© ABB Group July 14, 2015 | Slide 1 Integrating offshore wind energy An engineering challenge...

23
© ABB Group March 21, 2022 | Slide 1 Integrating offshore wind energy An engineering challenge Sebastian Stadler, Tobias Korn | ABB AG | Grid Systems | December 2011
  • date post

    22-Dec-2015
  • Category

    Documents

  • view

    214
  • download

    0

Transcript of © ABB Group July 14, 2015 | Slide 1 Integrating offshore wind energy An engineering challenge...

© ABB Group April 19, 2023 | Slide 1

Integrating offshore wind energyAn engineering challenge

Sebastian Stadler, Tobias Korn | ABB AG | Grid Systems | December 2011

© ABB AG April 19, 2023 | Slide 2

ChallengesLoad flow scenario Germany 2020

Source: Amprion

Situation 2010 Scenario 2020

© ABB AG April 19, 2023 | Slide 3

ChallengesOffshore installations Europe

Source: KPMG 2010

© ABB AG April 19, 2023 | Slide 4

ProjectsOffshore clusters North Sea

BorWin

SylWin

HelWin

DolWin

Project Finish Company

BorWin1 2010 ABB400 MW

BorWin2 2012 Siemens800 MW

DolWin1 2013 ABB800 MW

DolWin2 2015 ABB900 MW

HelWin1 2013 Siemens576 MW

HelWin2 2015 Siemens690 MW

SylWin1 2014 Siemens864 MW

Status: 2011

© ABB AG April 19, 2023 | Slide 5

Wish and realityOffshore wind farm projects North Sea

Source:wind:research 2011

40% gap

© ABB AG April 19, 2023 | Slide 6

Transmission technologyAC vs. DC

© ABB AG April 19, 2023 | Slide 7

HVDC projects and technologyHVDC vs. HVAC

But cost is not everything:

AC cable > 50 km needs reactive power compensation, which is technically absurd as far as offshore is concerned

Environmental impact: DC cable has no electrical field and has lower losses, which leads to a lower thermal impact

HVDC projects and technologyConnecting SylWin wind farms with AC cables

© ABB AG April 19, 2023 | Slide 8

Platform AC Cable

HVDC projects and technology Connecting SylWin wind farms with DC cables

© ABB AG April 19, 2023 | Slide 9

PlatformDC CableAC Cable

© ABB AG April 19, 2023 | Slide 10

HVDC projects and technologyHVDC Classic vs. Light

HVDC Classic overhead lines

HVDC LightVPE cable

HVDC Classic/ HVDC Light MI cable

HVDC Light overhead lines

Udc in kV

Power in MW

800

700

600

500

400

300

200

0

0 1000 2000 3000 4000 5000 6000 7000

© ABB AG April 19, 2023 | Slide 11

HVDC projects and technologyHVDC light project DolWin1 by ABB

© ABB Group April 19, 2023 | Slide 12

HVDC projects and technologyDC connections europe 2010

Offshore Wind

HVDC connections

© ABB AG April 19, 2023 | Slide 13

HVDC projects and technologyRealized projects 56 HVDC Classic projects since 1954

