© ABB Group Smart Oilfield and Platforms Case Study – ONGC Enterprise wide SCADA.
-
Upload
aleesha-dean -
Category
Documents
-
view
229 -
download
2
Transcript of © ABB Group Smart Oilfield and Platforms Case Study – ONGC Enterprise wide SCADA.
© A
BB
Gro
up
Smart Oilfield and Smart Oilfield and PlatformsPlatformsCase Study – Case Study – ONGC Enterprise wide ONGC Enterprise wide SCADASCADA
Present Oil Field and Platform Operation Practices
Concept of Smart Oilfield and PlatformsConcept of Smart Oilfield and Platforms
Smart Oilfield and Platforms – Detailed ViewSmart Oilfield and Platforms – Detailed View InstrumentationInstrumentation
AutomationAutomation
CommunicationCommunication
ApplicationsApplications
Business & Scientific System IntegrationBusiness & Scientific System Integration
Case Study – ONGC Enterprise wide SCADACase Study – ONGC Enterprise wide SCADA
Agenda of PresentationAgenda of Presentation
Following are the issues faced by the Following are the issues faced by the Operating companies.Operating companies.
Skilled manpower shortageSkilled manpower shortage
Accuracy and Efficiency of processesAccuracy and Efficiency of processes
Data Validation, Recording is an issueData Validation, Recording is an issue
Insufficient history information for the Insufficient history information for the Analysis and comparisons or biased Analysis and comparisons or biased informationinformation
No mechanism to identify the pipeline No mechanism to identify the pipeline leakages as well as the theftsleakages as well as the thefts
Inaccurate flow measurement due to non Inaccurate flow measurement due to non use of standard flow measurement use of standard flow measurement practicespractices
No online water cut measurement No online water cut measurement resulting in delays in corrective actionresulting in delays in corrective action
No control in the separator makes the No control in the separator makes the process unstable.process unstable.
Excess energy consumption due to Excess energy consumption due to improper temperature control at heater improper temperature control at heater treatertreater
Safety work practisesSafety work practises
Manual reporting and CalculationManual reporting and Calculation
Present Operation PracticesPresent Operation Practices
Present Oil Field and Platform Operation Practices
Concept of Smart Oilfield and PlatformsConcept of Smart Oilfield and Platforms
Smart Oilfield and Platforms – Detailed ViewSmart Oilfield and Platforms – Detailed View InstrumentationInstrumentation
AutomationAutomation
CommunicationCommunication
ApplicationsApplications
Business & Scientific System IntegrationBusiness & Scientific System Integration
Case Study – ONGC Enterprise wide SCADACase Study – ONGC Enterprise wide SCADA
Agenda of PresentationsAgenda of Presentations
Concept Of Smart Oilfield and Concept Of Smart Oilfield and PlatformsPlatforms
The Smart Oilfield and Platforms The Smart Oilfield and Platforms Provide Well head telemetry supervision and controlProvide Well head telemetry supervision and control
Provide Real time Monitoring and Control of Provide Real time Monitoring and Control of Manned, Unmanned and Remote location at Manned, Unmanned and Remote location at centralises place.centralises place.
Provides minimum Human Intervention in day to Provides minimum Human Intervention in day to day operations day operations
Provide Stabilised production and Transportations Provide Stabilised production and Transportations process as well as Optimisationsprocess as well as Optimisations
Prevent transportation losses in PipelinesPrevent transportation losses in Pipelines
Provide real time data Consolidation, Recording and Provide real time data Consolidation, Recording and storage for the analysis for future evaluationsstorage for the analysis for future evaluations
Reduce the delay in decision making via online Reduce the delay in decision making via online measurements of critical parameters such as Water measurements of critical parameters such as Water cut, Gas Composition etccut, Gas Composition etc
Provide all real time KPI ( Key Performance Provide all real time KPI ( Key Performance Indicators ) to Corporate level/ Board level for quick Indicators ) to Corporate level/ Board level for quick decision makingdecision making
Standardisation on SCADA, devices and Standardisation on SCADA, devices and communications simplifies training and communications simplifies training and maintenancemaintenance
Significantly reduces downtime by being proactive Significantly reduces downtime by being proactive in operating abnormal conditionsin operating abnormal conditions
To Convert an Oil Field to Smart Oil Field following are To Convert an Oil Field to Smart Oil Field following are major contents major contents
Suitable Suitable InstrumentationInstrumentation on well head and Production, on well head and Production, Storage and Transportation facilities for real time Storage and Transportation facilities for real time measurement as per the standard guidelines.measurement as per the standard guidelines.
