TRANSNET PORT TERMINALS - STAYING AHEAD OF THE COMPETITION
ZEPH NDLOVU – GM: KZN OPERATIONS 1 JULY 2014
We are Transnet Port Terminals on social media
PAGE
WORLD ECONOMIC SITUATION
TABLE OF CONTENTS
1
REGIONAL ECONOMIC GROWTH PROSPECTS
SA PORTS AND REGIONAL INTEGRATION
PORT DEVELOPMENT
FUTURE PLANS
PAGE
WORLD ECONOMIC SITUATION AND SEABORNE TRADE TRENDS
• >90% of world merchandise trade is carried by sea
• Industrial production world GDP, merchandise trade and seaborne shipments continue to move in tandem.
• With demand for shipping services being “derived”, the performance of maritime transportation and seaborne trade is largely determined by developments in the world economy and international trade.
• Developing countries are
playing a bigger role globally as well as regionally, with deeper South–South linkages and trade integration.
The OECD industrial production index and indices for world GDP, merchandise trade and seaborne shipments (1975–2013), (1990 = 100)
Source: UNCTAD secretariat
2
PAGE
GLOBAL TRADE DRIVES CONTAINERISATION
• > over 50% of the world merchandise trade volume is containerised.
• Asia handles more than 60% of the global container trade (had +/-48% - 49% share in 1994).
• Container penetration in developing nations such as India, Africa, Latin America is expected to continue to grow.
• Container volumes handled by Transnet Port Terminals grew by an average of 6% between 2004 and 2013 while the South African GDP grew by an average of 3.3%.
Global container trade, 1996–2013 (Millions of TEUs and percentage annual change)
Source: Based on Drewry Shipping Consultants
3
PAGE
AFRICA POISED FOR ACCELERATED ECONOMIC GROWTH
• Africa has about 20% of the world’s land mass and 16% of its population, but only 2.5% of its GDP.
• A key driver of Africa’s growth has been its richness in natural resources.
• Africa’s population is the other major driver of growth.
• Population projected to increase from 1bn in 2010 to about 1.8bn in 2040.
• 8 African countries among the world’s 20 fastest-growing countries (World Bank)
Historical and forecast population in Africa
Source: United Nations (2011)
4
PAGE 5
Challenges facing African Ports
Monrovia (Liberia)
Lome (Togo)
Port Louis (Mauritius)
Toamasina (Madagascar)
Takoradi (Ghana)
Abidjan (Côte d'Ivoire)
Lagos (Nigeria)
Cotonou (Benin)
Walvis Bay (Namibia)
Tema (Ghana)
Cape Town (SA)
Dar es Salaam (Tanzania)
Tanga (Tanzania)
Mombasa (Kenya)
Nacala (Mozambique) Beira
(Mozambique)
Maputo (Mozambique)
Richards Bay (SA)
Durban (SA)
East London (SA) Ngqura (SA)
Libreville (Gabon)
Pointe Noire Matadi (Congo)
Douala (Cameroon)
Source: Team analysis
Port Elizabeth (SA)
Lobito (Angola)
Luanda (Angola)
Algiers (Algeria)
Port Said (Egypt)
PAGE
• South Africa is distant from its key trading partners
• Maritime transport costs is a significant component of total transport costs
• South Africa is strategically placed to service Southern African, Asian and South American
trade routes
• SA can establish itself as a global transhipment hub focused on certain trade routes
Intensity of global shipping
ECONOMIC SIGNIFICANCE OF OUR PORTS
6
Length of SA Coastline = 2 798km
PAGE
SOUTHERN HUB FOR WORLD SHIPPING ROUTES
The position of South Africa’s ports system enables it to access to South-South trade, Far East trade, Europe & USA, East & West Africa regional trade
7
Shortest Trade Route between Shanghai and Santos is via South Africa 11,270nm = 22 days @ 21 knots via Panama Canal13,130nm = 26 days + transit fee via Suez Canal 13,590nm = 27 days + transit fee
PAGE
8
Notteboom, Theo E. "Shibboleth Authentication Request." Sciencedirect.com. ScienceDirect, May 2012. Web. 10 Mar. 2014. University of Illinois: Illinois Business Consulting, March 2014
