Part VI
UMTS Planning with Atoll
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
2/100
Planning workflowBH trial configuration
UMTS project in Atoll
Propagation models
Equipment / Antennas
Sites / Transmitters / Cells
Prediction - Coverage by transmitter / Pilot signal level
Neighbours / Scrambling codes automatic allocationBH trial services definition
Atoll UMTS service parameters
Monte-Carlo simulation
Predictions - Ec/Io; Eb/No; Handoff status; Pilot pollution; SC Interference
Predictions - HSDPA / HSUPA
Point analysis tool
ACP Tool - Capesso
Contents
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
3/100
Planning Workflow
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
4/100
BH Trial Configuration
Planning only for Contorno region
Band = 2.1GHz
Bandwidth = 5MHz (1 Channel)
Orthogonality Factor: 0.6
Antenna = 18dBi / 65 Beamwidth / 4 Tilt (+ variable additional electrical downtilt)
Height: 30m
35 three-sectored sites (0 120 240)
Cable Loss: 2dB
Node B Noise Figure: 2dB
Node B Maximum Output Power: 43dBm
Pilot Power = 33dBm
SCH Power = 21dBm
Other CCH Power = 30dBm
Active Set Threshold: 5dB
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
5/100
Menu FileNew/ Project templates (UMTS HSPA)
Starting a Project
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
6/100
Define projection (e.g. WGS 84 / UTM zone 23S)
Define display coordinate system (e.g. Long/Lat - WGS 84) - depends on the map
Define power and length units (e.g. dBi, dBd / W, dBm / m, km)
Menu ToolsOptions
Projection / Units
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
7/100
Import clutter classes, DTM (Digital Terrain Model), vector data, etc
Menu File Import
Import Geographic Data Files
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
8/100
Clutter classes:
Import Geographic Data Files
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
9/100
Clutter classes:
Import Geographic Data Files
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
10/100
Heights (DTM = Digital Terrain Model):
Import Geographic Data Files
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
11/100
Import Geographic Data Files
Heights (DTM = Digital Terrain Model):
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
12/100
Vectors:
Import Geographic Data Files
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
13/100
Vectors:
Import Geographic Data Files
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
14/100
Clutter Classes + DTM + Vectors
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
15/100
Focus Zone Polygon
Explorer window
Geo tab
Zones
Focus Zone
Draw (or Import)
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
16/100
Computation Zone Polygon
Explorer window
Geo tab
Zones
Computation Zone
Draw (or Import)
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
17/100
Explorer window
Geo tab
Clutter Classes
Properties
Clutter Properties
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
18/100
Explorer window
Geo tab
Clutter Classes
Properties
Clutter Properties
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
19/100
Explorer window
Modules tab
Propagation Models
Propagation Models
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
20/100
Standard Propagation Model
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
21/100
Propagation Model Calibration
Import CW Measurements
Explorer windowData tabCW MeasurementsNew
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
22/100
Propagation Model Calibration
Displaying CW Measurements route
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
23/100
Propagation Model Calibration
Explorer windowModules tabPropagation ModelsStandard Propagation ModelAutomatic Calibration
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
24/100
Cost-Hata Model
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
25/100
Explorer windowData tabSitesEquipmentOpen Table
Site Equipment
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
26/100
Explorer windowData tabSitesEquipmentChannel Element Consumption
Channel Element Consumption
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
27/100
Site Creation
Explorer windowData tabSitesNew
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
28/100
Explorer windowData tabSitesOpen Table
Sites Table
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
29/100
Sites + Vectors + Focus Zone
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
30/100
Explorer windowData tabAntennas
Antennas
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
31/100
Antennas
Explorer windowData tabAntennas (any antenna) Properties
A
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
32/100
Antennas
Explorer windowData tabAntennas (any antenna) Properties
F B d
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
33/100
Explorer windowData tabFrequency Bands
Frequency Bands
T itt E i t
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
34/100
Explorer windowData tabTransmittersEquipment
Transmitter Equipment
BTS
TMA
Feeder
T itt C ti
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
35/100
Explorer windowData tabTransmittersNew
Transmitter Creation
T itt T bl
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
36/100