Automation systemAutomation system to monitor, control the Production to monitor, control the Production facilities of different location providing unbiased facilities of different location providing unbiased information to Stabilise the production, transportation information to Stabilise the production, transportation process. Integration of different levels of automation to process. Integration of different levels of automation to ensure data consolidation ensure data consolidation
CommunicationCommunication (WAN) to make Hierarchical Automations (WAN) to make Hierarchical Automations system to provide asset/corporate level consolidation of the system to provide asset/corporate level consolidation of the multiple production, transportation and Storage systems multiple production, transportation and Storage systems spread across Cities, States and Countriesspread across Cities, States and Countries
ApplicationsApplications to carryout production process optimisation, to carryout production process optimisation, Pump optimisation, Make optimum use of the energy in the Pump optimisation, Make optimum use of the energy in the form of Gas used for the Gas Lift, Electricity used for form of Gas used for the Gas Lift, Electricity used for ESP,SRP etcESP,SRP etc
IntegrationIntegration with Scientific and Business system for with Scientific and Business system for Operational efficiency improvements, strategic Decision Operational efficiency improvements, strategic Decision MakingMaking
Concept Of Smart Oilfield and Concept Of Smart Oilfield and PlatformsPlatforms
Present Oil Field and Platform Operation Practices
Concept of Smart Oilfield and PlatformsConcept of Smart Oilfield and Platforms
Smart Oilfield and Platforms – Detailed ViewSmart Oilfield and Platforms – Detailed View InstrumentationInstrumentation
AutomationAutomation
CommunicationCommunication
ApplicationsApplications
Business & Scientific System IntegrationBusiness & Scientific System Integration
Case Study – ONGC Enterprise wide SCADACase Study – ONGC Enterprise wide SCADA
Agenda of PresentationsAgenda of Presentations
Instrumentation and devices on Well head Instrumentation and devices on Well head Well head to have pressure temperature Well head to have pressure temperature
measurement asmeasurement as Pressure, temperatures and flowsPressure, temperatures and flows
Chemical injection ratesChemical injection rates
Water injection ratesWater injection rates
Downhole instrumentationDownhole instrumentation
All instrumentation must be low power instrument All instrumentation must be low power instrument
Data from Well head instrument to be consolidated Data from Well head instrument to be consolidated in a device such as an RTU, PLC, VSD or othersin a device such as an RTU, PLC, VSD or others
Device should be low powered and provide Radio Device should be low powered and provide Radio communication to the central Facilitycommunication to the central Facility
Devices should be capable of implementing ControlDevices should be capable of implementing Control
Well shutdowns based on emissions, facilities Well shutdowns based on emissions, facilities upsetupset
Dedicated devices with history retention Dedicated devices with history retention
Well Optimisation through pump, pressure, Well Optimisation through pump, pressure, injection and/or flow controlinjection and/or flow control
Smart Oilfield and Platforms - Smart Oilfield and Platforms - InstrumentationsInstrumentations
Instrumentation at Facilities Instrumentation at Facilities Mass flow with API corrections is the most accurate Mass flow with API corrections is the most accurate
way to measure liquidsway to measure liquids
AGA is the recommended standard for measuring gasAGA is the recommended standard for measuring gas
Gas Chromatograph for Gas Composition Gas Chromatograph for Gas Composition measurementmeasurement
NOC to calculate Water cut measurementNOC to calculate Water cut measurement
Storage tanks Level Measurement with API Storage tanks Level Measurement with API Corrections Corrections
