02- Architectural & Structural Drawing.
03- Units & Dimensions.
06- Reinforcement of Frames.
1235-INST-F-VD-115
1235-PROC-F-CL-84 ( Repairing Procedure for Piping)
G 11 L1 WS 003 (Ug Piping Coaying)
1235-INST-F-VD-117
E003_1+Basic+Ref.+equipment+Heat+exchanger
M006+&+E006+Part+5+Stack+and+Draught
M006&+E006+Part+6+Safe+Firing+during+startup
Spec for Thermal Insualtion E1000717_v1
chap4
Chapter3a
1235-DWG-F-VD-56
Attachment of CM-040 (Work Flow of Field Inspection Notice)
Attachment of CM-040 (Format of Field Inspection Notice (Summary))
C0 SC 001 Construction Schedule
C0 SC 001 Construction Schedule_1
C2-PN-001 Labor Manpower Plan_0
C4-PN-005 Temo Faci Plan_0