0 2012-12-21
Ing. Marco Pirozzo Test engineer
Ing. Giovanni Bellenda Head of Photovoltaics and Solar Thermal Testing Div.
Revision n° Data of issue: Tested by: Approved by:
TEST REPORT EN 12976-2: 2006: Thermal solar systems and components - Factory made systems - Part 2: Test methods
EN 12976-2: 2006: Sistemi e componenti solari termi ci – Sistemi prefabbricati – Parte 2: Metodi di pro va
Report Reference No ./ Numero rapporto .. : M1.12.NRG.0596/48731 Date of issue / Data di emissione ................ : 2012-12-21
Total number of pages / N° tot. di pagine .... : 16
Testing Laboratory / Laboratorio di prova .. : Eurofins – Modulo Uno S.p.A.
Address / Indirizzo .................................. : Strada Savonesa, 9 - 15050 Rivalta Scrivia (AL) – Italy
Applicant’s name / Nome del richiedente ... : ICIM S.p.A.
Address / Indirizzo .................................. : Piazza Don Enrico Mapelli, 75 - 20099 Sesto San Giovanni (MI) - Italy
Test specification / Specifiche di prova
Standard / Norma ................................... : EN 12976-2:2006 - cl. 5.8 Non-standard test method .................. : Metodo di prova non standard
N/A
Scope of the test / Scopo della prova Thermal performance characterization by means of whole system testing Caratterizzazione della prestazione termica mediante prove sull’intero sistema
Test item description ........................ :
Descrizione dell’oggetto in prova Factory made solar heating system: thermo-siphon system for domestic hot water preparation Sistema di riscaldamento solare prefabbricato: sistema a termosifone per la preparazione dell’acqua calda ad uso domestico
Trade Mark ......................................... :
Marchio
Manufacturer / Costruttore .................. :
Address / Indirizzo .................................. :
SOLIMPEKS SOLAR CORP.
Fevzi Cakmak Mah. 10753 Sok. No:3 Karatay - 42050 KONYA -TURKEY
Model/Type reference / Modello ............. : TSM 300 L
System classification .......................... : Classificazione del sistema
• System type / Tipo di sistema : Solar only • Flow principle / Principio flusso: Thermo-siphon / Termosifone • Heat transfer principle /Scambio di calore: Indirect / indiretto • Pressure principle / Principio pressione: Closed / Chiuso • Drain principle / Principio di svuotamento: Filled / A riempimento • Storage location / Posizione serbatoio: Outdoor / All’esterno • Integrated back-up / Ausiliari intergrati: None / nessuno
Date of receipt of the test item ............ : Data di ricevimento dell’oggetto in prova
2012/09/30
Testing period / Periodo di prova ................ : 2012/11/05 ÷ 2012/12/07
This publication may be reproduced in whole or in part for non-commercial purposes as long as Eurofins Modulo Uno S.p.A. is acknowledged as copyright owner and source of the material and only with the written permission. Eurofins Modulo Uno S.p.A. takes no responsibility for and will not assume liability for damages resulting from the reader's interpretation of the reproduced material due to its placement and context.
Questa pubblicazione può essere riprodotta per intero o parzialmente per scopi non commerciali a condizione che Eurofins Modulo Uno S.p.A. sia riconoscibile come proprietaria dei diritti d’autore e fonte del materiale e solo con autorizzazione scritta. Eurofins Modulo Uno S.p.A. non assume alcuna responsabilità per danni derivanti dall’interpretazione del lettore
del materiale riprodotto al di fuori del suo contesto.
