865503460f9493d84b/html5/thumbnails/5.jpg)
© CNT Energy 2013
• In Chicago, heating is the focus of residential energy use
• Of the 470,000 multifamily units in the Chicago region, at least 70,000 are steam heated
• Old steam systems often suffer from temperature imbalances– Tenants must use supplemental heat or
open their windows to cool their apartments during the heating season
• Buildings are often overheated
BackgroundBackground
![Page 6: © CNT Energy 2013 Steam System Operation & Distribution Optimization Jayne Choi CNT Energy May 2, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062322/56649c865503460f9493d84b/html5/thumbnails/6.jpg)
© CNT Energy 2013
• Steam heat was the best option for buildings constructed between 1900 and 1930
• Systems have been upgraded from coal to natural gas and many have undergone boiler replacement, but distribution systems remain largely the same
• Not designed for efficiency
(Peterson, 1985)
![Page 7: © CNT Energy 2013 Steam System Operation & Distribution Optimization Jayne Choi CNT Energy May 2, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062322/56649c865503460f9493d84b/html5/thumbnails/7.jpg)
© CNT Energy 2013
Steam Heating BasicsSteam Heating Basics
(Peterson, 1985)
![Page 8: © CNT Energy 2013 Steam System Operation & Distribution Optimization Jayne Choi CNT Energy May 2, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062322/56649c865503460f9493d84b/html5/thumbnails/8.jpg)
© CNT Energy 2013
![Page 9: © CNT Energy 2013 Steam System Operation & Distribution Optimization Jayne Choi CNT Energy May 2, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062322/56649c865503460f9493d84b/html5/thumbnails/9.jpg)
© CNT Energy 2013
![Page 10: © CNT Energy 2013 Steam System Operation & Distribution Optimization Jayne Choi CNT Energy May 2, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062322/56649c865503460f9493d84b/html5/thumbnails/10.jpg)
© CNT Energy 2013
![Page 11: © CNT Energy 2013 Steam System Operation & Distribution Optimization Jayne Choi CNT Energy May 2, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062322/56649c865503460f9493d84b/html5/thumbnails/11.jpg)
© CNT Energy 2013
![Page 12: © CNT Energy 2013 Steam System Operation & Distribution Optimization Jayne Choi CNT Energy May 2, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062322/56649c865503460f9493d84b/html5/thumbnails/12.jpg)
© CNT Energy 2013
Boiler Cycles: In the Boiler RoomBoiler Cycles: In the Boiler Room
Boiler turns on 8 min 30 min
In the boiler room:
![Page 13: © CNT Energy 2013 Steam System Operation & Distribution Optimization Jayne Choi CNT Energy May 2, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062322/56649c865503460f9493d84b/html5/thumbnails/13.jpg)
© CNT Energy 2013
This is what should happen during a boiler cycle; however, there are often problems…
Meanwhile, in a Unit:Meanwhile, in a Unit:
![Page 14: © CNT Energy 2013 Steam System Operation & Distribution Optimization Jayne Choi CNT Energy May 2, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062322/56649c865503460f9493d84b/html5/thumbnails/14.jpg)
© CNT Energy 2013
ProblemsProblems
![Page 15: © CNT Energy 2013 Steam System Operation & Distribution Optimization Jayne Choi CNT Energy May 2, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062322/56649c865503460f9493d84b/html5/thumbnails/15.jpg)
© CNT Energy 2013
![Page 16: © CNT Energy 2013 Steam System Operation & Distribution Optimization Jayne Choi CNT Energy May 2, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062322/56649c865503460f9493d84b/html5/thumbnails/16.jpg)
© CNT Energy 2013
Problem StatementProblem Statement
• Currently steam balancing is not commonly offered as a service or recommended as a measure
• Not tangible – often requires time and dedication rather than basic equipment replacements
• Difficult to convince owners of its value– Balancing is a separate issue from boiler replacement– Natural gas is cheap, so it is not worth the time or effort
![Page 17: © CNT Energy 2013 Steam System Operation & Distribution Optimization Jayne Choi CNT Energy May 2, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062322/56649c865503460f9493d84b/html5/thumbnails/17.jpg)
© CNT Energy 2013
Previous StudiesPrevious Studies• Biederman, N.; Katrakis, J.
