Vld18.6 eng

Post on 18-Jan-2015

97 views 0 download

Tags:

description

 

Transcript of Vld18.6 eng

ME

Viladesign Engineering (VLD), was founded in 2007, as a mechanical engineering company with the aim of offering technological solutions.

As a specialist in welding and assembly lines, we are mainly active in the automotive industry, and more specifically in body and white processes.

Our young and dynamic company offers customized and flexible support to each client’s needs, always providing good results and effective solutions.

.

ME

Our well trained staff have wide experience in machine design within different industry fields, amongst others:

VLD engineers work with modern design techniques to enable the optimum results for each project, using several specialist software programmes.

Automotive Aeronautics Railroad Renewable energies

ME

• Staff: 20 people

• Internal capacity engineering per year: 38.000 hours• Internal simulation capacity per year: 6.000 hours

• External support (partnership agreements with other engineering companies): >10.000 hours per year

• Planning and Design software : • CATIA V4/CATIA V5, • Fides• RobCAD• PD/PS• MicroStation, • AutoCAD

ME

VLD is a mechanical company specialising in engineering services, such as:

•Simultaneous engineering.

•Analysis and improvement of processes

•Process simulation

• 3D Studies

• 2D Studies

• Ergonomics studies

•R&D+I

ME

Automotive environments

Our staff is trained to work in automotive environments such as:

ME

SUPPLIER PROJECT YEAR SCOPE

SE37xSE37xSE37xSE37x

2011201120112012

REAR FLOOR ASSEMBLY LINE H STRUCTURE LANGSTRAGE LH+RH4M & GAS REAR FLOOR ASSEMBLY CELLS

VW364PQ25/PQ35

20122010

HEMMING FIXTURES TAILGATEFCE/FCO/RCE/RCO ASSEMBLY LINES (TIGHTENED)

J87X62X62X62X95

20112009200920092008

GRIPPERS LINE C1 (Ouvrants)DEMI BLOC CELLTABLIER CELL BODYSIDE TOBODYSIDE INNER BK95

P2683 2009 ROOF ASSEMBLY LINE

X07 2012 SOUDURE BERCEAUX

T7/B7B73rT73

20122011

WELDING OF REAR AXELCROSS CAR BEAM WELDING (CCB)CROSS CAR BEAM WELDING (CCB)

V408V408V363CD4

C520C520C520

2012201220122012

201120112011

7A WELDING CELL 8F05 WELDING CELL 7L WELDING CELLWELDING CELL FOR RR Camber link LH/RH & Toe link LH/RH & RR Integral link LH/RH7A WELDING CELL7B10 WELDING CELL7J WELDING CELL

ME

SUPPLIER PROJECT YEAR SCOPE

2009 FLOOR ASSEMBLY LINE FOR HEAVY TRUCKS

2012 FCE/FCO/RCE/RCO ASSEMBLY LINES (TIGHTENED)

2012 WELDING LINE FOR HONDA FIT REAR AXLE

M3 F80/82

201220122012

WELDING LINE FOR UKL REAR AXELWELDING LINE FOR UKL FRONT AXELBMW HAT F8xM3 – BAT Schwandorf

J02CP32S/TX12-K

201220122012

SIDE MBR FR SUSP RH&LH.BATTERY MODUL

VS20 2011

ME

€-

€200.000,00

€400.000,00

€600.000,00

€800.000,00

€1.000.000,00

€1.200.000,00

€1.400.000,00

2008 2009 2010 2011 2012

Sales

0,0%

5,0%

10,0%

15,0%

20,0%

25,0%

30,0%

35,0%

40,0%

45,0%

50,0%

2007 2008 2009 2010 2011 2012

Export (% of sales)

Customers source

0

1

2

3

4

5

6

2007 2008 2009 2010 2011 2012

EU

Spain

0

5

10

15

20

25

2008 2009 2010 2011 2012 2013

Technical workforce

ME

REAR FLOOR (GAS+4M) PROJECT SE-37X

ME

FRONT Längsträger LH/RH – PROJECT X82 (20 Robots)

ME

WELDING LINE CELL FOR A BATERY MODUL- NISSAN X12K

ME

8F05 CELL PROJECT V408 (20 robots)

ME

7A CELL PROJECT V408 (17 robots)

ME

MIG/MAG WELDING LINE REAR AXEL UKL BMW

ME

MIG/MAG WELDING LINE FOR A FRONT AXEL

ME

SIDE MBR FR SUSP RH&LH PROJECT P32S (15 robots)

ME

7L WELDING CELL PROJECT V363 OTOSAN

ME

REAR FLOOR ASSEMBLY LINE PROJECT SE-37X (39 robots)

ME

LANGSTRAGE LH + RH SE-37X SEAT ZF (39 robots)

ME

H STRUCTURE PROJECT SE-37X (5 robots)

ME

7B10 / 7A / 7J CELLS PROJECT C520 (10 robots)

ME

ROOF ASSEMBLY LINE (17 robots)

ME

DEMI BLOC CELL X62 Project (BATILLY) (7+7 ROBOTS)

ME

TRANSPORT OVERT (TO) FIXTURES X62 Project (BATILLY)

ME

FLOOR ASSEMBLY LINE FOR HEAVY TRUCKS (10 robots)

ME

MIG WELDING CELL PROJECT NCV2 - (5 robots)

ME

MIG/MAG FLEXI-CELL REAR AXEL Honda Fit

ME

MIG/MAG WELDING FIXTURES NCV2 & IP SUPPORT

ME

MIG/MAG WELDING FIXTURES

ME

KNUCKLE Assembly– Pressing cell

ME

VW364 GP HEMMING FIXTURE TAILGATE

ME

TIGHTENED LINE PROJECT PQ25 – PQ36

ME

TIGHTENED LINE PROJECT PQ25 – PQ36

ME

RCE/RCO/FCE/FCO TIGHTENED LINE

ME

TIGHTENED ASSEMBLY LINE

ME

Photovoltaic panels assembly line

ME

ROBOTIZED CELL INSERTION PANORAMIC ROOF PAD+A05

ME

ASSEMBLY LINE- FRONT END

ME

TPMS ASSEMBLY LINE

ME

TIRE GUARD ASSEMBLY LINE

ME

ASSEMBLY LINE .

ME

TOOLING

ME

CONVEYORS INTEGRATION & FIXTURES DESIGN

ME

CONVEYORS INTEGRATION & FIXTURES DESIGN

ME

CONVEYORS INTEGRATION & STRUCTURES DESIGN

ME

CONVEYORS INTEGRATION & STRUCTURES DESIGN

ME

CONVEYORS INTEGRATION & STRUCTURES DESIGN

ME

FINITE ELEMENTS ANALYSIS

ME

MAIN CUSTOMERS

Our customers are companies from the automotive, aerospace and solar energy industries amongst others.

ME