Explorer windowData tabTransmittersOpen Table
Transmitters Table
C ll C ti
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
37/100
Cell Creation
Explorer windowData tabTransmitters (any transmitter) Properties
C ll T bl
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
38/100
Cells Table
Explorer windowData tabTransmittersCellsOpen Table
P di ti
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
39/100
Explorer windowData tabPredictionsNew
Predictions
Dont need Monte-CarloSimulation (cell loads)
Need Monte-Carlo
Simulation (cell loads)
P di ti C b T itt
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
40/100
Explorer windowData tabPredictionsNewCoverage by Transmitter
Prediction - Coverage by Transmitter
P di ti Pil t Si l L l
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
41/100
Explorer windowData tabPredictionsNewCoverage by Signal Level
Prediction - Pilot Signal Level
Prediction Pilot Signal Le el
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
42/100
Prediction - Pilot Signal Level
Prediction Pilot Signal Level
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
43/100
Prediction - Pilot Signal Level
02.95.88.6
11.514.417.320.2
2325.928.831.734.6
37.440.343.246.1
49
-100
-99
-98
-97
-96
-95
-94
-93
-92
-91
-90
-89
-88
-87
-86
-85
-84
-83
-82
-81
-80
-79
-78
-77
-76
-75
-74
-73
-72
-71
-70
-69
-68
-67
-66
%
Best Signal Level (dBm)
06
1217232935
404652586369758186
9298
-100
-99
-98
-97
-96
-95
-94
-93
-92
-91
-90
-89
-88
-87
-86
-85
-84
-83
-82
-81
-80
-79
-78
-77
-76
-75
-74
-73
-72
-71
-70
-69
-68
-67
-66
-65
%
Best Signal Level (dBm)
CDF
Histogram
Explorer windowData tabPredictions (Coverage by Signal Level) Histogram
Neighbours Automatic Allocation
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
44/100
Explorer windowData tabTransmittersCellsNeighboursAutomatic Allocation
Neighbours Automatic Allocation
Neighbours Automatic Allocation
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
45/100
Neighbours Automatic Allocation
Scrambling Codes Automatic Allocation
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
46/100
Scrambling Codes Automatic Allocation
Explorer windowData tabTransmittersCells
Primary Scrambling CodesAutomatic Allocation
BH Trial Services Definition
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
47/100
BH Trial Services Definition
Voice: 12.2kbps
Video: 64kbps
HSDPA:
DL: 1Mbps (average)
UL: 256kbps (average)
HSUPA:
DL: 256kbps (average)
UL: 1Mbps (average)
BH Trial Services Definition
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
48/100
BH Trial Services Definition
UE Antenna Gain: 0dBi
UE Height: 1.5m
UE Noise Figure: 7dB
Body Loss = 3dB (for voice service only)
Active Set Size = 3
Ec/Io min = -14dB
UL DLVoice 12.2kbps 5dB 7dB
Video 64kbps 3dB 5dB
Required Eb/NoRAB
UL 12.2 21 1
DL 12.2 30 1
UL 64 21 4
DL 64 30 4
Maximum Power (dBm)RAB Data rate (kbps)
Video 64kbps
Required CE
Voice 12.2kbps
R99 Radio Bearers
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
49/100
Explorer windowData tabUMTS ParametersServicesR99 Radio Bearers
R99 Radio Bearers
Services
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
50/100
Explorer windowData tabUMTS ParametersServices
Services
Services
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
51/100
Explorer windowData tabUMTS ParametersServices
Services
Mobility Types
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
52/100
Explorer windowData tabUMTS ParametersMobility Types
Mobility Types
Eb/No per R99 Radio Bearer
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
53/100
Explorer windowData tabUMTS ParametersServices
R99 Radio Bearers (any radio bearer) Record Properties
Eb/No per R99 Radio Bearer
Terminals
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
54/100
Explorer windowData tabUMTS ParametersTerminals
Terminals
Voice / Video
Terminals
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
55/100
Explorer windowData tabUMTS ParametersTerminals
Terminals
HSDPA
Terminals
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
56/100
Explorer windowData tabUMTS ParametersTerminals
Terminals
HSUPA
User Profiles
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
57/100
Explorer windowData tabUMTS ParametersUser Profiles
User Profiles
Environments
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
58/100
Explorer windowData tabUMTS ParametersEnvironments
Environments
Traffic Map
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
59/100
Explorer windowGeo tabTrafficNew MapCreate Map
(Map Bases On Environments - Raster)
Traffic Map
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
60/100
UMTS Simulations (Monte-Carlo)
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
61/100
UMTS Simulations (Monte Carlo)
UMTS Simulations (Monte-Carlo)
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
62/100
UMTS Simulations (Monte Carlo)R99 Portion:
1) Best server determination: The best server is determined for each mobile using Ec/Io criterion. The
mobile is rejected if the Ec/Io condition is not satisfied or the uplink load factor is higher than the specified
limit (Ec/Io pilot < Ec/Io min pilot; Admission rejected)
2) Active set determination: The active set is determined for each mobile.
