Post on 22-Feb-2016
description
Warm Springs Extension Alignment
1
Fremont Central Park Subway
Line, Track, Station and Systems
BART Overpass (City of Fremont Grade Separation Project)
Fremont Station
Warm Springs/South Fremont StationFremont Central Park
South Subway Portal
North Subway
Portal
North Ventilation Structure
Lake Elizabeth
South Ventilation Structure
Irvington Station (Future)
Walnut Ave.
Washington Blvd.
Auto Mall Pkwy.
S. Grimm
er Blvd.
Mission Blvd.
BART Overpass
Paseo Padre Pkwy.
Stevenson Blvd.
1
Tie-in Point for SVBX Project
1
Subway Work Progress
2
LTSS Work Progress
3
WSX Project Schedule
Subway ContractProject Completion Spring 2013
LTSS ContractRevenue Service Fall 2015
4
Project Location
5
HMC and Hayward Shop ModificationsSite Plan
Hayward Shop Vehicle-level Overhaul
Shop
Component Repair Shop
Central Warehouse
Non-Revenue Vehicle
and M&E (Maintenance
& Engineering) Shop and
Storage Yard
Hayward Maintenance Complex (HMC)
123
New Track
Access
6
Contract 1 Site Plan
Component Repair Shop
Hayward Shop Modifications
BART Mainline
7
Tie-ins and crossover
Contract 2 Site Plan
8
9