Group Separator Level measurement can be through Group Separator Level measurement can be through Interface level transmittersInterface level transmitters
Control Valves for the level and pressure control of Control Valves for the level and pressure control of Group SeparatorsGroup Separators
Suitable LACT and Gas Custody transfer metersSuitable LACT and Gas Custody transfer meters
Flare Gas Measurement through suitable flow metersFlare Gas Measurement through suitable flow meters
Turbidity meter for solid particals measurement in Turbidity meter for solid particals measurement in water disposed – Environment / Pollution water disposed – Environment / Pollution requirementrequirement
Instrumentation for the Gas Compressor efficiency Instrumentation for the Gas Compressor efficiency calculationscalculations
Use of FF based instruments for diagnostic Use of FF based instruments for diagnostic information and Asset Management applicationsinformation and Asset Management applications
Smart Oilfield and Platforms - Smart Oilfield and Platforms - InstrumentationInstrumentation
Automation at well headAutomation at well head
Well head based measurement to provide Well head based measurement to provide remote Shut Down Access on the well headremote Shut Down Access on the well head
Choke control to reduce the Sludge effect in oil Choke control to reduce the Sludge effect in oil wells wells
Provide Control based on Gas Lift Pressure and Provide Control based on Gas Lift Pressure and flowflow
All Control are implemented through a device All Control are implemented through a device which Communicates through radiowhich Communicates through radio
Automation system to provide Low B/W data Automation system to provide Low B/W data CommunicationsCommunications
Automation system to support RTU data Storage Automation system to support RTU data Storage and Upload in case of loss of communicationsand Upload in case of loss of communications
Automation system to have option for Automation system to have option for configuring polling frequency as per the needs.configuring polling frequency as per the needs.
In case of rod pump well - pump off controlsIn case of rod pump well - pump off controls
In case of ESP based well ESP pump Speed / In case of ESP based well ESP pump Speed / flow Control and On off Control.flow Control and On off Control.
Smart Oilfields and Platforms - AutomationSmart Oilfields and Platforms - Automation
Automation at Facilities Automation at Facilities Valves control for Well testValves control for Well test
Control of Test, Group Separator Level and Pressure for Control of Test, Group Separator Level and Pressure for Process StabilisationsProcess Stabilisations
AGA 3, 7 with AGA8 for Gas MeasurementAGA 3, 7 with AGA8 for Gas Measurement
API based VCF for liquid measurement API based VCF for liquid measurement
Artificial Lift system control for the Gas lift, Rod pump Artificial Lift system control for the Gas lift, Rod pump well, ESP Wellswell, ESP Wells
Automation system to support data Storage at each of Automation system to support data Storage at each of hierarchical locations in case of loss of communication hierarchical locations in case of loss of communication and Upload once communications is establishedand Upload once communications is established
Automation system to have option for configuring Automation system to have option for configuring polling frequency as per the needs.polling frequency as per the needs.
Integration of existing DCS,SCADA,PLC system to enable Integration of existing DCS,SCADA,PLC system to enable single platform for the operation, Data Storage and single platform for the operation, Data Storage and Analysis. Lower cost of supportAnalysis. Lower cost of support
Automation system to be hierarchical by architecture so Automation system to be hierarchical by architecture so that the data from different oil fields can be that the data from different oil fields can be consolidated.consolidated.
