Vaux le vicomte

Post on 12-Jul-2015

892 views 3 download

Tags:

Transcript of Vaux le vicomte

Damien VUILLET Technical and sales meeting – April 2012

Technical and sales meeting

Vaux le Vicomte Castle

Damien VUILLET Technical and sales meeting – April 2012

Main specifications :-Renovation of the main dome with no support on it

-Castle opened to the visitors

-Access of the working site above the river

-Scaffold with canopy on each face

-Keder roof at the top

Damien VUILLET Technical and sales meeting – April 2012

3D view

Damien VUILLET Technical and sales meeting – April 2012

3D view with only steel deck

Damien VUILLET Technical and sales meeting – April 2012

The footbridge access

-Length of 19m

-Assembled on ground then put in by crane

-7T500 of ballast for the stability

Damien VUILLET Technical and sales meeting – April 2012

Principle of the scaffold

Creation of 4 scaffolds beams

Top view

Damien VUILLET Technical and sales meeting – April 2012

Front view Middle view

No support on the dome

Damien VUILLET Technical and sales meeting – April 2012

Rear view

Fixation on the wooden skeleton

Damien VUILLET Technical and sales meeting – April 2012

Section in the middle of the dome

Fixation on the wooden skeleton Last level of anchoring (3 plugs)

Damien VUILLET Technical and sales meeting – April 2012

Damien VUILLET Technical and sales meeting – April 2012

Damien VUILLET Technical and sales meeting – April 2012

Damien VUILLET Technical and sales meeting – April 2012

Damien VUILLET Technical and sales meeting – April 2012

-150t of LAYHER scaffold system

-760kg of wind force by plug

-1160kg on each wooden fixation

-Maximum load per standard : 3580kg