3) Uplink power control: The mobile transmit power is calculated. It corresponds to the power requiredto satisfy the uplink Eb/Nt requirement. The mobile is rejected if the calculated required transmit power is
higher than the maximum mobile transmit power (Pmob >Pmob max)
4) Downlink power control: The transmitter traffic channel power is calculated. It corresponds to the
power required to satisfy the downlink Eb/Nt requirement. The mobile is rejected if the calculated traffic
channel power is higher than the maximum traffic channel power allowed (Ptch > Ptch max)
5) Uplink and downlink interference update: The uplink load factor and total downlink transmit power are
updated with these results.
6) Congestion and radio resource control: Mobiles are rejected if any of the following situations occur:
- Uplink load factor higher than the specified limit
(UL load saturation)- Total downlink power higher than the maximum total downlink power (DL load saturation)
- Number of OVSF codes insufficient (Code saturation)
- Number of channel elements available insufficient (Channel element saturation)
7) Convergence study: The previous iterations are repeated until the simulation converges, i.e. either
the maximum number of iterations is reached or both, uplink and downlink, criteria are verified.
Users Distribution
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
63/100
Users Distribution
UMTS Simulation Results
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
64/100
Explorer window Data tab UMTS Simulations (any simulation) Properties
UMTS Simulation Results
UMTS Simulation Results
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
65/100
UMTS Simulation Results
Average Simulation
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
66/100
Explorer window Data tab UMTS Simulations (any simulation) Average Simulation
Average Simulation
Average Simulation
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
67/100
Average Simulation
Sites
- Max No. of DL and UL CEs
- No. of DL and UL CEs Used
- No. of DL and UL CEs Due to SHO Overhead
- Carrier Selection- Downlink and Uplink Overhead CEs/Cell
- AS Restricted to Neighbours
- Rake Factor
- MUD Factor
- Compressed Mode- Instantaneous HSDPA Rate (kbps)
- Instantaneous HSDPA MAC Throughput (kbps)
- HSUPA Rate (kbps)
- DL and UL Throughput for Each Service
Average Simulation
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
68/100
Average Simulation
Cells
- Max Power (dBm)
- Pilot Power (dBm)
- SCH power (dBm)
- Other CCH power (dBm)
- Available HSDPA Power (dBm)
- AS Threshold (dB)- Gain (dBi)
- Reception Loss (dB)
- Transmission Loss (dB)
- BTS Noise Figure (dB)
- Total Transmitted R99 Power (dBm)- Total Transmitted Power (dBm)
- UL Total Noise (dBm)
- Max UL Load Factor (%)
- Max DL Load (% Pmax)
- UL Load Factor (%)
- UL Load Factor due to HSUPA (%)
- DL Load Factor (%)
- UL and DL Noise Rise (dB)
- DL R99 Load (% Pmax)
- Reuse Factor (UL)
- Reuse Efficiency Factor (UL)
- Number of UL and DL Radio Links
- Connection Success Rate (%)
- HSDPA Application Throughput (kbps)
- Min. HSDPA RLC Peak Rate (kbps)
- Max HSDPA RLC Peak Rate (kbps)
- Avg. Instantaneous HSDPA Throughput (kbps)
- Instantaneous HSDPA Rate (kbps)
- Instantaneous HSDPA MAC Throughput (kbps)
- No. of Simultaneous HSDPA Users
- No. of HSDPA Users
- No. of HSUPA Users- HSUPA Application Throughput (kbps)
- HSUPA UL Load Factor (%)
- No. of Codes (512 Bits)
- The types of handover as a percentage
- R99 UL and DL Throughput (kbps)
- R99 UL and DL Throughput Without HO (kbps)
- Min TCH Pwr (dBm)
- Max TCH Pwr (dBm)
- Avg TCH Pwr
- Rejected users
Trial Simulation Results
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
69/100
Trial Simulation Results
Service Users DL Rate (R99) UL Rate (R99)
Voice 12.2kbps 1,288.12 7.87 Mbps 7.87 Mbps
Video 64kbps 130.23 8.33 Mbps 8.33 Mbps
HSDPA 33.64 - 2.15 MbpsHSUPA 16.82 - -
Request1468.81 users trying to connect
Service Users DL Rate (R99) UL Rate (R99)
Voice 12.2kbps 1277.16 (99.1%) 7.8 Mbps 7.8 Mbps
Video 64kbps 127.95 (98.2%) 8.19 Mbps 8.19 Mbps
HSDPA 31.26 (92.9%) - 2 Mbps
HSUPA 15.57 (92.6%) - -
Result
1451.94 (98.9%) connected to a R99 RAB
Service Rate
HSDPA 56.86 Mbps
HSUPA 11.39 Mbps
HSDPA / HSUPA
Trial Simulation Results
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
70/100
a S u at o esu ts
Pmob > PmobMax: 0Ptch > PtchMax: 3.99
Ec/Io < (Ec/Io)min: 10.9
UL Load Saturation: 0.01
Ch. Elts saturation: 0DL Load Saturation: 0
Multiple causes: 0
Code saturation: 0
Admission rejection: 1.96
HSDPA Delayed: 10.9
HSDPA Scheduler Saturation: 0
HSUPA Scheduler Saturation: 0
Reasons
27.76 (1.9%) user rejected or delayed
Result
Predictions
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
71/100
Need Monte-Carlo
Simulation (cell loads)
Prediction - Ec/Io - Voice
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
72/100
Explorer windowData tabPredictionsNewPilot Reception Analysis (Ec/Io)
Prediction - Eb/No (DL) - Voice
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
73/100
( )
