: An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group...

47

Transcript of : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group...

Page 1: : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group Capacity – more than 100 MW • Operations in the 10-12 States of India . ABOUT US
Page 2: : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group Capacity – more than 100 MW • Operations in the 10-12 States of India . ABOUT US

Vision : An India self sufficient in power andInfrastructure requirements withPerennial as one of the key contributors.

MISSION : We at Perennial Technologies shall strive to be thenation's leading package power suppliers, offeringturnkey power solutions for all sectors acrossindustry. We shall achieve this by maintaining highstandards of quality in all the products and services weoffer, aiming towards zero defects in whatever we do.

Our Inspiration …….

Page 3: : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group Capacity – more than 100 MW • Operations in the 10-12 States of India . ABOUT US

ABOUT US

• Started By Mr.Yashwant Desai - Head at Kirloskar Oil Engines Ltd for 20 Years

• Established In-2005

• Turnover- 18 Cr Plus for financial year 2011

• Growth-200% YoY

• 150 plus Manpower

• 20 Engineers

• 8-9 MBA’S

• Current Capacity-50MW

• Group Capacity – more than 100 MW

• Operations in the 10-12 States of India

Page 4: : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group Capacity – more than 100 MW • Operations in the 10-12 States of India . ABOUT US

ABOUT US

• Our Banking and Finance partners

• Business and Technology Partners

Page 5: : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group Capacity – more than 100 MW • Operations in the 10-12 States of India . ABOUT US

Our Divisions

1. Power Rental

2. Operation & Maintenance

3. Project Engineering-Electrical Tunkey

4. Gas Based Power Generation

Page 6: : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group Capacity – more than 100 MW • Operations in the 10-12 States of India . ABOUT US

OUR INFRASTRUCTURE

• Narhe Gaon Pune-For Smaller DG set ( Range 15KVA to 125KVA)

• Kondhwa Pune-For Smaller DG sets ( Range 250KVA to 750KVA)

• Rabale & Taloja Mumbai - For the Bigger DG sets (Range 500Kva to 2000kva)

• Upcoming Facility-Pirangut Pune

• Vehicle for Diesel & Equipment Handling

Page 7: : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group Capacity – more than 100 MW • Operations in the 10-12 States of India . ABOUT US

Expertise

1. Mr.Ramesh Dhake (GM-Mechanical)

• Having 40 years Experience in Petro- Chemical, Process and the Manufacturingindustries like Tata Power, NOCIL, Burma Shell, Reliance Industries, HICOProducts ltd , Kisan Fertilizers ltd,International Biotech Park

• Having the hands on the projects like HVAC, Process Piping, MEP Projects.

2. Mr. Sharma (Substation Engineering)

3 . Mr.Rahalkar (GM-Electrical)

• Having 35 years Experience in Power generation industries like GREAVESCOTTON,CUMMINS INDIA etc.

• Having the hands on the projects like Control panel design, Co-generationSystem Design, Electrical System Design etc.

Page 8: : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group Capacity – more than 100 MW • Operations in the 10-12 States of India . ABOUT US

ONGOING Projects

Client - RTC HOTELS LTD

Area - Pimpri,Pune

Type of industry - Hotels

Type of work - Electrification of Commercial Building including Panel Supply,Cables

Completion Time - 4 Months

Value - 40 lacs

Page 9: : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group Capacity – more than 100 MW • Operations in the 10-12 States of India . ABOUT US

Completed Projects

Client - General Motor India

Area - Talegaon,Pune

Type of industry - Automobile

Capacity - 3MW with Power Distribution Panel

Contract Period - 6 months

Value - 100 lacs

Purpose - For Total Paint Shop Power Backup

Page 10: : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group Capacity – more than 100 MW • Operations in the 10-12 States of India . ABOUT US

Completed Projects

Client - Volkswagen India

Area - Chakan,Pune

Type of industry - Automobile

Capacity - 4MW with power distribution & Automation System

Contract Period - 1Year & Still Running(2MW)

Value - 300 Lacs

Purpose -For the Construction & Testing of the Critical Equipment

Page 11: : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group Capacity – more than 100 MW • Operations in the 10-12 States of India . ABOUT US

Completed Projects

Client - Techmahindra Ltd

Area - Hinjewadi,Pune

Type of industry - IT/ITES

Capacity - 3MW with Power distribution Panel

Contract Period - 6 Months

Purpose - For the Complete IT Park Running in the Absence Of Grid.

Page 12: : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group Capacity – more than 100 MW • Operations in the 10-12 States of India . ABOUT US

Completed Projects

Client - Wipro Ltd

Area - Hinjewadi,Pune

Type of industry - IT/ITES

Capacity - 1MW with Power distribution Panel & with internal Wiring

Contract Period - 6 MonthsPurpose - For the Construction of the Plant & as a backup power in the absence

of Grid.

Page 13: : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group Capacity – more than 100 MW • Operations in the 10-12 States of India . ABOUT US

Completed Projects

Client - HPCL Biofuels Ltd ( Navratna)

Area - Sugauli & Lauria,Bihar

Type of industry - Oil & Gas

Capacity - 12MW,415/11kv Power with Complete HT System

Contract Period - 3 Months

Value - 500 Lacs

Purpose -To Meet the Sugarcane Crop Season Crushing in the Peak PeriodDue to Unavailability of the Grid Supply .

