ZNSHINE PV-Tech Co., Ltd.... 23 335 335 340 355 370 400 400 405 380 435 445 455 440 440 445 470 490...

Post on 04-Aug-2020

10 views 0 download

Transcript of ZNSHINE PV-Tech Co., Ltd.... 23 335 335 340 355 370 400 400 405 380 435 445 455 440 440 445 470 490...

1www.znshinesolar.com 1

ZNSHINE PV-Tech Co., Ltd.

Wednesday, May 13, 2020

www.znshinesolar.com

2www.znshinesolar.com 2

ontents

01

02

03

04

Who We Are

Why ZNSHINE

Our References

Branding and CSR

3www.znshinesolar.com 3

Who We Are

1

4www.znshinesolar.com 4

Who Are We?

Production

Capacity

5GWManufacturing

experience

30+ years

The biggest PV company

listed on NEEQ

NEEQ

Top PerformerChangzhou. China

Headquarters DNV GL

PV modules

manufacturers

Tier1

Bankable Solar Products

Reliable Bankability

5www.znshinesolar.com 5

1988

Founded

2007

Enter Solar

Business

2008

Globalization

2013

BNEF Tier 1

2014

EPC Qualification

in Japan

2016

Listed on NEEQ

2018

TOP1 Module

Supplier India

2019

5 GW

Capacity

Who We Are - Milestones

6www.znshinesolar.com 6

5 GW FULL AUTOMATED

MANUFACTURING

MODULES

ENERGY

STORAGE SYSTERM

SOLAR SOLUTIONS

1,1 GW PROJECT

CONSTRUCTION

EPC

Who We Are – Three Business Units

7www.znshinesolar.com 7

To make solar power become the most economical clean energy in the world.

Mission

Where there is SUNSHINE, there is ZNSHINE.

Vision

Fairness and Trust

Value

Who We Are - Mission & Vision

8www.znshinesolar.com 8

Why ZNSHINE

2

9www.znshinesolar.com 9

NO.10

5

10

15

20

25

30

35

类别 1 类别 2 类别 3 类别 4 类别 5 类别 6 类别 7 类别 8

32

1415

23

19

2122

19

1988 2006 2005 1997 2001 1999 1998 2001

years

Why ZNSHINE- 32-Year Manufacturing Experience

10www.znshinesolar.com 1 0

Why ZNSHINE- Top Module Supplier to India

Znshine solar8%

6%

5%

5%5%

5%

others40%

ZNSHINE SOLAR

Module Supplier

India’s NO.1

Source: Mercom India

Market share 2018

NO.1

11www.znshinesolar.com 1 1

Why ZNSHINE- NO.1 EPC Qualification In Japan

In 2011, ZNSHINE entered Japan's

market. ZNSHINE Solar has over

1.3GW of projects in pipeline in

Japan and 1.3GW in China In 2016.It

has earned the trust of local and

national governments as a certified

and acknowledged EPC in both

countries.

NO.1

12www.znshinesolar.com 1 2

Why ZNSHINE- Year-Over-Year Growth

196 239 218

516

753

888

1,200

2,305

-20.00

0.00

20.00

40.00

60.00

80.00

100.00

120.00

140.00

160.00

0.00

500.00

1000.00

1500.00

2000.00

2500.00

2012 2013 2014 2015 2016 2017 2018 2019

Annual Shipment(MW)

Annual shipment(MW) y-o-y growth rate

13www.znshinesolar.com 1 3

Why ZNSHINE– Featured Solar Modules

Graphene-

Coating

Double-

Glass

Mono

Poly Half-cut

Bifacial

MBB Large Cells

Mono

Poly

MBB 166/210

14www.znshinesolar.com 1 4

Why ZNSHINE– Graphene Coating

More Power Than Standard

Longer Product Life

Self-cleaning

Better Low-light Performance

15www.znshinesolar.com 1 5

PV Magazine Module Benchmark test,

ZNSHINE Solar’s Gra-Poly modules

demonstrated impressive energy yield with

1.1% boost.

Why ZNSHINE- Outdoor Real Test Conditions

* Graphene-coating module

*

*

16www.znshinesolar.com 1 6

Why ZNSHINE- Double Glass Framed Modules

High Reliability

30 Years Performance Warranty

Low Micro-crack Risk

Frame Design,Easy Transportation

and Installation

Glass

Eva

Cells

Eva

Glass

17www.znshinesolar.com 1 7

Why ZNSHINE- Global Leader in Double-glass

More than 230MW

Double-glass solar modules shipped

MW

Fully automated, 500MW fully

autonomous production line

Shipped to MENA/South America

18www.znshinesolar.com 1 8

Why ZNSHINE- Tier 1 Ranking

20182017

ZNSHINE SOLAR TOP10

ZNSHINE SOLAR TOP15

19www.znshinesolar.com 1 9

Why ZNSHINE-Financial Strength

D&B rating indicates the

great Financial Strength and

Credit Ranking of ZNSHINE

business as a whole.

