Warm Springs Extension Alignment

1

Fremont Central Park Subway

Line, Track, Station and Systems

BART Overpass (City of Fremont Grade Separation Project)

Fremont Station

Warm Springs/South Fremont StationFremont Central Park

South Subway Portal

North Subway

Portal

North Ventilation Structure

Lake Elizabeth

South Ventilation Structure

Irvington Station (Future)

Waln

ut A

ve.

Wash

ing

ton

Blv

d.

Au

to M

all P

kwy.

S. G

rimm

er B

lvd

.

Missio

n B

lvd.

BART Overpass

Pase

o Pa

dre

Pkw

y.

Ste

venso

n B

lvd.

1

Tie-in Point for SVBX Project

1

Subway Work Progress

2

LTSS Work Progress

3

WSX Project Schedule

Subway Contract

Project Completion Spring 2013

LTSS Contract

Revenue Service Fall 2015

4

Project Location

5

HMC and Hayward Shop ModificationsSite Plan

Hayward Shop Vehicle-level Overhaul

Shop

Component Repair Shop

Central Warehouse

Non-Revenue Vehicle

and M&E (Maintenance

& Engineering) Shop and

Storage Yard

Hayward Maintenance Complex (HMC)

123

New Track

Access

6

Contract 1 Site Plan

Component Repair Shop

Hayward Shop Modifications

BART Mainline

7

Tie-ins and crossover

Contract 2 Site Plan

8

9