Post on 15-Jan-2017
HSE Statistics, Facilities &
Incident Reporting System
IMPLEMENTATION OF SAFETY PROGRAM
By: Ishtiaq Aziz Hashmi (QHSE Division Manager) Mind-Merge
Mind-Merge Motto : “No Compromise withSafety”
HSE Arrangement For Tower ProjectHSE Plan and Procedure (HSE-MS)
Safe Plan for Construction Phase
Safe Working Plan for Summer (Heat Stress)
Safe Working Plan for Steel Structure Work
Safe Plan for Dust Control / Heavy Wind Work
Emergency Evacuation Plan / Scape
Safety Rules & Regulation for Contractors
Safe Working Plan for Tower Installation
QHSE Documentation Control System
IMPLEMENTATION OF SAFETY PROGRAM
Accident / Incident Reporting System
Accident and Incident Safe Reporting System
Cost Saving Incident Reporting System
Safe from Penalty as endorsed by Agreement (Accident)
Safe from Incident affects (Company & Staff)
How to Safe the Cost and Delay Penalty due to Incident
Criteria for Selection of Sub-Contractor
External and Internal QHSE Audit
IMPLEMENTATION OF SAFETY PROGRAM
HSE Arrangement For Tower Project PTW (Permit To Work) Hot work, Cold work, Work at
Height, Scaffolding Permit, Crane work, Client Work
Permit, etc.
JSA For Excavation Work
JSA For Concrete Work
JSA For Electrical Work
JSA for Other Civil Work
JSA for Cable Work
IMPLEMENTATION OF SAFETY PROGRAM
Important Trainings For Tower Project
Training For Flagman Work (Green-man & Red-man Safety)
Training For Working at Height Safety (Tower)
Training For Electrical Work Safety
Training For Defensive Driving –DD1 (Long Drive)
Training For Emergency Escape & Assembled
Training For Hand Safety
Training For Heavy Equipment Safety
Training for Behavior Base Safety (Site Staff)
IMPLEMENTATION OF SAFETY PROGRAM
Important Trainings For Tower Project
Training For Fire Fighting (Generator Safety)
Training For First Aid Treatment (Tower Staff)
Training For Fall from Tower Height Safety
Training For Hand Tools Safety (M/A)
Training For Cable Pulling Safety
Training For Proper Use of PPEs
Training For Crane Operation Safety
Training For Rigger Level-3 for Equipment Operation
IMPLEMENTATION OF SAFETY PROGRAM
Safety Observation Program by HSE Officers on Weekly
Basis, Searching for Both (Positive and Negative Points
about Safety) and Unsafe Conditions
HSE Weekly Or Monthly Statistics Report
TBT –Tool Box Talk Topics (Weekly-03)
Safety Walk Through by Manager/Engn. (Weekly)
Record of Reported Near-misses
Record of Reported First Aid Cases
Record of Environmental Incident Cases
Safety Documentation for Tower Project
IMPLEMENTATION OF SAFETY PROGRAM
Safety Implementation PTW System (Hot work, Cold work, Height work, Scaffold
work, Excavation work, etc.)
Safety Orientation for New Staff
Fire Extinguishers Monthly Inspection
Color Coding for Inspection of Equipment
Fixed Safety Posters and Sign Boards
Incident Reporting System and Flow Chart
Proper Rope and Hard Barrication Providing for Site
IMPLEMENTATION OF SAFETY PROGRAM
Security, Safety and Emergency Plan
Providing Security Guards for Site
Fire Alarm will Use Manual Horn for any Emergency
Fire Extinguishers Fixing as per Requirement
Emergency Evacuation Layout will Provide
Emergency Contract Numbers posters and board will
Provide.
Safety Statistical Board will be Provided near Office
IMPLEMENTATION OF SAFETY PROGRAM
Important PPEs for Tower Project
IMPLEMENTATION OF SAFETY PROGRAM
Important PPEs for Tower Project
IMPLEMENTATION OF SAFETY PROGRAM
Tower Installation by Cranes
IMPLEMENTATION OF SAFETY PROGRAM
Site Staff Rest Room / Assembly Point
IMPLEMENTATION OF SAFETY PROGRAM
Site Office/Site Security Guard
IMPLEMENTATION OF SAFETY PROGRAM
Site Smoking Shelter as per Policy
IMPLEMENTATION OF SAFETY PROGRAM
Management Safety Training Program
IMPLEMENTATION OF SAFETY PROGRAM
Site Staff Training Program
IMPLEMENTATION OF SAFETY PROGRAM
Tool Box Talk (TBT) Meetings for workers
IMPLEMENTATION OF SAFETY PROGRAM
Achievements for Project
Man-hours Completed
without LTI = xxxxxxxxx m/hr
01-01-xxxx TO 31-12-xxxx
Should Mentioned on Board near to Site Office
IMPLEMENTATION OF SAFETY PROGRAM
THANKS FOR YOUR TIME
Mind-Merge Motto: “No Compromise With Safety”
THE END
IMPLEMENTATION OF SAFETY PROGRAM