“As one of the largest providers of health care and other benefits, theFederal government can have a major impact on both cost and quality. To that end, we are implementing centralized IT managementto help us better leverage our resources to reduce the overall cost of IT, provide new services faster, and improve our ability to provide quality services.
The goal is to have our operational effectiveness improve as we share best practices across operating units, standardize applications and systems to allow secure access to data across units, and eliminate the repetitive administrative procedures that waste their time and energy.” VAnguard, November/December 2006
Bob HowardAssistant Secretary for Information and Technology
3
OI&T Vision Statement
The VA Office of Information and Technology (OI&T)
strives to be the leader among Federal IT
organizations providing secure, high-quality, and
responsive service to supported organizations in
meeting business needs by leveraging state-of the-art
technologies and building a high-performing
workforce dedicated to the success of those they
serve.
4
CIO Priorities
Establish a well-led, high-performing, IT organization that delivers responsive IT support to the three administrations (business lines) and central office staff sections.
Standardize IT infrastructure and IT business processes throughout VA. Establish programs to make VA’s IT systems more interoperable and
compatible, not only within VA, but also with the other Federal agencies with which we interact.
Manage VA IT appropriation effectively to ensure sustainability and modernization of our IT infrastructure and more focused application development to meet increasing and changing requirements of our business units.
Strengthen data security controls within VA and among our contractors to substantially reduce the risk of unauthorized exposure of sensitive veteran or VA employee information.
Create an environment of vigilance and awareness to the risks of compromising veteran- or employee-sensitive personal information within VA by integrating security awareness into daily activities.
Remedy the department’s long-standing IT material weaknesses relating to a general lack of security controls.
5
IT Operations Initiatives
IT Field Operations IT Field Security Operations IT Telecommunications
6
IT Field Operations
7
RDP / NDCP Vision
•While that is not possible today, we will continue moving toward this goal by designing and supporting initiatives that lend themselves to achieving this vision.
•In VHA, where it makes sense and lends itself to the regional data center model, we will continue to collapse to VISN-centric data centers in preparation to moving into a regional data center.
•By 2009, all VHA VistA systems will have migrated to regional data centers.
•By 2007, corporate data centers will begin to collapse.
•While that is not possible today, we will continue moving toward this goal by designing and supporting initiatives that lend themselves to achieving this vision.
•In VHA, where it makes sense and lends itself to the regional data center model, we will continue to collapse to VISN-centric data centers in preparation to moving into a regional data center.
•By 2009, all VHA VistA systems will have migrated to regional data centers.
•By 2007, corporate data centers will begin to collapse.
ExplanationExplanation
The vision is to have one national data center with
full redundancy serving the
entire VA.
The vision is to have one national data center with
full redundancy serving the
entire VA.
NDCP VISIONNDCP VISION
8
Four Physical IT RegionsTwo Virtual Regions: Region 5 (VBA) and Region 6 (NCA)
9
Regional Data Processing Goals Migrate VistA databases from VAMCs to regional data centers
(RDCs) Provide robust continuity of operations (COOP) provisions for VistA,
Exchange, file storage, and security systems to include: Real-time redundant systems housed at two geographically distinct
RDCs VAMC-based VistA read-only (VistARO) system
Maintain cache as VA’s VistA database until the agency provides a different direction
Consolidate Microsoft Exchange – e-mail archive systems are being consolidated
Regionalize file data storage systems Regionalize security systems and strengthen security posture Maintain a disciplined IT project management structure Remediate IG and GAO vulnerabilities and address OMB
requirements Implement a One-VA enterprise architecture
10
ONE-VA NDCP 2010 CONCEPTUAL END-STATEONE-VA NDCP 2010 CONCEPTUAL END-STATE
One-VA NDCP 3-Year Goal (2009)
REGION 1 REGION 2
Puerto Rico
Hawaii
Alaska
REGION 4
REGION 3
Guam
Philippines
RDPC Location
•Set the gold standard for future interoperability with DoD and the private sector
•Establish four national data processing centers serving the VA business needs
•Fully implement COOP/ disaster recovery
•Build standardization in IT business structure, process, and technology
•Build tiered network/ security management framework strengthening the NSOC
•Set the gold standard for future interoperability with DoD and the private sector
•Establish four national data processing centers serving the VA business needs
•Fully implement COOP/ disaster recovery
•Build standardization in IT business structure, process, and technology
•Build tiered network/ security management framework strengthening the NSOC
Becoming the “Gold Standard”Becoming the “Gold Standard”
11
Next Steps Continue with the current RDP migrations
The current schedule projects that all VHA medical centers will be migrated to RDCs by the end of FY ’08
Planning has already begun to establish the Denver RDC as the COOP facility for the Austin CFDC – which serves as the starting point for the NDCP
Site selection for the remaining data centers is currently underway The baseline requirements are being developed for all NDCP
components – beginning with a detailed inventory of major systems Components migrating to the national data centers IT field operations elements VBA NCA CDCs Program offices (CMOP, HEC, HAC, etc.)