Remote ESD and start of facilitiesRemote ESD and start of facilities
Smart Oilfields and Platforms - AutomationSmart Oilfields and Platforms - Automation
Smart Oilfields and Platforms - CommunicationSmart Oilfields and Platforms - Communication
Communication at Well head and Communication at Well head and Facilities Facilities
Serial communications handled through Serial communications handled through terminal servers (IP radios are more terminal servers (IP radios are more compatible)compatible)
The WAN Communications should have The WAN Communications should have sufficient bandwidth at different levelsufficient bandwidth at different level
Communication can be Communication can be
Radio at on shore well headsRadio at on shore well heads
Radio, V- sat or LEO at offshore Radio, V- sat or LEO at offshore wellhead platformwellhead platform
Fibre optic, satellite at facility levelFibre optic, satellite at facility level
Leased line, OFC at regional Control Leased line, OFC at regional Control facility and Corporate Facilityfacility and Corporate Facility
In case of Remote Control Requirement In case of Remote Control Requirement alternate communication channel / Routes alternate communication channel / Routes should be available to the final control should be available to the final control elements – SSV, SSSV controlelements – SSV, SSSV control
Network Management system is a must for a Network Management system is a must for a large facilitieslarge facilities
Different Subnet, Domains can be created as Different Subnet, Domains can be created as required. A plan must be developedrequired. A plan must be developed
TC
P/IP
LA
N o
r W
AN
Notes:
Field Instruments
SCADAvantage ClientSCADAvantage ClientSCADAvantage Client
RedundantSCADAvantage Field Server
SCADAvantage Field Server
TCP/ iP LAN/WAN
TCP/ iP LAN/WAN
Flow Computer
RTU
(Network)
Satellite
CDPD or iP
RS232, RS485, DH1, Fiber
Licensed & Spread Spectrum Radio
Dial-up or Leased Line
Modem
** Note Redundant Communications Paths
SCADAvantage Center (Collecting Data from Sub-Servers)
Remote Polling Node
Field Protocols
PLC
Router
Corporate LAN/WAN
Warm BackupSCADAvantage
Field Server
Satellite
Terminal server
Local Server/Client
PLC
PLCPLC
PLC
RTUValve
stations
Pump Stations
Compressor Stations
F
Meter Station
Applications at Well head Applications at Well head These application runs in automation system at These application runs in automation system at
central facility and need real time data central facility and need real time data
In case of oil well (FTHP, ABP,Flow Arm Temp, In case of oil well (FTHP, ABP,Flow Arm Temp, Annulus and Down whole Pressures are Annulus and Down whole Pressures are recommended) recommended)
Well 3 Phase flow estimation via Virtual Well 3 Phase flow estimation via Virtual Flow metering. This flow measurement Flow metering. This flow measurement reduces the need to regular well testsreduces the need to regular well tests
Active well control application reduces the Active well control application reduces the slugs by controlling the chokeslugs by controlling the choke
Gas lift pressure control ensures efficient Gas lift pressure control ensures efficient use of Gas Liftuse of Gas Lift
DP between Well head and Facility is direct DP between Well head and Facility is direct indication of Leakagesindication of Leakages
Smart Oilfields and Platforms - ApplicationsSmart Oilfields and Platforms - Applications
Applications at Well head Applications at Well head In case of Gas wells In case of Gas wells
Flow measurement with AGA3 and AGA 8Flow measurement with AGA3 and AGA 8
Valve switching to manage water build-up Valve switching to manage water build-up
Plunger Lift Control (Turner Curve, Blow Plunger Lift Control (Turner Curve, Blow V/L etc.) for low pressure wellsV/L etc.) for low pressure wells
ESP and PCP Control for ESP and PCP Control for water take offwater take off
Compressor Monitoring (OEM curve to Real Compressor Monitoring (OEM curve to Real time curve comparison)time curve comparison)
Nominations Control to ensure the Nominations Control to ensure the consistent productionsconsistent productions
In case of CBM WellsIn case of CBM Wells Flow Measurement with AGA3 and AGA 8Flow Measurement with AGA3 and AGA 8
Nominations Control to ensure the Nominations Control to ensure the consistent productionsconsistent productions
Water level Measurement and Pump Water level Measurement and Pump ControlControl
Smart Oilfields and Platforms - ApplicationsSmart Oilfields and Platforms - Applications
Application at Facilities Application at Facilities Different applications are envisaged at the facilities which need Different applications are envisaged at the facilities which need
real time data form the automation system. These applications real time data form the automation system. These applications are are
Automated well testAutomated well test
Gas lift OptimisationGas lift Optimisation
Field / Pipeline Mass balanceField / Pipeline Mass balance
Well Monitoring SystemWell Monitoring System
Tank Gauging SystemTank Gauging System
Leak Detection and Leak Location for pipelinesLeak Detection and Leak Location for pipelines
Asset Management systemsAsset Management systems
Alarm ManagementAlarm Management
Abnormal Condition MonitoringAbnormal Condition Monitoring
Smart Oilfields and Platforms - ApplicationsSmart Oilfields and Platforms - Applications
Well test application (Onshore/ Well test application (Onshore/ Offshore) Offshore)
Automatic well test application selects the Automatic well test application selects the well for testing by operating the heather well for testing by operating the heather valvesvalves
Multiple well of the facilities can be Multiple well of the facilities can be scheduled for well test in sequence as scheduled for well test in sequence as desired by the operator. desired by the operator.