Test Report n° M1.12.NRG.0596/48731 Pag. 2 of 15
Summary / Sommario
GENERAL INFORMATION / INFORMAZIONI GENERALI __________________________________________ 3
Description of test item construction / Descrizione della costruzione dell’oggetto in prova ___________________ 4
Test summary statement / Attestazione di prova _____________________________________ 10
TAB. 1A: Thermal performance characterization – TESTING SUMMARY /Caratterizzazione delle prestazioni
termiche – Sommario delle prove ____________________________________________________________ 11
TAB. 1B: Long Term Performance Prediction – Design load /Predizione delle prestazioni sul lungo termine – Carico di progetto
_____________________________________________________________________________ 12
TAB. 1C: System performance indicators / Indicatori delle prestazioni di sistema ______________________ 13
TAB. 1D: Long Term Performance Prediction – GRAPHS /Predizione delle prestazioni sul lungo termine - GRAFICI __ 14
TAB. 2: Final inspection (dismantling) / Ispezione finale (smontaggio)______________________________ 15
Test Report n° M1.12.NRG.0596/48731 Pag. 3 of 15
GENERAL INFORMATION / INFORMAZIONI GENERALI
General remarks / Note generali :
• The test results presented in this report relate only to the object tested. I risultati esposti in questo rapporto di prova si riferiscono esclusivamente all’oggetto testato.
• This report shall not be reproduced, except in full, without the written approval of the issuing testing laboratory.
Questo rapporto non può essere riprodotto, se non integralmente, senza l’autorizzazione scritta del laboratorio di prova che lo rilascia. • "(see annex #)" refers to additional information appended to the report.
“(vedi allegato #)” è un riferimento ad informazioni aggiuntive annesse al rapporto • "(see tab. #)" refers to a table appended to the report.
“(vedi tab.#)” è un riferimento ad una tabella annessa al rapporto
• Throughout this report a comma (point) is used as the decimal separator. In questo rapporto di prova il punto è utilizzato come separatore decimale
Testing location(s):
Sito(i) di prova
Eurofins - Modulo Uno S.p.A.
Strada Comunale Savonesa, 9 15050 Rivalta Scrivia (AL) – Italy Tel. +39 011 2222225 Fax +39 011 2222226 e-mail: ProductTesting-IT@eurofins.com web: www.product-testing.eurofins.com Latitude / Latitudine: 44° 52’ N Longitude / Longitudine: 08° 48’ E
Tests performed (name of test and test clause) ........................ : Prove eseguite (nome ed articolo del test)
EN 12976-2 - All clauses / Tutti gli articoli
Possible test case verdicts / Esiti di prova possibili :
- test case does not apply to the test object / il caso non è applicabile all’oggetto in prova ............... : N/A
- test object does meet the requirement / l’oggetto in prova rispetta il requisito .............................. : Pass (P)
- test object does not meet the requirement / l’oggetto in prova non rispetta il requisito ................... : Fail (F)
Abbreviations used in this report / Abbreviazioni usate in questo rapporto :
Manufacturer’s Specification / Specifica fornita dal costruttore ...................................................... : MS
Equipment under Test / Oggetto in prova ................................................................................... : E.u.T.
Solar Domestic Hot Water Heating system / Sistema per il riscaldamento solare dell’acqua calda ad uso domestico ............................................................................................................................ :
SDHW
Heat demand / Richiesta di calore .............................................................................................. : QD
Energy delivered at the outlet of the solar heating system / Energia prodotta all’uscita del sistema di riscaldamento solare ................................................................................................................. :
QL
Solar fraction: the energy supplied by the solar part of a system divided by the total system load (QD = heat demand). fsol = QL/QD / Frazione solare: l’energia fornita dalla parte solare di un sistema divisa per la richiesta di calore totale (QD = richiesta di calore).fsol = QL/QD . .................................... :
fsol
Parasitic energy (electricity) for the collector loop pump(s) and control unit / Energia parassita (elettrica) per la(e) pompa(e) del circuito collettore e per l’unità di controllo ................................................ :
Qpar
Test Report n° M1.12.NRG.0596/48731 Pag. 4 of 15
Description of test item construction / Descrizione della costruzione dell’oggetto in prova
(Manufactories and part numbers, unless otherwise specified / Costruttori e part number, se non diversamente specificato)
Orderer / Richiedente ............................. : ICIM S.p.A.
Expeller / Rivenditore ............................. : SOLIMPEKS SOLAR CORP.
Manufacturer / Costruttore ..................... : SOLIMPEKS SOLAR CORP.