Over 368 million tonnes pass through the Suez Canal vs 6.46 million tonnes through Ngqura annually
PAGE
9 Notteboom, Theo E. "Shibboleth Authentication Request." Sciencedirect.com. ScienceDirect, May 2012. Web. 10 Mar. 2014. University of Illinois: Illinois Business Consulting, March 2014
Criteria analyzed in the comparison between Cape and Suez routes
Criteria Analysis
Dimensions of Criteria Via Suez Route Via Cape Route
Distance -Distance in nautical miles E.g. Singapore to Buenos Aires
Less favorable at 12,292 nm
More favorable at 9,336 nm
Transit Time
-Sailing times -Dwell time at interlining terminal -Canal transit time -Delays E.g. Singapore to Buenos Aires
33 days
26 days
Cost
-Handling rates at interlining terminal -Ship operating costs -Canal transit fees -Port dues
Lower due to vessel size provides economy of scale
Higher
Other factors -Piracy attack/Political turbulence Rising Few
-Capacity Full Under-utilized
PAGE
10
• High port fees and taxes can affect the economic viability of stopping at a port
Port Fees & Taxes
• The amount of time it takes for cargo to clear customs has an impact of time sensitive goods
Customs Efficiency
• If ports are highly congested, SSS is not viable
• Post-port logistics can impede traffic growth if infrastructure issues persist
Capacity to Handle Traffic
• Ports with low berth depths or shorter wharf lengths can impede the use of larger ships
Port Specifications
Factors which affect the economic viability of stopping at a port
University of Illinois: Illinois Business Consulting, March 2014
PAGE
11
• Ports with no expansion plans in place to meet future demand could create bottlenecks and need to be critically evaluated
Expansion Plans
• Countries imposing special import tariffs to correct trade imbalances could have potentially drastic consequences for a new shipping line
Trade Imbalances
• Being a government-linked organization, pirate attacks could snowball into larger issues Pirates
• Lines operating in countries undergoing political changes could face dire consequences if caught at the wrong time and the wrong place
Political Instability
"Port of Cotonou, Benin." Bollore Africa Logistics. Bollore Africa Logistics, n.d. Web. 11 Mar 2014. United States. Federal Research Division. Country Profile: Kenya. Washington, DC: , 2007. Web. University of Illinois: Illinois Business Consulting March 2014
Geo-economic factors affecting port viability
PAGE
THE ROLE OF TRANSNET IN PORT DEVELOPMENT
12 12
"Regional and continental infrastructure development is of fundamental importance to the realisation of Africa’s economic growth and development imperatives. As regional leaders, we carry a particular responsibility to serve as champions in driving industrial and infrastructure development both at the regional and continental levels.“ Jacob G Zuma, President of the Republic of South Africa and Chairman of the Committee of Heads of State of the Programme for Infrastructure Development in Africa (PIDA)
PAGE
TRANSNET STATE OWNED COMPANY LTD - OPERATIONAL DIVISIONS
• 16 Cargo Terminals operating across 7 SA ports
• Revenue 7 bn
• Assets R12.3 bn
• 6 210 employees
Supporting
13
• 8 Commercial ports along 2 943km of coastline
• Revenue R8.4bn
• Assets R60.6 bn
• 3 420 employees
• 20 500 km of railway track
• 182 million tons of freight
• General freight & 2 heavy haul export lines
• Revenue 27.6 bn
• Assets R61.3 bn
• 26 850 employees
• Support TFR for rolling stock and TPT for lifting equipment maintenance
• Revenue 11.2 bn
• Assets R7.6 bn
• 12 570 employees
• 18 billion litres of petroleum products and gas through 3 000 km of pipelines, mainly to Gauteng
• Revenue 2.1 bn
• Assets R19.3 bn