Each well test provides Oil, Gas and Water Each well test provides Oil, Gas and Water flow over a 24 hrs of testing along with flow over a 24 hrs of testing along with well pressure and gas oil ratiowell pressure and gas oil ratio
Well test has accept/reject option for the Well test has accept/reject option for the well test data based of operators well test data based of operators judgementjudgement
Application maintains history of each well Application maintains history of each well test data which can be used for analysing test data which can be used for analysing the well history as well as providing it to the well history as well as providing it to other applications other applications
The well test data is used by other The well test data is used by other application such as application such as
Production AllocationProduction Allocation
Gas Lift OptimisationGas Lift Optimisation
Well Monitoring SystemWell Monitoring System
ESP OptimisationESP Optimisation
Smart Oilfields and Platforms - ApplicationsSmart Oilfields and Platforms - Applications
Gas Lift Optimisations Gas Lift Optimisations (Onshore/ Offshore) (Onshore/ Offshore)
To optimise the gas used for gas lift To optimise the gas used for gas lift based on best possible oil based on best possible oil production from wellproduction from well
This is a model based optimisation This is a model based optimisation package which need input from well package which need input from well test to know the oil and gas flow of a test to know the oil and gas flow of a particular wellparticular well
Lift Curves are generated by the Lift Curves are generated by the model or can also be manually fed to model or can also be manually fed to the systemthe system
GLO provide an output which is a GLO provide an output which is a reference to the flow / pressure reference to the flow / pressure control loop of lift gas circuitcontrol loop of lift gas circuit
The automation system uses these The automation system uses these reference to control the flow of lift reference to control the flow of lift gas in the well annulusgas in the well annulus
The GLO helps in managing the Lift The GLO helps in managing the Lift gas network created for different oil gas network created for different oil wells in same or adjacent oil fieldwells in same or adjacent oil field
Smart Oilfields and Platforms - ApplicationsSmart Oilfields and Platforms - Applications
Asset /Field and Pipeline Mass Asset /Field and Pipeline Mass Balance (Onshore/ Offshore) Balance (Onshore/ Offshore)
Asset/Field Mass balances are Asset/Field Mass balances are applied to the facilities. Imbalance is applied to the facilities. Imbalance is indicator of leakagesindicator of leakages
This is based on Current day, This is based on Current day, Current Hour and Previous Day, Current Hour and Previous Day, Previous our flow estimationsPrevious our flow estimations
Pipeline mass balances is to identify Pipeline mass balances is to identify imbalance for facilities linked imbalance for facilities linked through pipelinesthrough pipelines
Imbalance is indicator of theft or Imbalance is indicator of theft or leakageleakage
In case of Gas Pipeline Line pack In case of Gas Pipeline Line pack calculation based on pipeline calculation based on pipeline segment and is must as change in segment and is must as change in line pack can provide imbalancesline pack can provide imbalances
In case of liquid pipelines if the In case of liquid pipelines if the temperature variation across the temperature variation across the pipeline is considerable then only pipeline is considerable then only change in line pack has impact on change in line pack has impact on imbalance imbalance
Smart Oilfields and Platforms - ApplicationsSmart Oilfields and Platforms - Applications
Well Monitoring System Well Monitoring System (Onshore/ Offshore) (Onshore/ Offshore)
These are Model based application which These are Model based application which calculates Oil, Gas and Water flow from calculates Oil, Gas and Water flow from each well. These are called as Virtual flow each well. These are called as Virtual flow meteringmetering