Sampling procedure / Procedura di campionamento ........................................ :
Random sampling from production / Campionamento casuale dalla produzione
Prototype submitted by client / Prototipo fornito dal cliente
Brand name / Nome commerciale ............ : TSM 300 L
Serial number / Numero di serie .............. : 120712007 ; 12007011
Lab. Identification code / Codice identificativo del laboratorio ......................... :
12.0333.A, 12.0333.B
Copy of marking plate(s) / Copia dell’etichetta(e)
Photograph(s) of the E.u.T. / Foto dell’oggetto in prova
Test Report n° M1.12.NRG.0596/48731 Pag. 5 of 15
System classification / Classificazione del sistema
System type / Tipo di sistema ......................... : Solar only / Solo solare Solar plus supplementary / Solare più supplementare
Flow principle / Principio flusso ...................... : Thermo-siphon / Termosifone Forced / Forzato
Heat transfer principle / Scambio di calore ..... : Direct / Diretto Indirect / Indiretto
Pressure principle / Principio pressione .......... : Open / Aperto Vented / A sfiato Closed / Chiuso
Drain principle / Principio riempimento........... : Filled / A riempimento Drain back / A scarico e recupero
Drain down / A scarico
Storage location / Posizione serbatoio .......... : Indoor / Interno Outdoor / Esterno Int. Coll. Storage / Accumulo integrato nel collettore
Storage position / Orientamento serbatoio ......... : Horizontal / Orizzontale
Vertical / Verticale Other / Altro
Integrated back-up / Ausiliari integrati ............. : None / Nessuno
Electric / Elettrico
Indirect / Indiretto
Direct gas / A gas diretto
Other / Altro
System ratings / Dati tecnici nominali del sistema
Max working temperature [°C] / Massima temperatura operativa [°C] ............................ : 140°C
Max working pressure [bar] / Massima pressione operativa [bar] .................................. : 6 bar
Rated (recommended) flow rate [l/h] / Flusso nominale (consigliato) [l/h] ..................... : 105
Storage / Accumulo
Manufacturer / Costruttore .................................................................................... : SOLIMPEKS SOLAR CORP.
Model / Modello ................................................................................................... : TSM 300 L
Rated total volume (Design daily load) [l] / Volume totale(carico giornaliero di progetto) [l] . : 300
Effective storage volume [l]/ Volume di accumulo effettivo [l] ........................................ : 290
Gross width [mm] / Larghezza lorda [mm] ................................................................. : -
Gross length [mm] / Lunghezza lorda [mm] ............................................................... : -
Gross heigth [mm] / Altezza lorda [mm] ................................................................... : -
Back-up heated volume [l] / Volume riscaldato dagli ausiliari [l] ..................................... : -
Back-up heating power [W] / Potenza riscaldante degli ausiliari [W] ................................ : -
Outer coating / Rivestimento esterno ........................................................................ : Galvanized and electrostatic painted
Thickness of the outer coating [mm] / Spessore del rivestimento esterno [mm] ............... : -
Insulation material / Materiale isolante .................................................................... : Polyurethan
Thickness of insulation material [mm] / Spessore del materiale isolante [mm] ................ : 50
Kind of connection storage-collector / Tipo di connessione accumulo-collettore ............... : Flexible stainless steel
Size/diameter of storage-collector connections [mm] / Diametro delle connessioni
accumulo-collettore [mm] ............................................................................................ : 24
Heat exchanger type / tipo di scambiatore di calore ................................................ : Mantle liquid-to-liquid – with jacket / A intercapedine
Test Report n° M1.12.NRG.0596/48731 Pag. 6 of 15
Collector / Collettore
Manufacturer / Costruttore ............................ : SOLIMPEKS SOLAR CORP.
