1

‘WAVE HUB’ A Future for Wave Energy in

Cornwall

Dr Mike Patching BEng, PhD, CEng, MEI

2

‘Pelamis’ - Wave Energy in Action !!

3

Wave Hub - What is it?

Simple idea! §  An area of sea with an electrical cable and connection point

offshore into which arrays of Wave Energy Converters will be connected

§  A connection to the National Grid for initially up to 30 MW

of wave power

§  Permits to allow connection and operation of the facility

4

Why are we doing it?

§  Demonstrate commercial viability of wave energy

5

R&D

Initial prototype

Refined prototype

Pre- commercial device

Market entry with commercial product

Market penetration

Demonstration NaREC

Wave Hub

EMEC

Wave Hub … a route to commercialisation

6

What do we hope will happen?

§  Demonstrate commercial viability of wave energy

§  Maintain and strengthen the UK lead in marine renewable energy

§  Develop a new industry in the South West

§  Contribute significantly to the South West renewable energy generation

7

Where did it come from?

§  2001 SWRDA Regional Renewable Energy Strategy §  2002 Agreement to support biomass, wave and tidal power §  2002 Set up Regen SW §  Oct 2003 Seapower South West Report §  Jan 2004 METOC Seapower SW Review §  April 2004 Wave Hub Feasibility Study Starts

8

Feasibility Study Organisation

PROJECT MANAGERSCOTT WILSON OCEANS

Dr Mike Patching

SWRDAMr Dominic Vincent – Environment Manager

Advisory Group Regen SW

AD LITTLE' Business Case'

HALCROW'Technical Feasibility

Study'

BOND PEARCE'Consents and

Permits'

D CLARK'Publicity'

CSEP'StakeholderConsultation'

9

Project Requirements (What do we need to do?)

§  A site (offshore and onshore) §  A suitable resource (wave energy) §  A grid connection §  Feasible technology (practical and cost effective) §  A business case (market need and financially viable) §  Legally allowed to do it (permits and consents including an

EIA) §  Stakeholder support

10

11

Grid Connection Options

Western Power Distribution Network

12

13

14

15

Inshore shipping route

16

Wave Energy Converter Arrays

Gen

Gen

Gen

Cable

Support Buoys

33kV Sub-Sea Cable

Wave Hub

Substation

33kV Cable Joint

Utility Company Substation

33kV Bus-bar Connection Point

Cable Duct Directionally Drilled

Through Sand Dunes

33/11kV Power

Connection Unit

11kV Wave Energy Device

Connection Cables

11kV

Cable

Splices

Termination &

Distribution Unit

11kV Wave

Energy Device Cables

WAVE HUB EQUIPMENT

Wave Hub System

Diagram Figure5.3

33/11kV Power

Connection Unit

11kV Wave Energy Device

Connection Cables

1 x 3-core 33kV Underground

Cable

33kV PCU

Connection

Cables

Shore based equipment

Wet Hub

Communications and

Control

33kV Circuit Breakers

Workshop

Gen

17

The wet hub

§  Sub-sea transformers

§  Remotely operable sub-sea switchgear and protection systems

18

Typical 33kV Cable

19

20

21

22

Potential Benefits

The potential to create an International industry in SW

§  Development of wave energy sector and associated supply chains –  including marine technology and advanced engineering resulting in over 450 jobs in the

SW by 2010 and 700 by 2020. §  Inward Investment

–  GVA from indirect impacts to the SW of £15million and £27 million respectively with 20-40% expected in Cornwall.

§  20MW wave power produced and sold by 2008 –  supplying 14,000 homes; meet up to 30% of Cornwall’s renewable energy target and

up to 5% of the Regional target. §  Links to Higher Education

–  Centres of Excellence in CUC, Plymouth and Exeter leading to the establishment of a high profile wave energy R&D base in west Cornwall.

23

Wave Hub – a long way to go!

Major issues to be addressed: §  Funding §  Consents and Licenses §  Stakeholder Agreement §  The Wave Device Developers §  Engineering Studies and Surveys §  Detailed Design §  Procurement §  Construction §  Operation

24

Permits & Consents

§  Electricity Act 1989 Section 36 (DTI) §  Food & Environment Protection Act 1985 (DEFRA) §  Coast Protection Act 1949 §  Town & Country Planning Act 1990 §  Electricity Act 2004 §  The Marine Bill ? §  European Legislation - EIA Directive §  Nature Conservation Directives §  SEA §  Crown Estate §  ING

25

Contracts

§  Power Purchase Agreement (PPA) §  Device Developer Agreement(s) §  Engineering Procurement and Construction (EPC) §  Grid Connection Agreement §  Management, Operation and Maintenance Agreement §  Metering Agreement §  Company Formation

26

Costs

Wave Hub Development and Construction Estimated Costs

Stage 95% probability ofbeing exceeded

Mean probability 5% probability of beingexceeded

Development £1.25 million £1.42 million £1.60 million

Construction £11.41 million £12.42 million £13.45 million

27

SWRDA WAVE HUBPROJECT TIMELINE 2006 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

DEVELOPMENT:SWRDA Funding & Staff

Carry out EIASite SurveysEngineering design for EIA

DTI/CE/DEFRA ConsultationPlanning Route MapPlanning Applications Granted

Wave MeasurementEnergy AnalysisEngineering Specifications

WHMCBusiness Plan and Funding

Contracts (Developer, Grid, EPC)

Design & Tender for Construction (OJEC)

PROCUREMENT: Wave Energy DevicesWet Hub (transformers)CablesSwitchgear

CONSTRUCTION: ONSHORE OFFSHOREGrid ConectionCommissioning

OPERATION:

2005 2006

CAPITAL FUNDINGGRANTED FOR PROCUREMENT & CONSTRUCTION

PLANNING

WHMC CONTRACTS WITH DEVELOPERS, UTILITY AND EPC CONTRACTOR

Appoint WHMC Managing Director

MOU with Project Developers

Complete Business Plan & Apply for Funding

28

Conclusions

§  It is Technically Feasible !! §  It is wanted and supported by Industry and Government §  It is supported by SWRDA §  It appears to have positive environmental benefits and