Page 14: : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group Capacity – more than 100 MW • Operations in the 10-12 States of India . ABOUT US

Completed Projects

Client - IOCL Ltd ( Maharatna)

Area - Paradeep,Orisaa

Type of industry - Oil & Gas

Capacity - 4MVA,415/6.6kv Power with Complete LT/HT System

Contract Period - 1 Year (Running)

Value - 150 Lacs

Purpose- For catering the essential loads of the Paradip station of Paradip-HaldiaCrude Pipeline during the period of non-availability of Grid power supply fromCESCO / during Switchyard Maintenance

Page 15: : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group Capacity – more than 100 MW • Operations in the 10-12 States of India . ABOUT US

Completed Projects

Client - KSPG Automotive India

Area - Kanhe Phata, Pune

Type of industry - Automobile Component

Capacity - 2MVA with power Distribution & Automation System ( 24/7 Hrs Basis)

Contract Period - 2 Years (Running)

Purpose- For Running the whole plant Due to unavailability of the Grid & Supplying thePower On unit Basis

Page 16: : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group Capacity – more than 100 MW • Operations in the 10-12 States of India . ABOUT US

Completed Projects

Client - Indiabulls Power Ltd

Area - Amravati

Type of industry - Power Plant

Capacity - 1MVA with power Distribution Panels

Contract Period - 3 Months (Running)

Purpose- - For the Construction & testing of the power plant.

Page 17: : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group Capacity – more than 100 MW • Operations in the 10-12 States of India . ABOUT US

Completed Projects

Client - Riddhi Siddhi Gluco Biols Ltd.

Area - Gokak,Karnatka

Type of industry - Sugar Plant

Capacity - 2mw with power Distribution & Automation System

Contract Period - 6 months (Running)

Purpose - For the Running of critical Equipment & back up power incase of unavailability of the Grid.

Page 18: : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group Capacity – more than 100 MW • Operations in the 10-12 States of India . ABOUT US

Completed Projects

Client - Bajaj Allianz Ltd.

Area -Yerwada, Pune

Type of industry - Insurance Industry

Capacity - 1MVA with power Distribution System & Operation of the other Utilities

Contract Period - 1 year (Running)

Purpose - Back up power in case of unavailability of the Grid.

Page 19: : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group Capacity – more than 100 MW • Operations in the 10-12 States of India . ABOUT US

Completed Projects

Client - BSNL LTD.

Area -Koregaon Park,Pune

Type of industry - Telecom

Capacity - 2MVA with power Distribution System

Completion Time Period - 3 Month

Value – 80 Lacs

Purpose - Installation of 1500KVA DG sets

Page 20: : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group Capacity – more than 100 MW • Operations in the 10-12 States of India . ABOUT US

ABOUT US•

Page 21: : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group Capacity – more than 100 MW • Operations in the 10-12 States of India . ABOUT US

1. As Perennial we are investing in Research and development under theleadership of Mr. Rahalkar :

• Projects Are in field of Gas Engine, Power Distribution and Co- Generation

Page 22: : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group Capacity – more than 100 MW • Operations in the 10-12 States of India . ABOUT US

HEAVY MOTOR STARTING

MG SET FOR PF IMPROVEMENT

11 KV415 VOLT

560 KWDOLMOTOR

2 X 1500 KVA DG

300 KW MOTOR+ 1500 KVAALTERNATOR

3 X CONTROLLER

www.powerrental.co.in

Page 23: : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group Capacity – more than 100 MW • Operations in the 10-12 States of India . ABOUT US

HEAVY MOTOR STARTING

MG SET FOR PF IMPROVEMENT

PROBLEM

1 – HEAVY MOTOR STARTING

2 – ENGINE SPEED DOES NOT DROP

3 – ALTERNATOR VOLTAGE DIPS

4 – LOAD PF VERY LOW DURING STARTING

5 – NOT ECONOMICAL TO ADD NEW DG

www.powerrental.co.in

Page 24: : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group Capacity – more than 100 MW • Operations in the 10-12 States of India . ABOUT US

HEAVY MOTOR STARTING

MG SET FOR PF IMPROVEMENT

SOLUTION

1 – WE NEED KVAR SUPPLEMENT for PF IMPROVEMENT

2 – SOLUTION SHOULD BE FAST ACTING

3 – PROVIDE MG SET IN PARALLEL TO 2 DG SETS.

4 – SMALL MOTOR OF MG SET MEANT ONLY FOR STARTING

5 – ALTERNATOR OF MG SET IMPROVES DG PF INSTANTLY.

