© Chevron 2005 Chevron Piceance Basin Natural Gas Development Program Northwest Colorado Oil & Gas...

6
© Chevron 2005 Chevron Piceance Basin Natural Gas Development Program Northwest Colorado Oil & Gas Forum Presented by: Michael DeBerry September 4, 2008

Transcript of © Chevron 2005 Chevron Piceance Basin Natural Gas Development Program Northwest Colorado Oil & Gas...

Page 1: © Chevron 2005 Chevron Piceance Basin Natural Gas Development Program Northwest Colorado Oil & Gas Forum Presented by: Michael DeBerry September 4, 2008.

© Chevron 2005

Chevron

Piceance BasinNatural Gas Development Program

Northwest Colorado Oil & Gas Forum

Presented by:Michael DeBerry

September 4, 2008

Page 2: © Chevron 2005 Chevron Piceance Basin Natural Gas Development Program Northwest Colorado Oil & Gas Forum Presented by: Michael DeBerry September 4, 2008.

2© Chevron 2005 Chevron Mid-Continent Business Unit

Piceance Natural Gas Program Update

•Two Recent Hand Injuries that Required Medical Attention

•83 Wells on 4 Pads Have Been Drilled to Date

•H&P Rig 318 Celebrated One Year Injury Free

•KSI (Construction Contractor) Completed One Year Injury Free

•30 Inch Sales Pipeline Completed in August 2008

•Currently Flowing 5MMCFD

•Gas is Being Processed by Enterprise

•Enhanced Performance Through Technology/Process Improvements

Page 3: © Chevron 2005 Chevron Piceance Basin Natural Gas Development Program Northwest Colorado Oil & Gas Forum Presented by: Michael DeBerry September 4, 2008.

3© Chevron 2005 Chevron Mid-Continent Business Unit

Well Design

TD – 200’ below the WF. Average TVD ~ 5,800’.

KOP – Minimum 200’

Max Build Rate – 3o / 100’

Max Inclination – 40o

Max Drop Rate - 2o / 100’

Average Departure ~ 1100’.

Section 25 shown with 64, 10 acre wells hit from three pads in valley location.

Page 4: © Chevron 2005 Chevron Piceance Basin Natural Gas Development Program Northwest Colorado Oil & Gas Forum Presented by: Michael DeBerry September 4, 2008.

4© Chevron 2005 Chevron Mid-Continent Business Unit

Piceance Natural Gas Program Update cont.

•ESHIA Being Implemented into Project Management Plan Plan Replaced Produced Water Pond with Tanks Steadily Expanding Environmental Monitoring

Programs – Water Quality and Wildlife

•Finalized $25M Agreement with Garfield County for CR 204

•Granted a $45K Grant to the De Beque School District for a Computer Lab, Software and Hardware

Page 5: © Chevron 2005 Chevron Piceance Basin Natural Gas Development Program Northwest Colorado Oil & Gas Forum Presented by: Michael DeBerry September 4, 2008.

5© Chevron 2005 Chevron Mid-Continent Business Unit

Piceance Natural Gas Program Update cont.

• Partnering with the Tamarisk Coalition on the Watson Island Project

Eradication and Re-vegetation along a 70 mile stretch of the Colorado River

•Major Sponsor for the Robb River Rally on Sept. 13th

A Community Biking/Running Event to Continue the Vision of Completing a Trail System Along the Colorado River from Garfield County to Utah and from Grand Junction to Delta along the Gunnison River

Page 6: © Chevron 2005 Chevron Piceance Basin Natural Gas Development Program Northwest Colorado Oil & Gas Forum Presented by: Michael DeBerry September 4, 2008.

6© Chevron 2005 Chevron Mid-Continent Business Unit

The Future of the Piceance Program

• Continue Operating the Current Two Drilling Rigs Until Mid 2010.

•Continue Infrastructure Installation in the Clear Creek Valley.

•Central Production Facility Commissioning Targeted for Second Quarter 2009.

•Continue Interim Production Operations Until Facility Commissioning.

•Limited Well Completion Activity Until Second Quarter 2009.