Model / Modello ........................................... : TSM 300 L
Collector type / Tipo
di collettore ................ :
Glazed flat plate / Vetrato piano
Vacuum tube – Heat pipe single glass tube / Tubi evacuati – Tubo di calore singola copertura vetrata
Vacuum tube – Heat pipe double glass tube / Tubo di calore doppia copertura vetrata
Vacuum tube – U Tube / Tubi evacuati – Tubi a U
Vacuum tube – filled with water / Tubi evacuati riempiti d’acqua
Without covering – unglazed / Scoperto - non vetrato
Other / Altro : Scambiatore – Collettore vetrato con accumulo integrato
Serial product / Prodotto di serie ............................................................................. : YES / SÌ NO
Drawing number / N° di disegno ............................................................................ : -
Serial number / Numero di serie ............................................................................. : -
Date when manufactured / data di costruzione ........................................................ -
Collector loop flow range [kg/s] / Campo di flusso del circuito collettore [kg/s] ................... : -
Operating pressure [kPa] / Pressione di esercizio ..................................................... : -
Stagnation temperature at 1000 W/m2 and 30°C ambient temperature [°C] / Temperatura di stagnazione a 1000 W/m2 e 30°C di temperature ambiente [°C] ................................ :
-
Collector mounting / Montaggio del collettore ............................................................ : Flat roof / Tetto piano
Support frame material (if any) Materiale del supporto metallico (se esistente) ................... : Aluminum /Alluminio
N° of collectors / N° di collettori ............................................................................. : 2
Gross length [mm] / Lunghezza lorda [mm] ............................................................... : 1.988
Gross width [mm] / Larghezza lorda [mm] ................................................................. : 1.041
Gross height [mm] / Altezza lorda [mm] ................................................................... : 0.90
Gross area [m2] / Superficie lorda [m2]...................................................................... : 2.07 x 2 = 4.14
Aperture area [m2] / Superficie di apertura [m2]: 1.92 x 2 = 3.84
Absorber area [m2] / Superficie assorbitore [m2]: 1.90 x 2 = 3.80
Weight empty [kg] / Peso a vuoto [kg]: 37.2 x 2 = 74.4
Weight without glazing [kg] / Peso senza copertura vetrata [kg] -
Fluid capacity [l] / Capacità di contenimento di fluido [l] 1.07
Number of covers / Numero di coperture 1
Cover material / Materiale copertura Low Iron tempered glass / Vetro temprato a basso contenuto di ferro
Cover thickness [mm] / Spessore copertura [mm] 4
Cover solar transmittance [%] / Trasmittanza solare della copertura [%] .......................... : -
Test Report n° M1.12.NRG.0596/48731 Pag. 7 of 15
Absorber material / Materiale assorbitore : Aluminium sheet, copper piping
Absorber’s dimensions / Dimensioni dell’assorbitore ................................................... : 1824 x 890 mm
Absorber’s thickness [mm] / Spessore dell’assorbitore [mm] ........................................ 0.40 mm
Absorber dry weight [kg] / Peso a vuoto dell’assorbitore [kg] ......................................... : 6
Absorber – Fin width[mm] / Larghezza alette dell’assorbitore [mm] ................................. : -
Absorber – Fin thickness [mm] / Spessore alette dell’assorbitore [mm] ........................... : -
Solar absorptance α / Fattore di assorbimento solare α ............................................... : -
Hemispherical emittance ε / Emittanza emisferica ε .................................................. : -
Surface treatment / Trattamento superficiale.............................................................. : Almeco Tinox Al Selective Coating
Construction type / Tipo di costruzione .............................................................. : Laser welding
Number of risers / Numero di tubi di innalzamento ........................................................ : 10
Riser diameter or dimensions / Dimensioni o diametro dei tubi di innalzamento .................. : 10 mm
Distance between risers / Distanza tra i tubi di innalzamento ......................................... : -
Dimensions / Dimensioni dei tubi di innalzamento ........................................................... : -
Back thermal insulation thickness / Spessore dell’isolamento termico posteriore ............... : 40
Side thermal insulation thickness / Spessore dell’isolamento termico laterale................... : 30
Insulation material / Materiale isolante .............................................................. : Rock wool