6 – NO DIESEL CONSUMPTION FOR MG SET

7 – LOWER CAPITAL COST COMPARED TO EXTRA DG SET.

www.powerrental.co.in

Page 25: : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group Capacity – more than 100 MW • Operations in the 10-12 States of India . ABOUT US

BREAK LESS PUMP

BEARING

COUPLING

FLYWHEEL

PUMP MOTOR

BASE FRAME

DRIVE

GRID SUPPLY

GEAR BOXENGINECLUTCH

www.powerrental.co.in

Page 26: : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group Capacity – more than 100 MW • Operations in the 10-12 States of India . ABOUT US

STAGE 3ROTARY UPS

CRITICALLOAD , NOBREAKPERMITTED

UNHEALTHY GRIDWITH OUTAGE

AC BATTERY

INDUCTION DG

POWERPUMP

CONTROLS

Page 27: : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group Capacity – more than 100 MW • Operations in the 10-12 States of India . ABOUT US

11 KV415 VOLT

560 KWDOLMOTOR

2 X 1500 KVA DG

300 KW MOTOR+ 1500 KVAALTERNATOR

3 X CONTROLLER

ROTARY APFC

www.powerrental.co.in

Page 28: : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group Capacity – more than 100 MW • Operations in the 10-12 States of India . ABOUT US

1500 KVA DG

DUAL FUEL GEN.SET( DIESEL + BIOGAS )

EX. TEMP. , EX. OXYGEN ,ACTUATOR VOLT , INJECTORVOLTAGE , ECU FLOW OUTPUT ,VACUUM PR , ENGINE SPPED ,ENGINE FAULT ETC.

ONOFF VALVE , BUTTERFLYVALVE , ACTUATOR/ AMPLIFIER ,BREAKER

KW TRANSDUCER

GAS PR , GAS TEMP. ,

www.powerrental.co.in

Page 29: : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group Capacity – more than 100 MW • Operations in the 10-12 States of India . ABOUT US

PROJECT PICS

Page 30: : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group Capacity – more than 100 MW • Operations in the 10-12 States of India . ABOUT US

Fujitsu Consulting Site

Page 31: : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group Capacity – more than 100 MW • Operations in the 10-12 States of India . ABOUT US

HPCL BIOFUELS BIHAR

Page 32: : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group Capacity – more than 100 MW • Operations in the 10-12 States of India . ABOUT US
Page 33: : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group Capacity – more than 100 MW • Operations in the 10-12 States of India . ABOUT US

HPCL BIOFUELS BIHAR

Page 34: : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group Capacity – more than 100 MW • Operations in the 10-12 States of India . ABOUT US

HPCL BIOFUELS BIHAR

Page 35: : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group Capacity – more than 100 MW • Operations in the 10-12 States of India . ABOUT US

HPCL BIOFUELS BIHAR

Page 36: : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group Capacity – more than 100 MW • Operations in the 10-12 States of India . ABOUT US

HPCL BIOFUELS BIHAR

Page 37: : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group Capacity – more than 100 MW • Operations in the 10-12 States of India . ABOUT US

HPCL BIOFUELS BIHAR

Page 38: : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group Capacity – more than 100 MW • Operations in the 10-12 States of India . ABOUT US

HPCL BIOFUELS BIHAR

Page 39: : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group Capacity – more than 100 MW • Operations in the 10-12 States of India . ABOUT US

IOCL LTD,ORISSA

Page 40: : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group Capacity – more than 100 MW • Operations in the 10-12 States of India . ABOUT US

IOCL LTD,ORISSA

Page 41: : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group Capacity – more than 100 MW • Operations in the 10-12 States of India . ABOUT US

IRB SOLAPUR HIGHWAY

Page 42: : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group Capacity – more than 100 MW • Operations in the 10-12 States of India . ABOUT US

PIERBURG INDIA,PUNE

Page 43: : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group Capacity – more than 100 MW • Operations in the 10-12 States of India . ABOUT US

PIERBURG INDIA,PUNE

Page 44: : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group Capacity – more than 100 MW • Operations in the 10-12 States of India . ABOUT US

BAJAJ ALLIANZE, PUNE

Page 45: : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group Capacity – more than 100 MW • Operations in the 10-12 States of India . ABOUT US

BAJAJ ALLIANZE, PUNE

Page 46: : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group Capacity – more than 100 MW • Operations in the 10-12 States of India . ABOUT US

Head office & branchHead OfficePerennial Technologies Pvt. Ltd.Perennial House, NDA – Pashan LinkRoad,BavdhanBk,Pune-411021.

Mr. Yogesh Desai +91 9881098899

Mr. Baxi +91 9764448853

Mr. Narsing Agarwal +91 9764448860(for Projects)

Mr. Sarang Garud +91 9764448851(for Gas Based Rental)

Mr.Dange +91 9764448852(Operation & Maintenance)

Nasik & Rest ofMaharashtra

Mumbai

Mr. Dange /+91 9764448852 Mr.Narsing Agrawal

West Bengal 09764448860

Mr. Baswajit Rai / +919433573166

Karnataka & Tamilnadu

Mr. Nitin / +919764448854

OrissaMr. Amit Thander / +919764448855

Andhra PradeshMr. Vivek Deshpande /+91 9764448858

Area Offices:

Page 47: : An India self sufficient in power and · • 8-9 MBA’S • Current Capacity-50MW • Group Capacity – more than 100 MW • Operations in the 10-12 States of India . ABOUT US

New Website we have launched Recentlywww.powerrental.co.in