2_25 Comparision of Materials
Condenser Tube Cleaning Using Bullet Shot Method
High Thrust Bearing Temp. in TDBFP-APR10
HP Bypass Warm Up Lines Re Engineering to Prevent Condensate Accumulation,97-98
ATT Resetting Solenoid Problem , 210 MW, 97-98
Problem Faced in Turbine Governing System During Commissioning of TDBFP
CC Pump Cavity Temperature High
LPBP Control Valve 1-LPBP Govern Sys
Delay in Opening of LP Bypass Valve
Failure of 11 kV Motor Terminal at MDBFP
Self nomination MIE EXPERT
Presentation on child labour- Kamla Nehru Publci School, Phagwara
Child Labour Presentation-Kamla Nehru Public School, Phagwara
Presentation on the theme Child Labour-Kamla Nehru Public School, Phagwara
3_05 Eng.constants Conversions
3 17 Terminology&Definitions
Low Vacuum in Condenser
Low Vacuum
LP by Pass System - Unit 2, 500 Mw, Commissioning Problems, 02-03
Poor Vacuum During Initial Commissioning