An OMB 300 business case has been developed for the program – but will be re-baselined to reflect the current progress of the initiative and the refinement in the operating costs to date
The IT field operations leadership team will continue to work with the administrations, program offices, and major systems’ owners to determine the impact the NDCP effort on these programs
12
IT Field Security Operations
13
NSOC Vision
The Department of Veterans Affairs Network and Security Operations Center (VA-NSOC) serves as the VA’s network management and security operations element within Critical Infrastructure Protection Service (CIPS) Field Security Operations (FSO).
The VA-NSOC manages, protects, and monitors the network and cyber security posture of the agency; coordinates externally with government incident response centers; performs threat and vulnerability analyses; reports cyber security and network deficiencies; develops concept of operations or guidelines relating to cyber security incidents; performs analyses of cyber security events; maintains detailed logs and databases of VA cyber security incidents and responses; and generally performs the full range of functions across the spectrum of activities relating to incident management, network management, and response.
14
VA Network & Security Operations Center (NSOC)
Network & Security Operations Center (NSOC), Hines
(Primary Security Centric Operations)
Network & Security Operations Center (NSOC), Falling Waters
(Primary Network Centric Operations)
Security Response Team
Incident Response Team
Device Management Team
Secure Remote Access
Root Cause Analysis
Gateway Services
Enterprise Network Services
VA Network & Security Operations Center (NSOC)
15
IT Telecommunications
16
IT Telecommunications Vision
Bring the Veterans Affairs to a
state-of-the-industry capacity to handle
converged transport of data, video, and
voice traffic.
17
Backbone Initiative
Carrier class quality of service (QoS) Enhanced network security Enhanced scalability, reliability, load
balancing and fail over MPLS technology
18
One-VA Enterprise Network – Current
19
One-VA Enterprise Network – Future
Carrier MPLSSprint
RDPC
Region 1
Region 1
Region 19
Region 19
Distribution Layer
Access Layer
Region 19
Region 19
Internet
Internet
Internet
Internet
Internet
InternetInternet
Internet
Internet
Internet
Internet
Internet
Core Layer
VA Corporate Data Centers
Carrier MPLSAT&T
20
MPLS – Looking Forward
Extend this network topology beyond the VA backbone to the regional wide area networks and the regional data centers
Deploy a centralized video teleconferencing service
Develop a One-VA dial plan and a voice and video admission control process
21
Telecommunications Operations Support System (TOSS)
22
TOSS Goal
Implement a Web-based enterprise telecommunications management solution that provides order management, inventory management, invoice management, and cost management using a service oriented architecture-based extensible workflow platform and VA-specific usage patterns and business process models.
23
TOSS – Looking Forward
Cleanse existing hierarchy code and organization data
Conduct Networx transition requirements analysis
Design and implement new Networx vendors and services
Deploy and train TOSS VA-wide Migrate TOSS within VA infrastructure
24
FTS – Networx Transition
25
FTS – Networx Transition Goal
Providing a framework that supports cross-agency collaboration, transformation, and government-wide technology improvement by maximizing the use of government resources
Providing a common procurement infrastructure Providing a performance-based approach that will
embrace commercial, technical, and interface standards.
26
FTS – Looking Forward
Create an operational support system to help
our transition to Networx and establish a model
for all Federal government agencies.
27