Useful Objects

TextTextText

Gdfgg

Text

STICKER AND OTHERS EXAMPL

E ESTIMATE

BACK UP

PROPOSED

CONCEPTUAL

TENTATIVE

PRELIMINARY

ROUGH ESTIMATE

HYPOTHESIS

ILLUSTRATIVE

TO BE COMPLETED

CONFIDENTIAL

ONLY FOR DISCUSSION

REVISED

VERY PRELIMINARY

High

Mediu

m

Low

EXAMP

LE ESTIMAT

E

BACK

UP

PROPOSE

D CONCEPTUA

L

TENTATIV

E

PRELIMINARY

ROUGH ESTIMATE

HYPOTHESIS

ILLUSTRATIV

E

TO BE COMPLETED

CONFIDENTIA

L

ONLY FOR DISCUSSION

REVISE

D

VERY PRELIMINARY

PRELIMINARY

USEFUL OBJECTS

USEFUL OBJECTS

USEFUL OBJECTS

Horizon 1

Extend and

defend core

business

Horizon 2

Build

emerging

businesses

Horizon 3

Create

vehicle

options

1

-

2

4

-

6

8-1

0

L M H

L

M

H

Impact on ROE

Implementation

High

Low

Hi

gh

Low

1

2

xxxx

xxxx

xxxx

xxxx

Header Header Header Header

Header Header

• • • •

• • •

xx xx xx

Text

erformanceerformancetructuretructure onductonduct

• xxx • xxxx • xxxx• xxxx

External shock S C P

xxxx

xxxx

xxxxx

xxxx

xxxx

xxxxx

PRELIMINARY

Attractive

Unattractive

Legend

Legend

Legend

1

2

3

4

5

6.1 point

increase in

ROIC

User applications

Personalization

Middleware services

Transaction support

Enabling services

Management tasks for company-wide and BU levelEstablishing task priorities and action planProviding methodologies for strategy establishment

Project scope

Project purpose

Through the analysis of environment and diagnosis of

company-wide management, management tasks will be

produced to strengthen the competitiveness of SK E&C,

thereby proposing the roadmap for the implementation.

*Footnote

Source: Source

Review CRM efforts to date 1

PROCESS GOING FORWARD FOR K2 DEAL

VALUATION AND SYNERGY ESTIMATION• Refine base scenario• Review base scenario with Kronus working

level team• Build multiple scenarios and conduct

sensitivity analysis for negotiation• Review valuation and synergy estimates

scenarios with Kronus working level team• Refine valuation and synergy estimates

scenarios

DEAL STRUCTURE OPTIONSDEVELOPMENT• Refine deal structure options• Conduct quick legal review• Review the options with Kronus leadership

team• Refine the options

NEGOTIATION GAME PLAN DEVELOPMENT

• Develop game plan draft• Review and refine game plan

TERM SHEET DEVELOPMENT• Write term sheet draft• Conduct legal review• Finalize term sheet

PHASE 1 PROGRESS REVIEW

START NEGOTIATION

5432

April

29282726 3022212019 2315141312 616

March

CEO

Chairman

New business opportunity

Human resource management

Intangible building (knowledge, network, brand)

Operational & financial efficiency enhancement

To improve quality

of life Corporate value maximization through selection and concentration

Sound cashflow, operation management business network, good reputation & culture

*Footnote

Source: Source

EVALUATION OF CANDIDATES FOR MEGA-

MERGER

Hankook

Huvis

Hyosung

Hyosung or Huvis

VERY PRELIMINARY

1st screening 2nd screening

Attractiveness

R&D/specialized products

Synergies*

Feasibility

Willingness of the other party

Hankook Huvis Hyosung

Market share

*Includes group-level synergy

STRONG CEO BENCH 를 위한 주요 구성요소 – BEST

PRACTICE Top management

commitment

Performance ethics Capability development

Capability assessment

Upgrading talent pool

• Top management 가 People development 에 쏟는 시간 및 열정

• CEO 의 People development 에 대한 Skill

및 Will

• 명확하고 일관성 있는 Performance

ethics 에 대한 전사 차원의 공유• Performance ethics 를 실제 평가 ,

보상 시스템상에 반영

• Job rotation 을 통한 Capability

development

• Coaching 및 Training 등을 통한 Capability development

• 객관적이고 공정한 평가 기준을 통한 규칙적 Capability assessment

• Capability assessment 에 대한 규칙적이고 치밀한 Review

• “A player” 를 Attract, retain 할 수 있는 Value proposition

• 외부 인사 영입을 포함한 적극적인 “ A

player” 들의 영입• “C player” 의 지속적 퇴출

Pump configuration• 2 active• 1 redundant

Pump capacity : 150/pump

Pump cost : 133/pump

Total capacity :