They reduces the need to regular well testThey reduces the need to regular well test
WMS system uses well head based WMS system uses well head based measurement. The change in the measurement. The change in the differential of pressure, Temperatures is differential of pressure, Temperatures is provided to well model which then provided to well model which then provides Oil, Gas and water measurementsprovides Oil, Gas and water measurements
These methods are cost effective and These methods are cost effective and considerably accurate. Being model based considerably accurate. Being model based also easy to calibrate based of latest well also easy to calibrate based of latest well testtest
These real time flow provides inputs for These real time flow provides inputs for the Active well control, Reservoir the Active well control, Reservoir modelling etcmodelling etc
Smart Oilfields and Platforms - ApplicationsSmart Oilfields and Platforms - Applications
Sensor Readings
Flow
Rates
Models & Solver
Smart Oilfields and Platforms - ApplicationsSmart Oilfields and Platforms - Applications
Tank Gauging System (Onshore/ Tank Gauging System (Onshore/ Offshore) Offshore)
Storage Tank level measurement Storage Tank level measurement based on radar gaugesbased on radar gauges
The Tank gauging should be integral The Tank gauging should be integral to the Automation systemto the Automation system
Tank Gauging system to have Tank Gauging system to have Strapping Table Calculation toolStrapping Table Calculation tool
Tank Gauging system to provide Tank Gauging system to provide Gross and Net Volumes based on the Gross and Net Volumes based on the API Table 11.1.24.7.1.1 and API API Table 11.1.24.7.1.1 and API 11.1.54.7.1.1 for oil and oil products.11.1.54.7.1.1 for oil and oil products.
VCF from these tables relates the VCF from these tables relates the volumes at specified temperatures volumes at specified temperatures to the volume at standard to the volume at standard temperaturestemperatures
Facility wise inventory calculation Facility wise inventory calculation and reportingand reporting
Smart Oilfields and Platforms - ApplicationsSmart Oilfields and Platforms - Applications
Leak Detection and Leak Location Leak Detection and Leak Location system (Onshore / Offshore)system (Onshore / Offshore)
Pressure Measurement are Pressure Measurement are required across the pipeline at a required across the pipeline at a specified distances to ensure specified distances to ensure the level of accuracythe level of accuracy
Leak Detection Can be Leak Detection Can be implemented viaimplemented via
Pressure Surge Pressure Surge Pressure Wave FlowPressure Wave Flow Mass/Volume BalanceMass/Volume Balance
Leak Detection System Performance Parameters
Detection of the Leak
S.No. Leak Size
% of Flow
Time to Detect Leak (Anywhere in Pipeline)
1Full Bore
Rupture 100 1 min
2 Large Leak 50 2 min
3 Medium Leak 25 4 min
4
Small to Medium Leak 10 10 min
5 Small Leak 5 20 min
6Very Small
Leak 2 100 min
Estimation of the Leak Location
S.No. Leak Size % of FlowEstimation of Leak
Locations
1
Very Small Leak 2 60 KM
2
Small to Medium Leak 2 to 50 30 KM
3 Large Leak > 50 20 KM
Asset Management System Asset Management System Use of FF, Hart and Profibus based Use of FF, Hart and Profibus based
instrumentation and automation instrumentation and automation system provide Diagnostic system provide Diagnostic Information along with the Real time Information along with the Real time information'sinformation's
These diagnostic information is used These diagnostic information is used to predict the possibilities of failure to predict the possibilities of failure of the critical control equipmentsof the critical control equipments
The AMS system provides the mean The AMS system provides the mean to identify the such possibilities of to identify the such possibilities of failure and use them to carry out the failure and use them to carry out the maintenance activity in advance. maintenance activity in advance.