• 630 employees
• R300 billion of capital investments over 7 years
• CSI in Education, Health, Sport, Arts & Agriculture
• Property Management
• Transnet Schools
Capital Projects Transnet
Foundation Property Schools
Transnet Pipelines
(TPL)
Transnet Engineerin
g(TE)
Transnet Freight
Rail (TFR)
Transnet Port
Terminals (TPT)
Transnet National
Ports Authority (TNPA)
Pipelines Rail Ports
PAGE
Africa Strategy Ports
Rail
Pipelines
• PMAESA; • Promote SA as a regional hub for Africa; • Port pairing initiatives/Port co-operative
agreements; • Regional port plan to support SA’s hub
port; • Transnet to assist Regional ports to
develop their ports master plans, dredging;
• Maritime School of Excellence for marine training programmes
• Focus on increasing cross border volumes; • Review our approach to rail concession
agreements; • Maintenance services to the regional
market on Loco’s/wagons and port equipment;
• Sale of wagons and Loco’s; • Rail operations;
Regional Integration
• Advisory services given our technical competency
• Opportunities to operate and/or construct pipelines
• Review our role in the development of the North - South corridor;
• Africa conference (Port/Rail/Pipeline);
• MOU’s between African countries ;
• Training/Skills development;
Visible presence
Contribution in developing other African ports
14
PAGE
OVERVIEW
15
• Transnet Port Terminals provides cargo handling services at 16 terminal facilities in seven ports to a wide range of customers including shipping lines, freight forwarders and cargo owners.
• Operations are in containers, bulk, break-bulk and automotives.
• We invest in state-of-the-art cargo handling equipment (ship-to-shore cranes, straddle carriers, rubber-tyre gantries, tipplers, conveyors) and manage the logistics interface with inbound and outbound rail and trucking carriers.
• We are proud of the implementation of the NAVIS-terminal operating system and the certification of all our terminals to ISO standards.
• Transnet Port Terminals is Africa’s biggest container terminal operator in terms of volumes handled.
In line with Transnet’s new market demand strategy (MDS) and related investments, Transnet’s Port Terminals are currently expanding in response to growing business in the country. Expansion includes creating storage capacity, the replacement of old equipment and upgrading of software.
TRANSNET PORT TERMINALS
PAGE
Transnet’s Integrated Network is Underpinned by a Limited Number of Key Corridors
7. Saldanha Bulk (Export iron
ore), Breakbulk
6. Cape Town
Containers, Breakbulk
4. Ngqura Containers
3. East London Containers, Breakbulk, Agri-Bulk, Automotives
1. Richards Bay Bulk (Export coal, magnetite, Chrome), Breakbulk
2. Durban Containers, Breakbulk, Agri-Bulk, Automotives
5. Port Elizabeth Containers, Breakbulk, Bulk, Automotives WESTERN CAPE PORTS
EASTERN CAPE PORTS
KZN PORTS
In 2012/13 TPT handled: 4.24 Million Containers 75.3 Million Tons of Bulk Cargo 9.9 Million Tons of Break-Bulk 674 Thousand New Automotives
TRANSNET PORT TERMINALS OPERATES A COMPLIMENTARY PORT SYSTEM
16
PAGE 17
A ship in the harbour is safe, but that's not what ships are built for.
William Shedd
17
PAGE
• Transnet’s Market Demand Strategy (MDS) will see R300bn spent over the next seven years to create freight capacity before demand across rail and ports infrastructure and equipment in South Africa.
• Of this amount, TPT is poised to spend R30bn and TNPA R47bn to boost port operations and facilitate unconstrained growth. The MDS sets out how Transnet intends to grow revenues and business from its operation over the next seven years.
• Never before has any company invested so aggressively in creating capacity ahead of demand on the African continent.