3pumps 150= 450

Total cost :

3pumps 133= ~400

Benefits in reduced total cost— Lower total weight — Lower transport cost — Smaller building for pimping

station— Simplified piping — Fewer valves— Simplified cabling— Larger hoist (increased cost*)

Potential 3 pump design Current 4 pump design

Pump configuration• 2 active• 1 standby (for peak usage of

300)• 1 redundant

Pump capacity : 100/pump

Pump cost : 100/pump

Total capacity :

4pumps 100=400

Total cost :

4pumps 100=400

SUMMARY OF CRM ACTIVITIES TO DATE

Key activities

Key end products

Quality gate 1:

Project selection &

development

Quality gate 2:

Cost estimation &

proposal

development

Quality gate 3:

Contract and

negotiation

Marketing/Sales process

Quality gate 4:

Preparation for

execution

Quality gate 5:

Project execution

E P C

Quality gate 6:

Project closing

Execution process

Contract

Text Text

Text Text

Text

Te

xt

H

LL H

End of docume

nt

Project/risk

management

team

Reporting

Risk

management/Q

uality gates

Risk fighting Knowledge/

HR

0

100

200

300

400

500

600

700

0 50 100 150 200 250

TitleUnit of measure

Label 1

0

0

0

0

0

0

0

0

0

0

0

0

0

0

+65

-1.0

+4.4

-0.1

+43

-24

+4.4

-3.4

+25.4

-3.3

+148.2

-25.7

+181.5

-57.5

+43.1

-5.4

0

-2.6

+18.8

-9.2

+0.2

-0.5

+33.2

-1.2

+20.4

-79.1

+115.7

-98

+9.4

-6.3

+5.1

-2.9

+5.9

-9.9

+1.7

-0.5

+3.0

-2.5

0

-74.4

+25.1

-96.5

+48.5

-11.3

0

-9.8

+16.9

-24.1

+0.3

-0.9

+4.7

-12.9

148.2

-31.7

+218.6

-90.7

0

Urgent issues

(Phase one)

DHI

PRM 4.9%

ROIC 매출손실 100 억원

• 총 96 개의 프로젝트중 16 개의 프로젝트에서 100 억원의 매출 손실이 발생하였음

• 그 중 4 개의 프로젝트에서 79 억원의 손실이 발생 :

— Formosa (40 억 )

— Jana Manjung (19

억 )

— 부산 복합화력 (15

억 )

— Corpus Christi (5

억 )

xxxxx

Text

Hot spots

MAPS

수행조직 구성방향

추진일정계획 개요추진일정계획 개요

수행조직 구성방향 이건 경쟁사 (LG- 고속철도 ) 껍니다… .

위험관리 절차 및 방안

보고계획

도식화 타이틀 SAMPLE

수행조직 구성방향

수행조직 구성방향

수행조직 구성방향

수행조직 구성방향

수행조직 구성방향

수행조직 구성방향

수행조직 구성방향

수행조직 구성방향

수행조직 구성방향

수행조직 구성방향

수행조직 구성방향

수행조직 구성방향

수행조직 구성방향

수행조직 구성방향

VI. 사업관리 부문3. 사업관리 방안

3.1 사업관리 전략

수행조직 구성방향

SAMPLE(4) –

보고계획

Ⅳ. 사업관리부문행정자치부Ministry of GovernmentAdministration and Home Affairs

민원서비스 혁신 (G4C) 시스템 구축4. 사업관리 방안

☞ 제안서 Ⅳ -15~17

SAMPLE(1)

도식화 타이틀업무보고 일정

PAGE HEADING

119 종합정보시스템구축나 . 구축 전략

2. 사업 수행 전략

협력업체 활용전략협력업체 활용전략

SAMPLE(2)

Ⅳ. 사업관리 부문 3.보고 및 검토계획

3.3 보고계획

SAMPLE(3)

FW MF DF

2 3

1

1

2

3

4

1 2

3 4

121

2

3

4

56

11

8

7

9

10

High

Low

Old New