The diagnostic information's triggers The diagnostic information's triggers the CMMS system and CMMS provide the CMMS system and CMMS provide Work order for the necessary actionsWork order for the necessary actions
The Asset management module can The Asset management module can also be used for rotating equipment also be used for rotating equipment and also some process equipment and also some process equipment monitoring through customisationsmonitoring through customisations
Planned and on time maintenances Planned and on time maintenances reduces the downtime and support reduces the downtime and support the production planningthe production planning
Smart Oilfields and Platforms - ApplicationsSmart Oilfields and Platforms - Applications
CEAG I/O
P5001 0 ... 150 bar
Integration with ERP System (SAP) Integration with ERP System (SAP)
Majority of the customers used the Majority of the customers used the SAP as ERP system in Oil and Gas SAP as ERP system in Oil and Gas IndustriesIndustries
The Automation system integration The Automation system integration with the SAP is must to ensure the with the SAP is must to ensure the error free production, Sale numbers error free production, Sale numbers reporting on day to day basisreporting on day to day basis
Automation system can feed the Automation system can feed the data to different modules of SAPdata to different modules of SAP
Production Numbers in PPPI Production Numbers in PPPI modulesmodules
Custody Transfer Numbers to SD Custody Transfer Numbers to SD ModulesModules
Diagnostic and Maintenance Diagnostic and Maintenance Data to PM modulesData to PM modules
Integration with Scientific SystemsIntegration with Scientific Systems
Reservoir modelling and analysis Reservoir modelling and analysis systemssystems
Drilling system for LWD/MWDDrilling system for LWD/MWD
Smart Oilfields and Platforms – IntegrationSmart Oilfields and Platforms – Integration
Integration system provides the data validation to Integration system provides the data validation to ensure correct numbers are sent to integrated systemsensure correct numbers are sent to integrated systems
Present Oil Field and Platform Operation Practices
Concept of Smart Oilfield and PlatformsConcept of Smart Oilfield and Platforms
Smart Oilfield and Platforms – Detailed ViewSmart Oilfield and Platforms – Detailed View InstrumentationInstrumentation
AutomationAutomation
CommunicationCommunication
ApplicationsApplications
Business & Scientific System IntegrationBusiness & Scientific System Integration
Case Study – ONGC Enterprise wide SCADACase Study – ONGC Enterprise wide SCADA
Agenda of PresentationsAgenda of Presentations
Enterprise Wide SCADA for all Production and Drilling Enterprise Wide SCADA for all Production and Drilling Facility of ONGC Spread across India and in Arabian Facility of ONGC Spread across India and in Arabian Sea.Sea.
The project is envisaged by core design and The project is envisaged by core design and engineering team of ONGC under the initiative of engineering team of ONGC under the initiative of Chairman of ONGC LimitedChairman of ONGC Limited
Main reason for ONGC to think about such LARGE Main reason for ONGC to think about such LARGE architecturearchitecture Efficient Real time Monitoring of the Production and Efficient Real time Monitoring of the Production and
Drilling Parameters across all the assets in IndiaDrilling Parameters across all the assets in India
Remote control of the production well in case of Offshore Remote control of the production well in case of Offshore platformplatform
Facilitate offline analysis of the Valuable/ High Producing Facilitate offline analysis of the Valuable/ High Producing Wells through third party E&P Applications.Wells through third party E&P Applications.
Provide summarised information to the management for Provide summarised information to the management for effective decision making effective decision making
Total Facelift in the day to day operation of ONGC Total Facelift in the day to day operation of ONGC Production and Drilling facility to improve the efficiencyProduction and Drilling facility to improve the efficiency
The Project EnvisagedThe Project Envisaged
Scope of SupplyScope of Supply Supply of Three Tier SCADA Architecture as Production SCADA Supply of Three Tier SCADA Architecture as Production SCADA
and Drilling SCADA spread across 19 Assets in India. The and Drilling SCADA spread across 19 Assets in India. The Production SCADA is ABB SCADAvantage and Drilling SCADA is Production SCADA is ABB SCADAvantage and Drilling SCADA is NOV solutionNOV solution
RTU with FF based Instrument for the Production installation RTU with FF based Instrument for the Production installation to enable data acquisition and asset management.to enable data acquisition and asset management.
Supply of 16 Data Centres including the corporate data centre Supply of 16 Data Centres including the corporate data centre across India to enable efficient operation of respective Assets.across India to enable efficient operation of respective Assets.
UPS for all the 250 plus tier 1 control room of production and UPS for all the 250 plus tier 1 control room of production and drilling SCADA along with FCBC for 85 no of remote RTU with drilling SCADA along with FCBC for 85 no of remote RTU with solar chargers.solar chargers.
