1. Identify the problem or necessity.
2. Search for information.
3. Design and construction.
4. Evaluation of what have been constructed.
Steps of technological process
Problem: Cross a river from one side to the other side
1.- Identify the problem
Additional problems:
◦ ¿Is it too deep to cross by feet?
◦ ¿Is there too much water stream or cold temperature to cross swimming?
1.- Identify the problem
Possible Solutions:
a) A boat or canoe b) A bridge
2.- Search for information
We look for information about different kind of bridges:
2.- Search for information
Girder bridge
Rope Bridge
Arc bridgeTriangulate
bridge
We look for information about different kind of bridges:
2.- Search for information
Cable-stayed bridge
Suspension Bridge
Drawing the plans (CAD tools):
3.- Design and Construction
Simulation tests (CAE tools):
3.- Design and Construction
Construction planning:
3.- Design and Construction
Load tests:
4.- Evaluation
Static test Dynamic Test
Tacoma Narrows Bridge
Tacoma Narrows Bridge First design by Clark Eldridge (11$ million).
Another design, by Leon Moisseiff, was chosen, reducing the total cost (8$ million).
Features:
◦ Total length of 1600 metres.
◦ Main span of 853 metres.
◦ The first one built using plate girders.
◦ Collapsed four months after its opening.VIDEO
Tacoma Narrows Bridge After its collapse, the new Tacoma
Narrows Bridge, built in 1950, replaced plate girders by adding trusses.
In 2007 it was open to the traffic new Tacoma Narrows Bridge.
Tacoma Narrows Bridge