IABSE 2006 May 16

By Peter G. Buckland, C.Eng.

Increasing the Load Capacityof Major Bridges

As time passes ….bridges deterioratetraffic loads increase (heavier

vehicles)traffic volume increases (more

lanes)more lanes = more eccentricity

Strengthening can be very expensive

What can we do?

And how can we do it?

keep peak traffic runningshort periods of occupancytwo deadlines per dayno time to correct problemsdesign must be tolerant of misfitalso improve seismic, wind,

maintenance

Examples

leading to

Suggested Guidelines

1/28

2

North ViaductNorth Viaduct

6 hours per night

88391220 1220

2/28

3

2000 200010668

3/28

4

4/28

5

Increase capacity from HS 20 loading to CS-600

Widen from 7.3m to 10.0mNew deck made composite

Rock Creek Canyon Bridge

Typical Deck Section

old new

5/28

6

Hagwilget Bridge, Canada

6/28

7

Replace deck system

Change load from 1 x 13.5t to 2 x 55t

10 hours per night, plus always access to hospital

7/28

8

8/28

9

9/28

10

10/28

11

Belgo Bridge, Canada Tower overstressed,

D/C = 2.75

11/28

12

Increase capacity by changing from a suspension bridge

into cable-stayed

6 weeks each summer,

keep conveyor running

12/28

13

Seaway International Bridge, Canada - USA Stiffening truss overloaded by modern trafficReplace chords with high strength steel

13/28

14

14/28

15

15/28

16

Port Mann Bridge, CanadaFour lanes five,

modern traffic loads

16/28

17

Originally, load factor = 1.75R≥1.75(D+L)

Now 0.9R≥1.1Df+1.5Dw+1.7L

For an existing bridge0.9R≥1.1Df+1.2Dw+1.65L

Lions’GateBridge,Canada

17/28

18

ObjectivesObjectivesReplace corroded deck Widen traffic lanes Widen sidewalksProvide barriers Provide pavingProvide drainsReduce maintenanceIncrease load capacity Improve aerodynamic stability

ConstraintsConstraintsMaintain same weightCarry traffic during constructionReplace each section in 10 hours 20:00 to 06:00Very limited access

Solution:Solution:

Replacement of Entire Suspended Structure

12 200

3 SP'S @ 2900 = 8700 13001300

18/28

19

2000

2700

12 192

16 762

2000

27003 LANES @ 3556 = 10 668

ORNAMENTALLIGHTS

HANDSTRANDS

19/28

20

20/28

21

Guidelines

GuidelinesDetermine current stress state

GuidelinesDetermine current stress state

(survey and analyze)

21/28

22

GuidelinesDetermine current stress stateDetermine loads accurately

GuidelinesDetermine current stress stateDetermine loads accuratelyEstablish load & resistance factors

GuidelinesDetermine current stress stateDetermine loads accuratelyEstablish load & resistance factorsMinimize weight

GuidelinesDetermine current stress stateDetermine loads accuratelyEstablish load & resistance factorsMinimize weightImprove load paths

22/28

23

GuidelinesDetermine current stress stateDetermine loads accuratelyEstablish load & resistance factorsMinimize weightImprove load pathsShort occupancy → constructibility

GuidelinesDetermine current stress stateDetermine loads accuratelyEstablish load & resistance factorsMinimize weightImprove load pathsShort occupancy → constructibilitySolve gravity loads first

GuidelinesDetermine current stress stateDetermine loads accuratelyEstablish load & resistance factorsMinimize weightImprove load pathsShort occupancy → constructibilitySolve gravity loads firstImprove maintenance

GuidelinesDetermine current stress stateDetermine loads accuratelyEstablish load & resistance factorsMinimize weightImprove load pathsShort occupancy → constructibilitySolve gravity loads firstImprove maintenanceAnalysis last - think first!

23/28

24

Be creative

… and be careful.

Think first!

Some ideas …Accurately determine conditionReview loads and load factorsSubstitute lighter materialMake deck composite“Prestress” suspension bridgeAlter load pathsConvert the form of a bridgeAlter steel grade

24/28

25

25/28

26

Churn Creek Bridge

Fraser River, Canada

Churn Creek Bridge - before

5t limit

Churn Creek Bridge - after

30t limit

26/28

27

Increase capacity from 5t to 30t Replace wood with steel between Replace wood with steel between 08:3008:30--12:00 & 13:0012:00 & 13:00--16:3016:30 dailydaily