Explorer windowData tabPredictionsNewService Area (Eb/Nt) Downlink
Prediction - Eb/No (UL) - Voice
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
74/100
( )
Explorer windowData tabPredictionsNewService Area (Eb/Nt) Uplink
Prediction - Effective Service Area - Voice
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
75/100
Explorer windowData tabPredictionsNewEffective Service Area
Prediction - Handoff Status - Voice
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
76/100
Explorer windowData tabPredictionsNewHandoff Status
No Handoff 67.8
Softer 5.2
Soft 18.4Softer-Softer 0
Softer-Soft 4.2
Soft-Soft 4.2
% areaHandoff Status - Voice
Prediction - Pilot Pollution - Voice
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
77/100
Explorer windowData tabPredictionsNewPilot Pollution
Prediction - SC Interference Zones
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
78/100
Explorer windowData tabPredictionsNewScrambling Codes Interference Zones
Prediction - HSDPA App Throughput
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
79/100
pp g p
Explorer windowData tabPredictionsNewHSDPA Coverage
Prediction - HSUPA App Throughput
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
80/100
pp g p
Explorer windowData tabPredictionsNewHSUPA Coverage
Point Analysis Tool
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
81/100
y Profile Tab
Point Analysis Tool
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
82/100
Reception Tab
Point Analysis Tool
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
83/100
AS Analysis
Transmitters of themobile active set(grey zone)65
Best server thresholdto be part of theactive set (dependingon the mobility type)
Lower limit of theactive set (best pilotquality - Active setthreshold)
Pilot and serviceavailability in ULand DL
Summary - Building a UMTS Project
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
84/100
1) Define projection / import geographic data files
2) Network design: sites / transmitters / cells
3) Calibrate propagation model using CW measurements
4) Pilot studies based only on signal reception
5) Neighbour / scrambling codes allocation
6) Traffic description (activity probabilities), traffic map design
7) Simulations - realistic user distribution generation
8) Coverage and point prediction studies
Automatic Cell Planning Tool - Capesso
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
85/100
Site Location
Greenfield site deployment for new areas
Vector + area deployment
Site Location
Greenfield site deployment for new areas
Vector + area deployment
Site Selection
Site selection + RF configuration for UMTS overlay on GSM
Automatic efficiency analysis
Site Selection
Site selection + RF configuration for UMTS overlay on GSM
Automatic efficiency analysis
Better Plans
Parameter configurations to improve network designs, plans
Highly efficient what if analysis
Better Plans
Parameter configurations to improve network designs, plans
Highly efficient what if analysis
Capesso - Greenfield
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
86/100
Greenfield data in ATOLL Automatic site location in ATOLL
Best site deployment: number of sites, location, az, tilt, etc.
Very large areas in a few minutes (>350km2 in less than 10min)
Both area deployment and vector deployment supported
Full verification of results and further processing in ATOLL
Best site deployment: number of sites, location, az, tilt, etc.
Very large areas in a few minutes (>350km2 in less than 10min)Both area deployment and vector deployment supported
Full verification of results and further processing in ATOLL
Greenfield: Site location for all radio technologies
Capesso - Greenfield
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
87/100
Capesso - Greenfield
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
88/100
Capesso - Greenfield
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
89/100
Manual Planning (35 Sites) Capesso Greenfield (36 Sites)
36 site(s) have been created in 76.672 sec (2.130 sec/site).
976 location(s) have been analyzed in 76.672 sec (0.078557 sec/loc).
Capesso - Greenfield
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
90/100
Manual Planning (35 Sites) Capesso Greenfield (36 Sites)
Capesso - Optimization
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
91/100
Capesso - Parameter Ranges
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
92/100
Capesso - Targets
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
93/100
Capesso - Optimization Options
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
94/100
Capesso
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
95/100
Capesso
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
96/100
Capesso - Analyzing Changes
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
97/100
Capesso - Analyzing Results in Atoll
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
98/100
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
99/100
Questions ?
8/3/2019 UMTS Training - Part VI - UMTS Planning With Atoll
100/100