Vision : An India self sufficient in power andInfrastructure requirements withPerennial as one of the key contributors.
MISSION : We at Perennial Technologies shall strive to be thenation's leading package power suppliers, offeringturnkey power solutions for all sectors acrossindustry. We shall achieve this by maintaining highstandards of quality in all the products and services weoffer, aiming towards zero defects in whatever we do.
Our Inspiration …….
ABOUT US
• Started By Mr.Yashwant Desai - Head at Kirloskar Oil Engines Ltd for 20 Years
• Established In-2005
• Turnover- 18 Cr Plus for financial year 2011
• Growth-200% YoY
• 150 plus Manpower
• 20 Engineers
• 8-9 MBA’S
• Current Capacity-50MW
• Group Capacity – more than 100 MW
• Operations in the 10-12 States of India
ABOUT US
• Our Banking and Finance partners
• Business and Technology Partners
Our Divisions
1. Power Rental
2. Operation & Maintenance
3. Project Engineering-Electrical Tunkey
4. Gas Based Power Generation
OUR INFRASTRUCTURE
• Narhe Gaon Pune-For Smaller DG set ( Range 15KVA to 125KVA)
• Kondhwa Pune-For Smaller DG sets ( Range 250KVA to 750KVA)
• Rabale & Taloja Mumbai - For the Bigger DG sets (Range 500Kva to 2000kva)
• Upcoming Facility-Pirangut Pune
• Vehicle for Diesel & Equipment Handling
Expertise
1. Mr.Ramesh Dhake (GM-Mechanical)
• Having 40 years Experience in Petro- Chemical, Process and the Manufacturingindustries like Tata Power, NOCIL, Burma Shell, Reliance Industries, HICOProducts ltd , Kisan Fertilizers ltd,International Biotech Park
• Having the hands on the projects like HVAC, Process Piping, MEP Projects.
2. Mr. Sharma (Substation Engineering)
3 . Mr.Rahalkar (GM-Electrical)
• Having 35 years Experience in Power generation industries like GREAVESCOTTON,CUMMINS INDIA etc.
• Having the hands on the projects like Control panel design, Co-generationSystem Design, Electrical System Design etc.
ONGOING Projects
Client - RTC HOTELS LTD
Area - Pimpri,Pune
Type of industry - Hotels
Type of work - Electrification of Commercial Building including Panel Supply,Cables
Completion Time - 4 Months
Value - 40 lacs
Completed Projects
Client - General Motor India
Area - Talegaon,Pune
Type of industry - Automobile
Capacity - 3MW with Power Distribution Panel
Contract Period - 6 months
Value - 100 lacs
Purpose - For Total Paint Shop Power Backup
Completed Projects
Client - Volkswagen India
Area - Chakan,Pune
Type of industry - Automobile
Capacity - 4MW with power distribution & Automation System
Contract Period - 1Year & Still Running(2MW)
Value - 300 Lacs
Purpose -For the Construction & Testing of the Critical Equipment
Completed Projects
Client - Techmahindra Ltd
Area - Hinjewadi,Pune
Type of industry - IT/ITES
Capacity - 3MW with Power distribution Panel
Contract Period - 6 Months
Purpose - For the Complete IT Park Running in the Absence Of Grid.
Completed Projects
Client - Wipro Ltd
Area - Hinjewadi,Pune
Type of industry - IT/ITES
Capacity - 1MW with Power distribution Panel & with internal Wiring
Contract Period - 6 MonthsPurpose - For the Construction of the Plant & as a backup power in the absence
of Grid.
Completed Projects
Client - HPCL Biofuels Ltd ( Navratna)
Area - Sugauli & Lauria,Bihar
Type of industry - Oil & Gas
Capacity - 12MW,415/11kv Power with Complete HT System
Contract Period - 3 Months
Value - 500 Lacs
Purpose -To Meet the Sugarcane Crop Season Crushing in the Peak PeriodDue to Unavailability of the Grid Supply .
Completed Projects
Client - IOCL Ltd ( Maharatna)
Area - Paradeep,Orisaa
Type of industry - Oil & Gas
Capacity - 4MVA,415/6.6kv Power with Complete LT/HT System
Contract Period - 1 Year (Running)
Value - 150 Lacs
Purpose- For catering the essential loads of the Paradip station of Paradip-HaldiaCrude Pipeline during the period of non-availability of Grid power supply fromCESCO / during Switchyard Maintenance
Completed Projects
Client - KSPG Automotive India
Area - Kanhe Phata, Pune
Type of industry - Automobile Component
Capacity - 2MVA with power Distribution & Automation System ( 24/7 Hrs Basis)
Contract Period - 2 Years (Running)
Purpose- For Running the whole plant Due to unavailability of the Grid & Supplying thePower On unit Basis
Completed Projects
Client - Indiabulls Power Ltd
Area - Amravati
Type of industry - Power Plant
Capacity - 1MVA with power Distribution Panels
Contract Period - 3 Months (Running)
Purpose- - For the Construction & testing of the power plant.
Completed Projects
Client - Riddhi Siddhi Gluco Biols Ltd.
