Menuju Peningkatan Sistem Manufaktur Yang Fleksibel
A Study on Total Quality Management and Lean Manufacturing: Through Lean Thinking Approach
ANALISA PENINGKATAN EFISIENSI ASSEMBLY LINE B PADA BAGIAN MAIN LINE DENGAN METODE RANKED POSITIONAL WEIGHTS DI PT. X
PROSPEK ENZIM DAN LIMBAH LIGNOSELULOSA UNTUK PRODUKSI BIOETANOL
Monte Carlo Simulation in Microsoft Excel
Assessment of the availability of an oshore installation by Monte Carlo simulation
Stochastic model building and simulation
Preventive maintenance model with FMEA and Monte Carlo simulation for the key equipment in semiconductor foundries
Optimization of Preventive Maintenance Scheduling in Processing Plants(Nguyen-Bagajewicz)-08