14 HVDC Classic upgrades since 199114 HVDC Light projekte since 1997

TrollNelson River 2

CU-project

Vancouver IslandPole 1

Pacific Intertie

Pacific IntertieUpgrading

Pacific IntertieExpansion

Intermountain

Blackwater

Rio Madeira

Inga-Shaba

Brazil-ArgentinaInterconnection I&II

EnglishChannelDürnrohrSardinia-Italy

Highgate

Châteauguay

Quebec-New England

Skagerrak 1-3

Konti-Skan Baltic Cable

FennoSkan 1&2

Kontek

SwePol

ChaPad

Rihand-Delhi

Vindhyachal

Sakuma

Gezhouba-Shanghai

Three Gorges-Shanghai

Leyte-Luzon

Broken Hill

New Zealand 1&2

Gotland Light

Gotland 1-3

Murraylink

Eagle Pass

Tjæreborg

HällsjönHagfors

Directlink

Cross Sound

Italy-GreeceRapid City

Vizag II

Three Gorges-Guandong

Estlink

Valhall

Cahora Bassa

SapeiSquare Butte

Sharyland

Three Gorges-Changzhou

Outaouais

Caprivi Link

Hülünbeir- Liaoning

Lingbao II Extension

Xiangjiaba-Shanghai

BorWin1

NorNed

Apollo Upgrade

EWIP

IPP Upgrade

Itaipu

© ABB Group April 19, 2023 | Slide 14

HVDC projects and technologyDC connections europe 2020

Offshore Wind

HVDC connections

© ABB AG April 19, 2023 | Slide 15

HVDC projects in China 2020

Guangdong

Fujian

Taiwan

Sichuan & Chongqing

Hubei

Hunan

Jiangxi

Heilongjiang

Inner Mongolia

Hebei

Henan Jiangsu

Shandong

Anhui

Guangxi Guizhou

Beijing Tianjin

Shanghai

Jilin

Gansu

Shaanxi

Shanxi

Qinghai

Xinjiang

Xizang

Ningxia

Liaoning

Zhejiang

Yunnan

Hainan Nuozhadu-Guangdong

800kV, 5000-6000 MW, 2015Bangkok

NW-Sichuan (Baoji – Deyang)

3000 MW, 2011

BtB North - Central1000 MW, 2012

BtB Shandong - East 1200 MW, 2011

Irkutsk (Russia) - Beijing800kV, 6400 MW, 2015

BtB Northeast-North (Gaoling)

1500 MW, 2008

Goupitan - Guangdong3000 MW, 2016

Russia

Jinghong-Thailand3000MW, 2013

Ningxia - Tianjing 3000 MW, 2010

NWPG

NCPG

NEPG

CCPG ECPG

North Shaanxi-Shandong3000 MW, 2011

Yunnan - Guangdong

800kV, 5000 MW, 2009

SCPG

Hulunbeir (Inner Mongolia) - Shenyang

3000 MW, 2010Xianjiaba – Shanghai 800kV, 6400 MW, 2011

Xiluodu - Hanzhou

800kV, 6400 MW, 2015

Xiluodu - Hunan

800kV, 6400 MW, 2014

(The year means project in operation)

Hami – C. China800kV, 6400 MW, 2018

Humeng – Shandong

Humeng - Tianjing800kV, 6400 MW, 2016

Humeng - Liaoning

800kV, 6400 MW, 2018

Jinsha River II – East China

800kV, 6400 MW, 2016

Jinsha River II - Fujian

800kV, 6400 MW, 2018

Jinsha River II – East China

800kV, 6400 MW, 2019

Jingping – East China

800kV, 6400 MW, 2012

Lingbao BtB Expansion 750 MW, 2009

Gezhouba-Shanghai Expansion 3000 MW, 2011

BtB China-Russia (HeiHe)

800kV, 6400 MW, 2015

750 MW, 2008

FarEast (Russia) – NE China

3000 MW, 2010

© ABB Group April 19, 2023 | Slide 16

HVDC projects and technologyDC connections europe 2030+

Water200 GW

Solar700 GW

8000 km2

90 x 90 km

Offshore Wind300 GW

25 000 km2

5000 x 10 km

Offshore Wind

Water

Solar

HVDC connections

© ABB AG April 19, 2023 | Slide 17

Getting a feeling for dimensionsOffshore is a big business

© ABB AG April 19, 2023 | Slide 18

Getting a feeling for dimensionsWind energy converter

Height total: up to 190 mBlade length: up to 80 mWeight: up to 800 to

Height total: up to 190 mBlade length: up to 80 mWeight: up to 800 to

© ABB AG April 19, 2023 | Slide 19

Getting a feeling for dimensionsSea cable installation

95 km of a 155 kV 3-phase cable

70 kg / m 6650 to in total

maximum load: 7000 to

95 km of a 155 kV 3-phase cable

70 kg / m 6650 to in total

maximum load: 7000 to

© ABB AG April 19, 2023 | Slide 20

Getting a feeling for dimensionsDC platform BorWin1

Topside:Length: 50 mWidth: 33,5 mHeight: 22 mWeight: 3200 t

Topside:Length: 50 mWidth: 33,5 mHeight: 22 mWeight: 3200 t

Jacket:Height: 62 mWeight: 1800 t

Jacket:Height: 62 mWeight: 1800 t

© ABB AG April 19, 2023 | Slide 21

Getting a feeling for dimensionsThialf crane

Length: 200 mWidth: 88 mDraught: max. 31 mCapacity: 2 x 7100 to

Length: 200 mWidth: 88 mDraught: max. 31 mCapacity: 2 x 7100 to

© ABB AG April 19, 2023 | Slide 22

© ABB AG April 19, 2023 | Slide 23

Wind energy converterTypes of foundation used worldwide