Casing material / Materiale di contenimento .............................................................. : -
Sealing material / Materiale di sigillatura .............................................................. : -
Maximum operating temperature [°C] / Massima temperature operative [°C] .................. : -
Maximum operating pressure [bar] / Massima pressione operative [bar] ........................ : -
Other specifications / Altre specifiche .............................................................. : -
Test Report n° M1.12.NRG.0596/48731 Pag. 8 of 15
Comments on collector design / Commenti sul progetto del collettore ............................ : None / Nessuno
Heat transfer medium / Mezzo termovettore ............................................................ : Water
Alternative acceptable heat transfer fluids / Fluido termovettore alternative accettabile :
None
Auxiliary systems / Sistemi ausiliari
Control unit / Unità di controllo .............................................................. : N/A
Pump(s) / Pompa(e) .............................................................. : N/A
Load side heat exchanger / Scambiatore di calore lato carico ....................................... : N/A
Others / Altri .............................................................. : -
Test item particulars:
Accessories and detachable parts included in the evaluation / Accessori e parti
separabili incluse nella valutazione.................................................................................. : -
Options included / Opzioni incluse ......................................................................... : -
Block diagrams / Schemi a blocchi
Test Report n° M1.12.NRG.0596/48731 Pag. 9 of 15
Component list / Distinta dei componenti
Item / Componente Supplier / Fornitore Item code / Codice componente
Notes-material / Note - materiale
Flat glass
Lastra vetro TRAKYA CAM SAN A.S
Absorber sheet
Lamina assorbitore ALMECO TINOX
Absorber tubes
Tubi assorbitore SARKUYSAN
Manifold tubes
Tubi manifold SARKUYSAN
Collector Insulation
Isolante collettore IZOCAM
Collector box
Fondo collettore TASAS ALUMINYUM
Collector frame
Cornice collettore TASAS ALUMINYUM
Tape sealant
Sigillanti a nastro SECIL KAUCUK - EPDM
Other sealants
Altri sigillanti SIKA - SILICON
Tank covering
Copertura serbatoio Solimpeks manufacturing
Raw material : BOR CELIK via KERIM CELIK – MANISA
Inner tank
Serbatoio interno Solimpeks manufacturing
Raw material : BOR CELIK via KERIM CELIK – MANISA
Inner tubes
Tubazioni HACI AYVAZ
Tank Insulation
Isolante serbatoio DOW CHEMICAL
Sealants
Sigillanti SIMSEK PLASTIC
Gauges
Valvole THERMOWATT
Test Report n° M1.12.NRG.0596/48731 Pag. 10 of 15
Test summary statement / Attestazione di prova
The product tested as described on page 1 through 9 has been found in compliance with all the requirements of the stand ard(s) mentioned on page 1, as detailed below. The measurements were carried out from 5 th November 2012 to 7 th December 2012. No problems or relevant observations occurred during the measurements.
Il prodotto testato, come descritto nelle pagine da 1 a 9 rispetta tutti i requisiti della(e) norma(e) citata (e) a pagina 1, come dettagliato nel seguito. Le misure sono state effet tuate dal 5 novembre 2012 al 7 dicembre 2012. Duran te le misure non è stato evidenziato nessun problema né rilievo significativ o.
Clause
EN 12976-1
Clause
EN 12976-2 Requirement / Requisito
Results
Risultati Verdict
Esito
4.8 5.8 Thermal performance characterization / Caratterizzazione delle prestazioni termiche
See/vedi tabb. 1A, 1B, 1C, 1D
Dismantling final inspection / Ispezione finale di smontaggio See/vedi tab. 2 P
Test Report n° M1.12.NRG.0596/48731 Pag. 11 of 15
§ 5.8 TAB. 1A: Thermal performance characterization – TES TING SUMMARY /Caratterizzazione delle prestazioni termiche – Somm ario delle prove
Test start [YYYY/MM/DD] Data inizio prova [AAAA/MM/GG] 2012/11/05 Test end [YYYY/MM/DD]
Data fine prova [AAAA/MM/GG] 2012/12/06
Test installation / Installazione di prova: Outdoor / In esterno Indoor / In interno
Test method / Metodo di prova ISO 9459-2 (CSGT) ISO/DIS 9459-5 (DST)
Collector tilt / Inclinazione del collettore [°] 45 Collector orientation /Orientamento del collettore
South / Sud
Storage volume – Collector area ratio / Rapporto volume accumulo-area collettore – Vs/Ac [l/m2] 83.3
Under-dimensioned storage tank / Serbatoio sotto-dimensionato
Draw-off volume for test A / Volume spillamento per il test A [l] 75
Threshold temperature for test B / Soglia di temperatura per il test B [°C] 60
Draw-off start time for test A days / Ora inizio spillamento per I giorni di test A (t0) [6.30 a.m. ÷ 8.00 a.m.] 6.45 a.m.
Draw-off start time for test B days / Ora inizio spillamento per I giorni di test B (t0) 6.45 a.m.
