Winter Presentation Island 2000. Introducing ISLAND 2000.

Post on 29-Jan-2016

216 views 0 download

Tags:

Transcript of Winter Presentation Island 2000. Introducing ISLAND 2000.

Winter Presentation

Island 2000

Introducing

ISLAND 2000

Jonathan Wong

Michael Hughes

Renee Elsdon

Jonghoon Kim

Group PresentationMarch 10, 2000

ISLA

ND

20

00

Project Overview:

Design a new engineering center to replace an existing 3 story building at Island University, Florida.

ISLA

ND

20

00

Project Overview:

One building has a square footprint and one has an L-

shaped footprint.

ISLA

ND

20

00

Project Overview:

Requirement: The palm tree grove must be preserved, and

some internal spaces must have views to the grove.

ISLA

ND

20

00

Project Overview:

Requirement: Interior organization is based upon the affinity table.

The AFFINITY TABLE

Auditorium

FacultyLounge

Tech.supportComputer

Room

Secretaries

FacultyOffices

Chair’sOffice

SeniorAdmin.

Storage

Instructional Lab

StudentOffices

SmallClass

Seminar

Large Classrooms

* Size of bubble directly relates to required size of each room

TH

E

PR

OC

ES

S

architect

Aesthetics

A local site was selected

to authenticate the project

and aid in the architectural design process

A local site was selected

A local site was selected

That had a sandy, semi-populated beach

And offered a sense of serenity

San Francisco Bay

ANGEL ISLAND

Quarry Beach

Site Contours

OtherUniversityBuildings

And Site Model

ISLA

ND

20

00

Other “University” Buildings….

Don’t you want to be there?

ISLA

ND

20

00

Qualities of the site:

Strong visual attraction to specific points on the horizon

Tilden Park/Berkeley

Treasure Island/Bay Bridge

Chevron/San Rafael Bridge

ISLA

ND

20

00

Qualities of the site:

Nature of cove and hill forms gives the site a strong directional quality

ISLA

ND

20

00

Qualities of the site:

ISLA

ND

20

00

Cove form: radial directional

quality

ISLA

ND

20

00

Qualities of the site:

Qualities of the site:

Hill Form: Sloping

directional quality

Beach/Bay Form: endless horizontal directional quality

ISLA

ND

20

00

ISLA

ND

20

00

Sense of seclusion; other campus buildings are located out of sight

Qualities of the site:

Structural engineer

TH

E

PR

OC

ES

S

architect

Aesthetics

Structure

ISLA

ND

20

00

No seismic consideration

Qualities of the site:

ISLA

ND

20

00

Building needs to be designed for 110 mph wind

Qualities of the site:

Advantages of Material Selection

R/C Beams R/C with composites

Timber Timber w/ composites

Strength

Weight

Weather

Resistant

Cost

Effective

Ductile

Failure

Construction Manager

owner

Iterations between the members

Structural engineer

TH

E

PR

OC

ES

S

architect

Aesthetics

Structure

Planning

Chooses

Construction Manager

Structural engineer

architect

owner

TH

E

PR

OC

ES

S

Iterations between the members

A plan with

symmetry:

And organized

around the

auditorium

“”

Iteration Process

Iteration Process

“”

Components

Components

Auditorium is central elementAuditorium is curvilinear in all dimensions

Wall installed to support auditorium at the request of E-C

EN

GIN

EER

””

EN

GIN

EER

Issues

CO

NSTR

UC

TIO

N

EN

GIN

EER

””

””

–EN

GIN

EER

””

EN

GIN

EER

CO

NSTR

UC

TIO

N–

Establish Lines of Importance

San

Rafa

el B

ridg

eBerkeley

Treasure Island

Plan View

Circular Stairwell at intersection of circulation zones

Radial Circulation

Regions

auditorium

Large Class

Small class

Student Off.Seminar

lab

Tech support

Computer

Secretary

Chair’s Office

Senior Admin

Faculty

LoungeStorage

Interior organization

Section Cut Along an Axis

EN

GIN

EER

EN

GIN

EER

CO

NSTR

UC

TIO

N

Roof inspired by palm tree fronds

Want to achieve a curved, light roof

Auditorium has access from both the first and second floor. Second floor walkways are visible from the interior of the auditorium.

EN

GIN

EER

EN

GIN

EER

””

EN

GIN

EER

A-E-C Discussions

Will a glass wall hold up in a hurricane?

Glass wall is expensive.

Cloth roof will not allow MEP system to be located in roof, as

typically done.

Are wooden columns available

in 2’ diameter?

How Much Will These Alternatives Cost?