18
INFRASTRUCTURE DEVELOPMENT
PAGE
19 Source: Africa Team analysis
Market Demand Strategy - 2013 to 2020
• R300bn Transnet-wide capital investment programme
over next 7-years
• Expanding rail, port and pipeline infrastructure
• Increase in capacity to meet market demand
• Continued financial stability and strength
• Significant productivity and operational efficiency
improvements
• Shift from road to rail – reducing the cost of doing
business and carbon emissions
• Enabling economic growth
• Job creation, skills development, localisation,
empowerment and transformation opportunities
• TPT will invest R30bn
Divisional split (Rbn)
11
30
47
4
201 4
Other
TPL
TPT
TNPA
TRE
TFR
Other
Commodity Split (Rbn)
30
26
3 9
24
25
32
151
Other Bulk
Break Bulk Piped Products
Containers (Ports)
Export Iron Ore
Export Coal
GFB
PAGE
20 Source: Africa Team analysis
Market Demand Strategy - MDS INVESTMENTS FOR TPT Port View, Replacement Vs Expansion, Infra Vs Equipment
Civil / Infrastructure vs
Cargo Handling Equipment
TPT 7-year Capex Programme (R30bn):
TPT Year 1 (2013/14) Forecasted spend (R 1,859m): Infra vs. Equipment, Port View, Replacement vs. Expansion
Cargo Handling Equipment R 1,369m (74%)
Civil / Infrastructure R 489m (26%)
RBY R 550m (30%)
DBN R 513m (28%)
NGQURA R 528m (28%)
SLD R 116m (6%)
CTN R 106m (6%)
PE / EL R 45m (2%)
Port View
Replacement vs. Expansion
Total ETC
7 Year Plan
Year 1
2013/14
Year 2
2014/15
Year 3
2015/16
Year 4
2016/17
Year 5
2017/18
Year 6
2018/19
Year 7
2019/20
TPT 29 677 1 859 2 827 4 772 5 496 5 247 5 241 4 235
Rbn
Expansion R 789m (43%)
Replacement R 1,069m (57%)
PAGE
TPT 10-YR CAPEX HISTORY (Rm) Investment climbed from R131m in 2001/02, peaking at R3.2bn in 2008/09
TPT Investment (R2,363m) (5 years: 2001/02 to 2005/06)
TPT Investment (R10,277m) (5 years: 2006/07 to 2010/11)
2004/05
2003/04
2002/03
2001/02
2005/06
2009/10
2008/09
2007/08
2006/07
2010/11
Port concessioning
dilemma
Infrastructure backlog catchup & expansion drive
Global recession & investment
cutbacks
21
7
2012/13
2011/12
2010/11
2008/09
2013/14
2017/18
2016/17
2015/16
2014/15
2018/19
3200 2337 913 1137 2551 1859 3492 7670
9545
2812 2670
2009/10
Boom-time Ends
Global recession Market Demand Strategy
TPT R30bn 7yr Investment Plan
PAGE
IMPACT ON JOB CREATION
22
MDS is expected to create 15,000 direct and up to 588,000 indirect job opportunities across the economy
PAGE
• The Port of Durban is undergoing a multi-year project to ramp up of capacity ahead of projected demand.
• Planned extension of the Pier 1 terminal into Salisbury Island will increase current capacity from 700,000 TEUs to a potential 1.3-million TEUs by 2016.
• Pier 2 capacity is to be increased from 2.1 million TEUs in 2011/12 to 2.5 million TEUs by 2013/14 and 3.3 million TEUs by 2017/18.
• Berths 203, 204 and 205 on DCT’s North Quay is currently being taken out of service one at a time to undergo deepening and refurbishment over a 74 month period which started in June 2012.
• Container capacity is also being created in other niche terminals such as the Durban RO-RO and Maydon Wharf Terminal (a predominantly break-bulk and RORO facility, with specialised capacity to handle containers), through the acquisition of new equipment, such as mobile cranes, and various infrastructure upgrades to deal with the container traffic diverted from DCT during the capacity upgrade.