Area - Gokak,Karnatka
Type of industry - Sugar Plant
Capacity - 2mw with power Distribution & Automation System
Contract Period - 6 months (Running)
Purpose - For the Running of critical Equipment & back up power incase of unavailability of the Grid.
Completed Projects
Client - Bajaj Allianz Ltd.
Area -Yerwada, Pune
Type of industry - Insurance Industry
Capacity - 1MVA with power Distribution System & Operation of the other Utilities
Contract Period - 1 year (Running)
Purpose - Back up power in case of unavailability of the Grid.
Completed Projects
Client - BSNL LTD.
Area -Koregaon Park,Pune
Type of industry - Telecom
Capacity - 2MVA with power Distribution System
Completion Time Period - 3 Month
Value – 80 Lacs
Purpose - Installation of 1500KVA DG sets
ABOUT US•
1. As Perennial we are investing in Research and development under theleadership of Mr. Rahalkar :
• Projects Are in field of Gas Engine, Power Distribution and Co- Generation
HEAVY MOTOR STARTING
MG SET FOR PF IMPROVEMENT
11 KV415 VOLT
560 KWDOLMOTOR
2 X 1500 KVA DG
300 KW MOTOR+ 1500 KVAALTERNATOR
3 X CONTROLLER
www.powerrental.co.in
HEAVY MOTOR STARTING
MG SET FOR PF IMPROVEMENT
PROBLEM
1 – HEAVY MOTOR STARTING
2 – ENGINE SPEED DOES NOT DROP
3 – ALTERNATOR VOLTAGE DIPS
4 – LOAD PF VERY LOW DURING STARTING
5 – NOT ECONOMICAL TO ADD NEW DG
www.powerrental.co.in
HEAVY MOTOR STARTING
MG SET FOR PF IMPROVEMENT
SOLUTION
1 – WE NEED KVAR SUPPLEMENT for PF IMPROVEMENT
2 – SOLUTION SHOULD BE FAST ACTING
3 – PROVIDE MG SET IN PARALLEL TO 2 DG SETS.
4 – SMALL MOTOR OF MG SET MEANT ONLY FOR STARTING
5 – ALTERNATOR OF MG SET IMPROVES DG PF INSTANTLY.
6 – NO DIESEL CONSUMPTION FOR MG SET
7 – LOWER CAPITAL COST COMPARED TO EXTRA DG SET.
www.powerrental.co.in
BREAK LESS PUMP
BEARING
COUPLING
FLYWHEEL
PUMP MOTOR
BASE FRAME
DRIVE
GRID SUPPLY
GEAR BOXENGINECLUTCH
www.powerrental.co.in
STAGE 3ROTARY UPS
CRITICALLOAD , NOBREAKPERMITTED
UNHEALTHY GRIDWITH OUTAGE
AC BATTERY
INDUCTION DG
POWERPUMP
CONTROLS
11 KV415 VOLT
560 KWDOLMOTOR
2 X 1500 KVA DG
300 KW MOTOR+ 1500 KVAALTERNATOR
3 X CONTROLLER
ROTARY APFC
www.powerrental.co.in
1500 KVA DG
DUAL FUEL GEN.SET( DIESEL + BIOGAS )
EX. TEMP. , EX. OXYGEN ,ACTUATOR VOLT , INJECTORVOLTAGE , ECU FLOW OUTPUT ,VACUUM PR , ENGINE SPPED ,ENGINE FAULT ETC.
ONOFF VALVE , BUTTERFLYVALVE , ACTUATOR/ AMPLIFIER ,BREAKER
KW TRANSDUCER
GAS PR , GAS TEMP. ,
www.powerrental.co.in
PROJECT PICS
Fujitsu Consulting Site
HPCL BIOFUELS BIHAR
HPCL BIOFUELS BIHAR
HPCL BIOFUELS BIHAR
HPCL BIOFUELS BIHAR
HPCL BIOFUELS BIHAR
HPCL BIOFUELS BIHAR
HPCL BIOFUELS BIHAR
IOCL LTD,ORISSA
IOCL LTD,ORISSA
IRB SOLAPUR HIGHWAY
PIERBURG INDIA,PUNE
PIERBURG INDIA,PUNE
BAJAJ ALLIANZE, PUNE
BAJAJ ALLIANZE, PUNE
Head office & branchHead OfficePerennial Technologies Pvt. Ltd.Perennial House, NDA – Pashan LinkRoad,BavdhanBk,Pune-411021.
Mr. Yogesh Desai +91 9881098899
Mr. Baxi +91 9764448853
Mr. Narsing Agarwal +91 9764448860(for Projects)
Mr. Sarang Garud +91 9764448851(for Gas Based Rental)
Mr.Dange +91 9764448852(Operation & Maintenance)
Nasik & Rest ofMaharashtra
Mumbai
Mr. Dange /+91 9764448852 Mr.Narsing Agrawal
West Bengal 09764448860
Mr. Baswajit Rai / +919433573166
Karnataka & Tamilnadu
Mr. Nitin / +919764448854