"When you've spent half your political life dealing with humdrum issues like the environment, it's exciting to have a real crisis on your hands."

Margaret Thatcher- 1982, commenting on the Falkland Islands War .

Fabric First

"What we are now doing to the world … is new in the experience of the Earth. It is mankind and his activities that are changing the environment of our planet in damaging and dangerous ways.

The result is that change in future is likely to be more fundamental and more widespread than anything we have known hitherto.

Change to the sea around us, change to the atmosphere above, leading in turn to change in the world's climate, which could alter the way

we live in the most fundamental way of all”.

Margaret Thatcher- to the UN general assembly, November 1989

Fabric First

ZERO CARBON HUB

The Zero Carbon Hub

PURPOSE AND STRATEGIC OBJECTIVES

Facilitate the mainstream delivery of low and zero carbon homes working across boarders

Provide leadership and

create confidence

Reduce risk

Disseminate information

ROLE OF THE ZERO CARBON HUB

New Non-Residential

Existing Homes

Existing Non-Residential

New Homes

VIABILITY

2016 TIMELINE

OVERHEATING

PERFORMANCE GAP

UK Government

And European Policy

& the Zero Carbon Agenda

The Government is committed to implementing ‘zero carbon homes’ from 2016.

The Department for Communities and Local Government (DCLG) will publish a detailed plan, setting out its response to the 2012 consultation on the energy efficiency requirements in building regulations, by May 2013.

The Government will then consult on next steps, including on the means of delivering allowable solutions by Summer Recess.

2013 Budget

The Zero Carbon Hierarchy.

Building fabricperformance

Carbon Compliance =On-site heat and

power generation

+Energy efficiency

On-site low/zero carbon energy

(and connected heat)

Allowable solutions

Zero Carbon = Solutions

addressing the carbon emission reductions that are difficult to achieve on site

+

Meeting Zero Carbon Targets

95% Complete

75% Complete

5% Complete

The Zero Carbon Journey

12

• DECC Heat strategy 2013

•Energy Performance Building Directive

• Review of Standards

CARBON CULPRITS

DEVELOPMENT LAYOUTS

Additional Considerations

Site Conditions:• Access • Location (regional weather)• Ground conditions • Flood risk• Existing trees, water bodies etc• Local energy resource – source for biomass, wind conditions etc• Existing district heating network

Planning:• Dwelling type mix/ density• Built form considerations - roof pitch, building height etc• PV and solar panels • Local Renewable targets

Site Layout:• Dwelling types• Design for solar technologies:

• Orientation for solar technology• Roof pitch• Over-shading

Other: • Localism

What is the Energy Strategy?

Overheating

THE EFFECTS OF CLIMATE CHANGE

observationsMedium-High emissions

Tem

pera

ture

cha

nge,

°C

8

6

4

2

0

Increase in the number of extremely warm days (2080s)Winter: 6-12 days/year Summer: 12-30 days/year

Source: Peter Stott, Hadley Centre16

Suite of guidance

The Performance Gap

Mind the gap !!

19

Performance gap

Does it do what it says on the tin?

Does it do what it says on the packet?

Mmmm?

Background & Evidence

23

Structure

24

Work Group 1

Steering Group

Industry Executive Committee

Work Group 2

Work Group 3

Work Group 4

Work Group 5

Cost Analysis

Reporting to government

Work Group 0 - Cross-cutting group focused on process

Dave Baker OBE

Richard Partington & Nigel Ingram

Work Group interaction

25

Project concept and

planning

Design

WG1 WG2

Design and assessment

tools

Materials and products

Procurement

Construction

WG3 WG4

WG0 - Cross-cutting group focused on process

Verification

WG5

Testing (in-line & end-of-line)&

Construction joint details

Oliver Novakovic

Bill Gething

Lynne Sullivan

David Adams

John Tebbit

Garry McDonald

Stewart Dalgarno

Mark Jones Hilary Elliott

Greg Cooper

Finally !

VENTILATION AND INDOOR AIR QUALITY (VIAQ) TASK GROUP

Zero Carbon Hub VIAQ Task Group

29

THANK YOU