Day 2 - pcp system operating principle and step by-step design procedure
Gap - oil production network modelling
esp system basic design and operational factors
Overview of artificial lift technology and introduction to esp system
How to improve the practices in defining OIl and Gas fields development
Day 3 - pcp system installation, monitoring, troubleshooting and diagnostic
Hydrocarbons metering, storage, and export systems
Integrated Oil Field Development Plan - FDP. Criteria, strategy and process for an proper arctic offshore