Warm Springs Extension Alignment
1
Fremont Central Park Subway
Line, Track, Station and Systems
BART Overpass (City of Fremont Grade Separation Project)
Fremont Station
Warm Springs/South Fremont StationFremont Central Park
South Subway Portal
North Subway
Portal
North Ventilation Structure
Lake Elizabeth
South Ventilation Structure
Irvington Station (Future)
Waln
ut A
ve.
Wash
ing
ton
Blv
d.
Au
to M
all P
kwy.
S. G
rimm
er B
lvd
.
Missio
n B
lvd.
BART Overpass
Pase
o Pa
dre
Pkw
y.
Ste
venso
n B
lvd.
1
Tie-in Point for SVBX Project
1
Subway Work Progress
2
LTSS Work Progress
3
WSX Project Schedule
Subway Contract
Project Completion Spring 2013
LTSS Contract
Revenue Service Fall 2015
4
Project Location
5
HMC and Hayward Shop ModificationsSite Plan
Hayward Shop Vehicle-level Overhaul
Shop
Component Repair Shop
Central Warehouse
Non-Revenue Vehicle
and M&E (Maintenance
& Engineering) Shop and
Storage Yard
Hayward Maintenance Complex (HMC)
123
New Track
Access
6
Contract 1 Site Plan
Component Repair Shop
Hayward Shop Modifications
BART Mainline
7
Tie-ins and crossover
Contract 2 Site Plan
8
9