23
CAPACITY AHEAD OF DEMAND
PAGE
Automotive Terminal
24
PAGE 25
THE AU HAS IDENTIFIED 14 CORRIDORS AS THE MAIN AFRICAN CORRIDORS THAT NEEDS DEVELOPMENT
1 Kenitra-Casablanca Corridor
2 Greater Cairo Region
3 The Dakar-Touba corridor (Touba-Mbackѐ)
4 The Greater Ibadan-Lagos-Accra (GILA) urban corridor
5 The great Haoussa-Yoruba-Anshanti city triangle (GHAYA-CT)
6 The Emerging Luanda-N’Djamena corridor
7 The Kampala-Entebbe corridor
8 Nairobi metropolitan region
9 Walvis Bay corridor
10 North South corridor (Cape Town-Johannesburg-Harare-Lusaka-Dar es Salaam)
11 The Maputo-Gauteng development corridor
12 Durban development corridor
13 Beira corridor
14 Maputo-Limpopo corridor
Source:E&Y Report – Time for Africa
3
4
2
13
10
12
11 14
9
6
5
7
8 6
6
PAGE 26
THE SA GOVERNMENT HAS DEVELOPED 18 STRATEGIC INTEGRATED PROJECTS (SIPS)
Unlocking the northern mineral belt with Waterberg as the catalyst
SIP5
SIP2
SIP3
SIP4
SIP1
SIP6
SIP7
SIP8
SIP9
Durban-Free State-Gauteng logistics and industrial corridor
South-Eastern node & corridor development
Unlocking the economic opportunities in North West Province
Saldanha-Northern Cape development corridor
Integrated municipal infrastructure project
Integrated urban space and public transport programme Green energy in support of the South African economy Electricity generation to support socioeconomic development
PAGE 27
THE SA GOVERNMENT HAS DEVELOPED 18 STRATEGIC INTEGRATED PROJECTS (SIPS)
Agri-logistics and rural Infrastructure
SIP1
5
SIP12
SIP1
3
SIP1
4
SIP1
1
SIP16
SIP17
SIP18
SIP10
Revitalisation of public hospitals and other health facilities
National school build programme
Higher education infrastructure
Expanding access to communication technology
SKA & Meerkat
Regional integration for African cooperation and development
Water and sanitation infrastructure
Electricity transmission and distribution for all
PAGE 28
10 NEW 18,000 TEU SHIPS ORDERED BY MAERSK - To be delivered over next 3 years
DBN EL PE CPT Ngqura
• Only Cape Town and Ngqura
can handle fully laden 4th
generation vessels
• Only Ngqura can handle 5th
generation vessels
• The average size of vessels
on order is currently 5,310
TEU
Draft 11.9m 10.2m 11.7m 13.8m 16.5m
PAGE
A New Port is required to handle these latest Generation Vessels…
29
PAGE
Port of Durban
Container Terminals
New Dig-Out Port
Automotive Terminal
Liquid Bulk Terminal
Breakwater and Entrance Channel
30
PORT OF NGQURA DURBAN MPT TERMINALS – POINT RORO
FUTURE PLANS FOR DURBAN - Artist’s View of the new Dig-Out Port at ex-DIA Site
PAGE
DURBAN DIG OUT PORT - SUMMARY
31
STATISTICS • 800 hectares of land to be acquired • 70 million m3 of material to be dredged • 3,5 million tonnes of rock • 2,5 million m3 of cement • 52 000 tonnes of reinforcing steel • 14,5 million m3 earthworks
VISION: • Largest container port in Africa • World-class port in terms of efficiency • World-class supply chain • Leading-edge “green” port • “Community” port • State-of-the-art security
EXPECTED BENEFITS • Expected Capex Impact on GDP of R48 billion • Expected Operational Impact on GDP of R56 billion (per annum at full operation). • Income/wages generation during construction – KZN impact – estimated at R24 billion • Expected to create approximately 64 000 construction jobs • Expected to create approximately 28 000 operational jobs • Reduced total logistics cost
PAGE
CONCLUDING REMARKS
32
• Future freight transport demand in Africa is tied to growth in international trade.
• As ports would be increasingly challenged by intensified traffic, greater ship size and transhipment growth, ports capacity may have to be expanded in the future.
• Ultimately, all countries can benefit from a fully developed transport infrastructure in Africa.
• Greater collaboration will be key in optimising the entire logistics supply chain.
• Infrastructure development is one of the key drivers of the New Growth Path, Transnet has an important role to play in this new journey.
20 THANK YOU