Post on 01-Apr-2021
USMC Materiel Readiness
Ms. Susan KinneyDeputy Director, Logistics Plans, Policies, and Strategic Mobility
Division, Installations and Logistics Department, HQMC
USMC Materiel Readiness• Readiness reports are updated weekly
– Marine Corps Integrated Maintenance Management (MIMMS) is the primary source program
– MC Bulletin 3000 lists equipment to be reported on (Major End Items, only)
• Includes Combat Essential Equipment– MIMMS feeds data to SORTS
Readiness = Possessed-DeadlinedPossessed
C-TAMNBC
D-TAMMotor Transport
E-TAMOrdnance
B-TAMEngineering
A-TAMCommunications
Reportable TAMs
OEF After Action Comments• Warranties
– “USMC Clause”• Contractor Logistics Support
– “Contractors will not go beyond Theater Aerial/Sea Port of Debarkation”
• Early ops had decreased maintenance workload– Sustained Ops dependent on distribution
Readiness by Category
Readiness Factors• Aging Equipment
– AAV 20 years beyond expected service life (last in service will have 46 years)
• Obsolescence– M-198 Howitzer– H-46 Medium Helicopter– AN/TPS-63 Radar
• Personnel Turnover– 18% Reenlistment of 1st Term Mechs
• Supply– NMCS rate 38% (of total deadlines)
• Cannibalization– Not significant for overall ground equipment
Selected Aging Equipment
AVG EQUIP AGE
SLEPPROG SERVICE LIFE
AGE OF LAST IN INVENTORYXX
AVG EQUIP AGE
SLEPPROG SERVICE LIFE
AGE OF LAST IN INVENTORYXX
3730 28
2430
20 2118 17 17 19
1520 20
10
20 2014
20 2015
20
0
10
20
30
40
50
60
70
KC-130F CH-46E CH53D UH-1N AAV M198 5-TON HMMWV LVS LAV ROWPU
(KC-130J) (MV-22) (4BN) (EROWPU)(SLEP)(MTVR) (MV-22) (AAAV) (LW155)
IOC
FOC
02 01
14
99
10
04
12
06
17
05
08
01
04
01
14
(HMMWVA2)05
09
05
08
(KC-130J) (MV-22) (4BN) (EROWPU)(SLEP)(MTVR) (MV-22) (AAAV) (LW155)
IOC
FOC
02 01
14
99
10
04
12
06
17
05
08
01
04
01
14
(HMMWVA2)05
09
05
08
YEARS
30
20
30
63 37 46 23 32 22
47 34 26 28 30
What Are We Doing• Focus on Capitalization (equipment
modernization)• CBM+
– Using sensors for prognostic/diagnostic information and/or equipment condition
• PMCS changes• Collapse of Echelons of Maintenance
– Consolidate at Intermediate Level• Personnel
– Knowledge Capture
The Way Ahead• Better Business Practices• Depot Maintenance/Partnerships• ILC
– Collapse Echelons of Maintenance– SecRep Management
• Autonomic Logistics• Repair Cycle Time (RCT) Focus
– Process improvement using Warfighter Portal
The Way Ahead• TLCLM
– Autonomic Logistics– CBM+
• Educational Alliances– Penn State School of Business
The Result
People
Equipment
Processes
EnhancedReadiness