(1986). Space Heating Efficiency Improvements in Multifamily Buildings. Chicago: Gas Research Institute
• Peterson, G., (1985). Achieving Even Space Heating in Single Pipe Steam Buildings. Minneapolis: Center for Energy and Environment.
• Improving the balance of buildings provides– Opportunity for cost savings
– 5-15% energy savings, 2-5 year payback
– Increased resident comfort
(Peterson, G., 1985)
![Page 18: © CNT Energy 2013 Steam System Operation & Distribution Optimization Jayne Choi CNT Energy May 2, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062322/56649c865503460f9493d84b/html5/thumbnails/18.jpg)
© CNT Energy 2013
Research QuestionsResearch Questions
• How do steam balancing measures affect the temperature differences in a building?
• Will steam balancing affect the average length of boiler cycles?
• How do steam balancing measures affect natural gas usage?
![Page 19: © CNT Energy 2013 Steam System Operation & Distribution Optimization Jayne Choi CNT Energy May 2, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062322/56649c865503460f9493d84b/html5/thumbnails/19.jpg)
© CNT Energy 2013
Technical ApproachTechnical Approach
• Measures– Replacing radiator vents
– Adding or upgrading main line air venting
– Boiler controls (4-6 sensors, indoor averaging)
![Page 20: © CNT Energy 2013 Steam System Operation & Distribution Optimization Jayne Choi CNT Energy May 2, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062322/56649c865503460f9493d84b/html5/thumbnails/20.jpg)
© CNT Energy 2013
Install steam balancing measures in 10 test buildings:
• Single-pipe steam• 15-30 units• Uneven temperatures
throughout the building (based on observations from the building manager and/or tenants)
![Page 21: © CNT Energy 2013 Steam System Operation & Distribution Optimization Jayne Choi CNT Energy May 2, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062322/56649c865503460f9493d84b/html5/thumbnails/21.jpg)
© CNT Energy 2013
A single point of contact to provide multifamily building owners with access to:
• Technical Assistance– Utility bill analysis– Energy assessment– Cost-effective energy-saving recommendations
• Financing– Low-cost financing through our partner, the
Community Investment Corporation• Construction Oversight• Annual Performance Monitoring
– Two years post-retrofit
Energy Savers ProgramEnergy Savers Program
![Page 22: © CNT Energy 2013 Steam System Operation & Distribution Optimization Jayne Choi CNT Energy May 2, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062322/56649c865503460f9493d84b/html5/thumbnails/22.jpg)
© CNT Energy 2013
Pre-Balancing Natural Gas Usage (For Heating) in Test Buildings
0
20
40
60
80
100
120
140
160
180
1 2 3 4 5 6 7 8 9 10
Buildings
Ene
rgy
Use
Int
ensi
ty
(kB
TU
/sq
ft/y
r)
![Page 23: © CNT Energy 2013 Steam System Operation & Distribution Optimization Jayne Choi CNT Energy May 2, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062322/56649c865503460f9493d84b/html5/thumbnails/23.jpg)
© CNT Energy 2013
• Retrieve pre-upgrade measurements and data for monitoring− Building type and layout− Boiler information/pipe structure/condition of
vents/type of existing controls− Temperature data from units− Boiler run-time data− Tenant survey/heat calls
• Develop detailed scopes for steam balancing work to be done− Measures included replacing radiator vents,
adding or upgrading mainline air vents, and installing boiler controls
− Scopes included price breakdowns for each measure
(http://www.onsetcomp.com/products/data-loggers/u10-003)