0%

20%

40%

60%

80%

100%

Site Work

Special Construction

Electrical

Mechanical

Conveying

Interior Construction

Roofing

Exterior Closure

Superstructure

Substructure

Foundations

Cost Breakdown Comparison

Cost Estimates

18%

1%

12%

8%1%

16%1%

23%

14%3% 3%

Foundations

Substructure

Superstructure

Exterior Closure

Roofing

Interior Construction

Conveying

Mechanical

Electrical

Special Construction

Site Work

18%

1%

12%

8%1%

17%1%

23%

14%2% 3%

Foundations

Substructure

Superstructure

Exterior Closure

Roofing

Interior Construction

Conveying

Mechanical

Electrical

Special Construction

Site Work

19%

1%

9%

8%

1%17%1%

24%

14%

3% 3%Foundations

Substructure

Superstructure

Exterior Closure

Roofing

Interior Construction

Conveying

Mechanical

Electrical

Special Construction

Site Work

0

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

$ (Millions)

R/C withComposite

Reinforcement

R/C Steel R/C withComposite

Reinforcement

R/C Steel

Cost

Budget

Budget = $ 4.33 MCost = $ 4.7-4.9 M

Cost Estimates

12%1%

13%

8%

1%

17%2%

25%

15%

3% 3%Foundations

Substructure

Superstructure

Exterior Closure

Roofing

Interior Construction

Conveying

Mechanical

Electrical

Special Construction

Site Work

12%1%

15%

8%

1%

17%2%

24%

14%

3% 3%Foundations

Substructure

Superstructure

Exterior Closure

Roofing

Interior Construction

Conveying

Mechanical

Electrical

Special Construction

Site Work

12%1%

12%

8%

1%

18%2%

24%

15%

4% 3%Foundations

Substructure

Superstructure

Exterior Closure

Roofing

Interior Construction

Conveying

Mechanical

Electrical

Special Construction

Site Work

0

0.5

1

1.5

2

2.5

3

3.5

4

4.5

$ (Millions)

R/C Wallswith

CompositeReinforced

Timber

R/C R/C withTimber

Framing

R/C Wallswith

CompositeReinforced

Timber

R/C R/C withTimber

Framing

Cost

Budget

Cost = $ 3.7-3.8 MBudget = $ 4.33 M

Cost Estimates

16%

1%

13%

12%

1%16%1%

21%

13%3% 3%

Foundations

Substructure

Superstructure

Exterior Closure

Roofing

Interior Construction

Conveying

Mechanical

Electrical

Special Construction

Site Work

17%

1%

10%

13%

1%16%

2%

21%

13%3% 3%

Foundations

Substructure

Superstructure

Exterior Closure

Roofing

Interior Construction

Conveying

Mechanical

Electrical

Special Construction

Site Work

0

0.5

1

1.5

2

2.5

3

3.5

4

4.5

$ (Millions)

R/C Walls withComposite Reinforced

Concrete

R/C Walls with SteelFraming

R/C Walls withComposite Reinforced

Concrete

R/C Walls with SteelFraming

Cost

Budget

Cost = $ 4.3-4.4 MBudget = $ 4.33 M

Cost Estimates

5% 1%

14%

12%

2%

18%2%

25%

15%

3% 3%Foundations

Substructure

Superstructure

Exterior Closure

Roofing

Interior Construction

Conveying

Mechanical

Electrical

Special Construction

Site Work

5% 1%

17%

12%

2%

17%2%

24%

14%

3% 3%Foundations

Substructure

Superstructure

Exterior Closure

Roofing

Interior Construction

Conveying

Mechanical

Electrical

Special Construction

Site Work

0

0.5

1

1.5

2

2.5

3

3.5

4

4.5

$ (Millions)

R/C Walls with SteelFraming

Timber Walls withTimber Framing

R/C Walls with SteelFraming

Timber Walls withTimber Framing

Cost

Budget

Cost = $ 3.6-3.8 MBudget = $ 4.33 M

Site Layout

Palm Grove

Existing Parking Lots and Roadways

Job Trailers

Mat’ls Laydown

Temporary Easement

Mobile Crane

Job Trailers Mat’ls Laydown

Temp. Easement

Mobile Crane

How Long Will It Take?

• Wood structure

• R/C in auditorium:

Sequence coordination

• Pile foundation

Quantity

Daily Output

• RS Means Data

• Based on Wood

Structure• 9.5 month

8.5 9 9.5 10 10.5 11

R/C

Wood Structure

• R/C structure• Pile foundation• Hillside excavation: 3 times backfill after

retaining wall

• Based on R/C• 12 month

0 2 4 6 8 10 12

R/C

Steel Framing

• Steel structure• Glass wall in 1st floor• Spiral stair• Skylight

• Based on steel

structure• 11.5 month

10.5 11 11.5 12 12.5 13

Steel Structure

R/C

• Steel truss• Canvas roof: vyl.

coated polyester fabric shell

• Based on wood structure, canvas roof

• 9 month

7.5 8 8.5 9

Wood Structure

Steel Structure

Does it meet affinity requirements?

Safe?View requirements?

Meet Budget?

OP

TIO

N C

OM

PA

RIS

ON

S

Exciting Statement?

Complexity

Best Choice

Our Choice

ISLA

ND

20

00

Reasons

• Owner preferred modern look for school

• Cost is Right Around Budget (Challenge)

• Easier Site Access

• Its OUR Design

Any Questions?