Test sequences / Sequenze di prova
Sequence / Sequenza n° ....................................... : 1 2 3 4
Sequence type / Tipo di sequenza........................... : SsolA SsolB Ssto Saux
Avg. daily solar irradiation / Irradiazione solare
giornaliera media [MJ/m2] ......................................... : 14.2 13.4 0.6 -
Avg. air temperature [°C] / Temperatura ambiente media . : 12.3 11.2 7.1 -
Start date / Data inizio [YYYY/MM/DD] ................ : 2012/11/17 2012/11/26 2012/12/03 -
End date / Data fine [YYYY/MM/DD] ................... : 2012/11/21 2012/11/30 2012/12/04 -
Number of A days / Numero di giorni A .................... : 5 - - -
Number of valid A days / Numero di giorni A validi .... : 5 - - -
Number of B days / Numero di giorni B .................... : - 5 - -
Number of valid B days / Numero di giorni B validi .... : - 4 2 -
Consecutive valid B days / Giorni B validi consecutivi : 3 4 2 -
Parameter Identification / Identificazione dei parametri
Effective collector area / Area effettiva del collettore [m2] A*c 3.3 Uncertainty / Incertezza :
Effective collector heat loss coefficient
Coefficiente di perdita di calore effettivo del collettore [W·K-1·m-2] u*c 3.7 Uncertainty /
Incertezza :
Total store heat loss coefficient
Coefficiente di perdita di calore totale dell’accumulo [W·K-1] US 4.12 Uncertainty /
Incertezza :
Total store heat capacity
Capacità termica totale dell’accumulo [MJ·K-1] CS 1.33 Uncertainty /
Incertezza :
Mixing constant / Costante di miscelazione [ ] DL - Uncertainty / Incertezza :
Stratification parameter / Parametro di stratificazione [ ] Sc - Uncertainty / Incertezza :
Remarks / Note
Test Report n° M1.12.NRG.0596/48731 Pag. 12 of 15
§ 5.8 TAB. 1B: Long Term Performance Prediction – Design load /Predizione delle prestazioni sul lungo termine – Ca rico di progetto
Boundary conditions – System / Condizioni al contorno - Sistema
Collector tilt [°] / Inclinazione collettore [°] 40 Collector orientation / Orientamento del collettore South / Sud
Ambient temperature of the storage tank / Temperatura ambiente del serbatoio di accumulo [°C] Equal to Tamb Desired draw-off temperature TD (if this temperature is exceeded, mains water is mixed to achieve TD) / Temperatura di uscita desiderata TD ( se tale temperature è superata, si miscela acqua di rete per ottenre TD) [°C] 45
Daily draw-off volume (100% - 6 p.m.) / Volume giornaliero spillato (100% - 18.00) [l] 300
Draw-off flow rate / Portata di spillamento [l/min] [l/min] 10
Auxiliary power Paux-max / Potenza degli ausiliari Paux-max [W] --
Design load [l] / Carico di progetto [l] 300 (MS)
Boundary conditions – Reference locations / Condizioni al contorno – Località di riferimento
Location / Località Athens / Atene Davos Stockholm / Stoccolma
Würzburg
Latitude / Latitudine [N] 37°58’ 46°50’ 59°34’ 49°48’
Longitude / Longitudine[E] 23°43’ 09°47’ 18°06’ 09°54’
Weather data / Dati climatici: Test reference year Test reference year CEC Test ref. year Test reference year Global solar radiation on the horizontal plane [kWh·m-2·y-1] / Irradiazione solare globale sul piano orizzontale
Global solar radiation on the 45 ° inclined plane [kWh·m-2·y-1] / Irradiazione solare globale sul piano inclinato di 30°
1750 1740 1200 1270
Air temperature [°C] / Temperatura dell’aria 17.7 3.2 6.9 9.5
