USSaudiForum - Panel 13 - Neal Wunderlich - Opportunities in Electricity and Energy

Post on 20-May-2015

751 views 8 download

Tags:

description

The 3rd US-Saudi Business Opportunities Forum was held Sep 16-18, 2013, bringing together officials, business people, educators and specialists highlighting the U.S.-Saudi trade relationship and how U.S. companies can participate in Saudi Arabia's expansion. Saudi Arabia is undergoing an extraordinary economic boom. Massive public investment, rapid private-sector growth and new sector initiatives are driving an expansion projected to offer more than $1 trillion in trade and investment opportunities over the next decade. This panel of distinguished experts highlighted the opportunities in electricity and energy.

Transcript of USSaudiForum - Panel 13 - Neal Wunderlich - Opportunities in Electricity and Energy

Wunderlich-MalecDesign - Build

Modular Integrated Control Enclosure Solutions

January 17, 2013

2

• Founded in 1981• Headquarters in Minnetonka, Minnesota• Full Service Engineering & Systems Integration• Electrical & Control Enclosure Manufacturing• 220 Professionals – All Customer Focused• Growing – Employee Owned Corporation

‣ 277th on Engineering News Record top 500

‣ One of 5000 Fastest Growing Small Businesses

‣ 19 Local US Offices

‣ Deliver Service & Systems Globally

• WMSaudi Company

WM Overview

3

• WM Engineering & Design Services

• Integrated Systems

• WM Manufacturing Services

• Protective Relay & Control Panels

• Modular Integrated Control Enclosures

Customer Services

• 70,000 Sq. Ft.Manufacturing

• Innovative Design

• 30 & 5 Ton Crane

• Radiant Heated Floors

• Drive thru Truck Loading

• ISO9001:2008 Compliant with Paperless Documentation

4

• GE VAR – Multilin, D20 and D200 Product Lines

• Siemens Energy - Smart Grid Solutions Provider

• Substation Design & Communications Engineering

• Integration and Testing Services / IEC61850

Alliances & Capabilities

5

WM uses Innovative Technologies for Quality Control

Quality System

• Matrix Quick Response (QR) Codes for Labeling of‣ Panels

‣ Equipment

‣ Terminations

‣ Cables

• Provides Benefits‣ Links to Drawings & Bill of Materials

‣ Accelerates Testing

‣ Shortens Schedules

‣ Facilitates Asset Management

‣ Provides Lifecycle SolutionWM has a Patent Application Pending

for Matrix (QR) Code use in Engineering and Quality Control

WM Engineer Reading Panel QR Code with smart phone to

download into Laptop

WM Panel with QR Code on Door

Innovative Solutions

• QR Scan is Quick‣ Link to On-Line Documentation

‣ Equipment Specifications

‣ Fabrication Drawings

‣ Wiring Diagrams

• Information Immediately Available for‣ Fabrication

‣ Inspection, Testing & Commissioning

‣ Service & Maintenance

Plant Designed for Productivity

Paperless Quality System • Compliant to ISO 9001:2008

Flat Bed Enclosure Design

WM uses On-Line Documentation

Termination with Barcode

WM has a Patent Application Pending for Matrix (QR) Code use in

Engineering and Quality Control

7

WM has Significant Project Experience Integrating Leading Equipment Suppliers into our Power Industry Projects:

Project Experience

• Switchgear

• Transformers

• Protective Relay and Control

• SCADA & RTUs

• Factory Tested at our Facility

• Site Acceptance Tested at Substation

• Our Engineered Solutions provide the BEST Customer Fit and Value‣ Monitoring

‣ Protection

‣ Substation Automation

‣ Upgrades

8

WM Designs and Builds Substations Using Modular Solutions

Modular Solutions

Complete, Assembled & Tested

• Process Equipment

• Battery Banks & Chargers

• Protection & Control Panels

• Termination Panels

• Interconnection Assemblies

• Fiber Optic & LAN Systems

• DCS, SCADA, HMIs

• Lighting

• BAS/HVAC

• Life Safety

• Security

9

Why Design and Build Using Modular Solutions ?

Project Benefits

Integrated Control Houses

• Pre-Tested Integration

• Better Quality with Manufactured Product

• Less Craft Interference

• Less Site Construction

• Shorter site Schedule

• Shorter time to Complete

• Reduced overall Cost

SAVINGS

December 19, 2007

December 27, 2007

April 18, 2007

Substation with a 48 x 64 ft Modular Control House

4 Months

Thank you!

Question & Discussions

• Questions

• Action Items

• Related toProcesses InnovationCustomers Development Savings

10