20www.znshinesolar.com 2 0

Why ZNSHINE-Top Bankable Panel

TOP

PERFORMERIFC Approval

listed Solar Company

China RE

& Munich RE

Warranty

PV Module Bank

Grade Audit

Audited by third parties

Factory Audits and

Production Supervision

21www.znshinesolar.com 2 1

Why ZNSHINE-Project Financing Bank overview

22www.znshinesolar.com 2 2

Exclusive Graphene-coating Patent Worldwide

>100 Technology Patents

Certified Laboratory by CNAS

>100 Global Engineers

1st self-cleaning modules in market

Why ZNSHINE- Excellence in R&D

23www.znshinesolar.com 2 3

335 335340

355

370380400 400

405

435

445455

440 440445

470

490500

275

325

375

425

475

525

2019Q4 2020H1 2020H2 2021 2022 2023

120Mono 144Mono Big size

• Half-cut process

• 158.75mm mono cell

• MBB cell

• Half-cut process

• 166mm mono cell

2019-2023 Mainstream High-Power Module

24www.znshinesolar.com 2 4

Why ZNSHINE- State-Of-The-Art Manufacturing

Fully Automated Production Lines

Coordinated Quality Control System

MES

Mass Production Yield > 99.8%30 Years of Experience

Empowers our Quality Management

25www.znshinesolar.com 2 5

Why ZNSHINE-World Class Certifications

Reliable And High Efficiency Modules Guarantee Your Profits

26www.znshinesolar.com 2 6

12

24

12 12-hour Quotation

12-hour Contract Process

After-sale Service

24 24-hour Response

Why ZNSHINE- Fast-Responding Service

30 Local Subsidiaries/offices

27www.znshinesolar.com 2 7

Our References

3

28www.znshinesolar.com 2 8

References - ZNSHINE India

Project1

Installed capacity: 300 MW

COD: September 17th, 2018

Project 2

Installed capacity: 300 MW

COD: September 17th, 2018

Source: PV lnfoLink

29www.znshinesolar.com 2 9

DEWA(Dubai Electricity and Water Authority)

References - ZNSHINE MENA

ZNSHINE Panels will be installed in 15,000 Villas

Rooftops in Dubai

30www.znshinesolar.com 3 0

One Stop Warehouse Achieve Energy Solutions

• Top solar distributor in Australia

References - ZNSHINE Australia

• Australia’s largest Solar Distributor

31www.znshinesolar.com 3 131

Okayama Miyakojima

Fukuoka kagoshima

Hamada Project phase II

Installed capacity: 23MW

COD: April 26th, 2017

Hamada Project phase I

Installed capacity: 11MW

COD: October 20th, 2015

References - ZNSHINE Japan

32www.znshinesolar.com 3 2

References - ZNSHINE Latin America

SIGNING Of 300MW Solar Project

Nov.8th ,2017,ZNSHINE as the

only solar company signed the MOU

of 300MW solar project with the

president of Mato Grosso Brazil.

PFV Solared de la Punta,

San Luis, Argentina

33www.znshinesolar.com 3 3

Sandelin HamRudbaxton Solar Park, UK,

Europe

St. Columb Solar Park, UK,

Europe

• Commissioned March 2014

• Installed capacity: 7 MW

• Investor: Low Carbon

(Macquarie)

• Module type: ZXP6-60

polycrystalline

Polos, England Solar Park

• Installation Capacity:

8MW

• March 2014, grid-

connected

• Capacity: 10.8 MW

• Investor: Low Carbon

• Module type: ZXP6-60

polycrystalline

• ZNSHINE provieds12kw

Pv modules to the British

Royal family at Sanderlin

Manor,UK

• Rooftop 12KW

Brück, Germany, Europe

• Commissioned July 2014

• Installed capacity: 4,2 MW

• Investor: Naturstrom (GLS

bank)

• Module type: ZXP6-60

polycrystalline

References- ZNSHINE Europe

34www.znshinesolar.com 3 4

Text here

DENMARK

108mw

UKRAINE

53MW

References- Fast Growth In New Market

35www.znshinesolar.com 3 5

Shanxi Province, Yulin ,PRC

Capacity:300MW May 2018

Inner Mongolia ,Wulatezhongqi ,PRC

Capacity:50MW May 2017

Jiangsu Province, Dongtai, PRC

Capacity: 5.9 MW Dec 2014

References - ZNSHINE China

36www.znshinesolar.com 3 6

References - Partners & Clients

CHINA

CHINA

EUROPE

EUROPE

MENA

NA

NA

INDIA

INDIA

37www.znshinesolar.com 3 7

Branding and CSR

38www.znshinesolar.com 3 8

Branding and CSR

39www.znshinesolar.com 3 9

Zhèng Xìn

FairnessDo the right thing

TrustReliability

= Z(E)NSHINE

40www.znshinesolar.com 4 0

ZNSHINE PV-Tech Co., Ltd.

Wednesday, May 13, 2020

www.znshinesolar.com