Mains water temperature / Temperatura dell’acqua di rete Tsa / [°C]
17.8 5.4 8.5 12.0
Annual variation deltaT of mains water temperature / Variazione annual deltaT della temperatura dell’acqua di rete Tsa [±K]
7.4 0.8 6.4 3.0
Boundary conditions – Other locations / Condizioni al contorno – Altre località
Location / Località … … … …
Latitude [N]
Longitude [E]
Weather data: Global solar radiation [kWh·m-2·a-1]
Air temperature [°C]
Mains water temperature Tsa [°C]
Annual variation deltaT of mains water temperature Tsa [K]
Performance prediction on annual base for a demand volume of 300 l/d (DESIGN LOAD) / Predizione della prestazione annuali per un volume di 300 l/g ( CARICO DI PROGETTO)
Location / Località Athens Davos Stockholm Würzburg Heat demand QD [MJ]: 12400 18050 16650 15950
Energy QL delivered by the system [MJ]: 8530 10722 6645 6867
Solar fraction fsol [ ] 68.8 59.4 39.9 43.1
Parasitic energy Qpar for the collector loop pump(s) and control unit [MJ]
-- -- -- --
Remarks
Test Report n° M1.12.NRG.0596/48731 Pag. 13 of 15
§ 5.8 TAB. 1C: System performance indicators / Indicatori delle prestazioni di sistema
Demand volume
[l/d] Reference locations => Athens Davos Stockholm Würzb urg
80
Heat demand QD [MJ]: 3300 4800 4450 4250
Energy QL delivered by the system [MJ]: 3203 4670 3063 3280
Solar fraction fsol [%]: 97.1 97.3 68.8 77.2
Parasitic energy Qpar [MJ]:
110
Heat demand QD [MJ]: 4550 6650 6100 5850
Energy QL delivered by the system [MJ]: 4222 6292 3897 4219
Solar fraction fsol [%]: 92.8 94.6 63.9 72.1
Parasitic energy Qpar [MJ]:
140
Heat demand QD [MJ]: 5800 8450 7750 7450
Energy QL delivered by the system [MJ]: 5180 7699 4673 5046
Solar fraction fsol [%]: 89.3 91.1 60.3 67.7
Parasitic energy Qpar [MJ]:
170
Heat demand QD [MJ]: 7000 10250 9450 9050
Energy QL delivered by the system [MJ]: 6008 8738 5373 5662
Solar fraction fsol [%]: 85.8 85.2 56.9 62.6
Parasitic energy Qpar [MJ]:
200
Heat demand QD [MJ]: 8250 12050 11100 10650
Energy QL delivered by the system [MJ]: 6776 9383 5816 6054
Solar fraction fsol [%]: 82.1 77.9 52.4 56.8
Parasitic energy Qpar [MJ]:
250
Heat demand QD [MJ]: 10350 15050 13850 13300
Energy QL delivered by the system [MJ]: 7853 10174 6291 6376
Solar fraction fsol [%]: 75.9 67.6 45.4 47.9
Parasitic energy Qpar [MJ]:
300
Heat demand QD [MJ]: 12400 18050 16650 15950
Energy QL delivered by the system [MJ]: 8530 10722 6645 6867
Solar fraction fsol [%]: 68.8 59.4 39.9 43.1
Parasitic energy Qpar [MJ]:
400
Heat demand QD [MJ]: 16500 24100 22200 21300
Energy QL delivered by the system [MJ]: 9387 11478 7088 7310
Solar fraction fsol [%]: 56.9 47.6 31.9 34.3
Parasitic energy Qpar [MJ]:
600
Heat demand QD [MJ]: 24800 36150 33300 31900
Energy QL delivered by the system [MJ]: 10370 12254 7569 7774
Solar fraction fsol [%]: 41.8 33.9 22.7 24.4
Parasitic energy Qpar [MJ]:
Test Report n° M1.12.NRG.0596/48731 Pag. 14 of 15
§ 5.8 TAB. 1D: Long Term Performance Prediction – GRAPHS /Predizione delle prestazioni sul lungo termine - G RAFICI
Energy delivered Q L and solar fraction f sol as a function of daily load Q D / Energia prodotta Q L e frazione solare f sol in funzione della richiesta di calore giornaliera ( carico) Q D
Daily load volume [l/d]
En
erg
y [
MJ/
ye
ar]
Daily load volume [l/d]
Ath
en
s
Daily load volume [l/d]
0
5000
10000
15000
20000
25000
30000
35000
40000
80 110 140 170 200 250 300 400 600
0.0