![Page 24: © CNT Energy 2013 Steam System Operation & Distribution Optimization Jayne Choi CNT Energy May 2, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062322/56649c865503460f9493d84b/html5/thumbnails/24.jpg)
© CNT Energy 2013
• Construction oversight– Inspection of work/quality control– Boiler control settings
• Collect post-upgrade data– Temperature data from units– Boiler run-time data– Tenant survey/heat calls
• Utility bill analysis comparing pre-upgrade and post-upgrade heating fuel use
– Weather-normalized calculation of heating Energy Use Intensity (kBTU/sq ft/yr)
![Page 25: © CNT Energy 2013 Steam System Operation & Distribution Optimization Jayne Choi CNT Energy May 2, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062322/56649c865503460f9493d84b/html5/thumbnails/25.jpg)
© CNT Energy 2013
Post-Balancing TemperaturesPost-Balancing Temperatures
• Temperature results:– Changes in diurnal temperature patterns within units
(different schedules of when the units were warmest and when they were coolest)
– Smaller temperature differentials between the hottest and coldest units in some buildings
![Page 26: © CNT Energy 2013 Steam System Operation & Distribution Optimization Jayne Choi CNT Energy May 2, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062322/56649c865503460f9493d84b/html5/thumbnails/26.jpg)
© CNT Energy 2013
Tenant ComfortTenant Comfort
Tenant survey responses rating overall temperature comfort. The tenants were asked to rate the overall
temperature comfort within their unit on a scale from 1 = Uncomfortable to 5 = Comfortable.
![Page 27: © CNT Energy 2013 Steam System Operation & Distribution Optimization Jayne Choi CNT Energy May 2, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062322/56649c865503460f9493d84b/html5/thumbnails/27.jpg)
© CNT Energy 2013
Case StudyCase Study
![Page 28: © CNT Energy 2013 Steam System Operation & Distribution Optimization Jayne Choi CNT Energy May 2, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062322/56649c865503460f9493d84b/html5/thumbnails/28.jpg)
© CNT Energy 2013
Pre and Post Natural Gas UsePre and Post Natural Gas Use
![Page 29: © CNT Energy 2013 Steam System Operation & Distribution Optimization Jayne Choi CNT Energy May 2, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062322/56649c865503460f9493d84b/html5/thumbnails/29.jpg)
© CNT Energy 2013
Cost-effectivenessCost-effectiveness
% SavingsBalancing
Cost ($)
Simple Payback (years)
Measured (All buildings)
13.3% 9,434 3.4
Measured (Buildings without additional measures installed)
10.2% 9,875 5.1
![Page 30: © CNT Energy 2013 Steam System Operation & Distribution Optimization Jayne Choi CNT Energy May 2, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062322/56649c865503460f9493d84b/html5/thumbnails/30.jpg)
© CNT Energy 2013
RebatesRebates• Through Peoples/North
Shore Natural Gas Savings Program
• 3+ living units, Service Class 2 (Residential or C&I)
• October 1, 2012 - May 31, 2013
• $200/unit for central steam boiler controls, $50/unit for improved venting
Single Pipe Steam Heating Controls and Balancing
Prescriptive Rebate
![Page 31: © CNT Energy 2013 Steam System Operation & Distribution Optimization Jayne Choi CNT Energy May 2, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062322/56649c865503460f9493d84b/html5/thumbnails/31.jpg)
© CNT Energy 2013
GuidelinesGuidelines
• Developing further balancing guidelines and audit procedures
![Page 32: © CNT Energy 2013 Steam System Operation & Distribution Optimization Jayne Choi CNT Energy May 2, 2013.](https://reader035.fdocuments.us/reader035/viewer/2022062322/56649c865503460f9493d84b/html5/thumbnails/32.jpg)
© CNT Energy 2013
Questions?Questions?
Jayne ChoiSenior Energy Analyst