SAP, Epinet, VRC- Integrations of Real-time and History Data.SAP, Epinet, VRC- Integrations of Real-time and History Data.
Disaster Recovery Solution for the corporate data centre.Disaster Recovery Solution for the corporate data centre.
Scope of WorkScope of Work Erections and Commissioning of above scope and warranty for Erections and Commissioning of above scope and warranty for
one yearone year
AMC of 6 years after warrantyAMC of 6 years after warranty
The Scope of Supply and WorkThe Scope of Supply and Work
Single Largest Instrumentation- Automation – IT Single Largest Instrumentation- Automation – IT Solution project finalised in India – 95 musdSolution project finalised in India – 95 musd
Largest three tier network of near real time Largest three tier network of near real time process data monitoring. The no of HMI Station in process data monitoring. The no of HMI Station in a single largest Network - 1300 Plus HMI Stations a single largest Network - 1300 Plus HMI Stations and 600 Plus Serversand 600 Plus Servers
Largest Project in term of the FF based Largest Project in term of the FF based Instrumentations and automation solution – 7500 Instrumentations and automation solution – 7500 FF instrument and 850 FFH1 segmentsFF instrument and 850 FFH1 segments
First Ever project with FF and Hart based RTU and First Ever project with FF and Hart based RTU and Asset Management.Asset Management.
Largest project in terms of Field Instrumentation Largest project in terms of Field Instrumentation scope of supply scope of supply
Largest Oil and Gas producing wells connected to Largest Oil and Gas producing wells connected to the SCADA system – 18000 Wellsthe SCADA system – 18000 Wells
Single largest contract to build 179 Control rooms, Single largest contract to build 179 Control rooms, 16 Data centres and 75 Mobile Control rooms16 Data centres and 75 Mobile Control rooms
Unique Features of the SCADA Unique Features of the SCADA ProjectProject
ONGC SCADAvantage System Architecture
Internet
Casual Web User
13 x Tier 2 Asset data Center
Redundant LAN
Workstation1multi-purpose
Web
Application
TrainingSimulatorWorkstation n
multi-purpose
...
...
Remote LowPower RTUspolled via two
Tier 1 sites
12 High Prod. Wells4 CBM Wells
Redundant LAN
172 x Tier 1 Onshore (Typical)
SCADA Vision
Terminal Server
Workstation1Multi-purpose
Event
Workstation nMulti-purpose
Laser
... SpreadSpectrum Radio
RTU
Existing Equipment
DCS Links via OPC
Redundant LAN
Workstation1Multi-purpose
Event
8 x Tier 1 Offshore (Typical)
SCADA Vision
...
Web Applications
Workstation nMulti-purpose
TDMA RadioRTU
Laser
SCADA Vision
Network MgtEventLaser
Tier 3 Corporate (Delhi)
Fiber Optic Link
Multi-Well Platforms
RTU
Multi-Well Platforms
RTU
TrainingWorkstations
Linkactive ifDRC incontrol
Applications
...
CommonDB Svr
From DrillingSCADA
to EnterpriseApplications
LAN
SCADA Vision
CommonDB Svr
Network MgtWeb
2x HMI, 1xHelp DeskWorksations
Corporate DataUsers
From DrillingSCADA
to EnterpriseApplications
Tier 3 Disaster Recovery Centre (Mumbai)
LAN
SCADA Vision
Network MgtWeb
2x HMI, 1xHelp DeskWorksations
Corporate DataUsers
From DrillingSCADA
CommonDB Svr
to EnterpriseApplications
ApplicaitonsApplicaitons
13 x Tier 2 Locations13 x Tier 2 Locations
163 x Tier 1 Onshore SCADA 163 x Tier 1 Onshore SCADA LocationsLocations
8 x Tier 1 Offshore SCADA 8 x Tier 1 Offshore SCADA LocationsLocations
278 x RTU Locations278 x RTU Locations
Tier 3 in Delhi with backup Tier 3 in Delhi with backup in Mumbaiin Mumbai