10.0
20.0
30.0
40.0
50.0
60.0
70.0
80.0
90.0
100.0
80 120 160 200 240 280 320 360 400 440 480 520 560 600
En
erg
y [
MJ/
ye
ar]
Daily load volume [l/d]
Da
vos
Daily load volume [l/d]
0
5000
10000
15000
20000
25000
30000
35000
40000
80 110 140 170 200 250 300 400 600
0.0
10.0
20.0
30.0
40.0
50.0
60.0
70.0
80.0
90.0
100.0
80 120 160 200 240 280 320 360 400 440 480 520 560 600
En
erg
y [
MJ/
ye
ar]
Daily load volume [l/d]
Sto
ckh
olm
Daily load volume [l/d]
0
5000
10000
15000
20000
25000
30000
35000
40000
80 110 140 170 200 250 300 400 600
0.0
10.0
20.0
30.0
40.0
50.0
60.0
70.0
80.0
90.0
100.0
80 120 160 200 240 280 320 360 400 440 480 520 560 600
Wu
erzb
urgE
ne
rgy
[M
J/y
ea
r]
Daily load volume [l/d] Daily load volume [l/d]
0
5000
10000
15000
20000
25000
30000
35000
40000
80 110 140 170 200 250 300 400 600
0.0
10.0
20.0
30.0
40.0
50.0
60.0
70.0
80.0
90.0
100.0
80 120 160 200 240 280 320 360 400 440 480 520 560 600
Test Report n° M1.12.NRG.0596/48731 Pag. 15 of 15
TAB. 2: Final inspection (dismantling) / Ispezione finale (smontaggio)
Test start [YYYY/MM/DD] Data inizio prova [AAAA/MM/GG]
2012/12/07 Test end [YYYY/MM/DD] Data fine prova [AAAA/MM/GG] 2012/12/07
Storage / Accumulo
Potential problems Evaluation Verdict
Swelling of pipes and components / Rigonfiamenti di tubature e componenti 0
Fluid leakages / Perdite di liquidi e sgocciolamenti 0
Cracking / Rotture 0
Warping / Deformazioni 0
Corrosion / Corrosione 0
Water retention/outgassing/degradation of the insulation / Ritenzione d’acqua / Perdita del vuoto / degradazione dell’isolamento 0
Collector / Collettore
Potential problems Evaluation Verdict
Cracking/warping/corrosion/rain penetration of the collector box/fasteners Rotture/deformazioni/corrosione/penetrazione di pioggia nella scatola del collettore e/o negli aggraffaggi
0 P
Cracking/adhesion/elasticity of the seals/gaskets / Rottura/incollamento/elasticizzazione dei sigillanti e/o delle guarnizioni 0 P
Cracking/crazing/buckling/delamination/ warping/outgassing of the cover/reflector / Rotture/formazione di crepe/crolli/delaminazioni/deformazioni/perdite di vuoto della copertura e/o del riflettore
0 P
Cracking/crazing/blistering of the absorber coating / Rotture/crepe/formazioni di bolle sul rivestimento dell’assorbitore 0 P
Deformation/corrosion/leakage/loss of bonding of the absorber tubes and headers / Deformazioni/corrosion/perdite/distacchi dei tubi dell’assorbitore e dei raccordi
0 P
Deformation/corrosion of the absorber mountings / Deformazioni/segni di corrosion dei dispositive di montaggio e fissaggio dell’assorbitore 0 P
Water retention/outgassing/degradation of the thermal insulation / Ritenzione d’acqua/perdita di vuoto/ degradazione dell’isolante termico 0 P
Mounting structure / Strutture di montaggio
Strength / Solidità 0 P
Safety / Sicurezza 0 P
Safety equipment / Equipaggaimento di sicurezza
Loss of function / Perdita di funzionalità 0 P
Safety / Sicurezza 0 P
Evaluation scale / Scala di valutazione: 0 - No problem / Nessun problema 1 - Requirement apart from testing not fulfilled / Problema di entità minore 2 - Requirements for testing not fulfilled / Problemi non trascurabili
N/A - Inspection to establish the condition was not possible / Ispezione non possibile
Verdict / Esito PASS
----------------- End of Test Report No. M1.12.NRG.0596/48731 ------------------