Tim Flanagan Penn State Conference · Liquefaction – Turbo expander operation driven by gas...

Post on 16-Apr-2020

2 views 0 download

Transcript of Tim Flanagan Penn State Conference · Liquefaction – Turbo expander operation driven by gas...

Tim Flanagan

Penn State Conference

Liquefied Natural Gas

(LNG)

PECO Specifics

2

Combination Utility – Electric & Gas

• Electric in Philadelphia & Surrounding

Suburbs

• Gas in Philadelphia Suburbs

Bucks, Chester, Delaware,

Montgomery, & Lancaster Counties

Gas currently approximately 518,000

customers.

Approximately 6700 miles of gas main

PECO LNG Facility

3

LNG Plant commissioned in 1972

Located in West Conshohocken

LNG tank is 1.2 BCF (15 Million

Gallons LNG)

Designed for peak shaving operations

Control room on site – manned 24 X 7

Feeds - Transco & TETCO

Located in West Consohocken

4

PECO LNG Facility - Liquefaction

5

Liquefaction – Turbo expander operation

driven by gas combustion turbine – capable

of 6 million SCF/Day

Gas supplied from either TETCO or

TRANSCO – gate stations on site.

Typical Liquefaction timeframe – April –

October depending upon how much used

Goal is to have LNG tank full for internal

winter readiness date of November 1st.

PECO LNG Facility - Vaporization

6

5 LNG pumps (built-in redundancy)

5 individual vaporizers in water bath heat

exchanger (built-in redundancy)

Capable of vaporizing 312 million SCF/Day

Vaporization operations coordinated with

Gas Control

Increase normal staffing when vaporization

in progress.

7

LNG Control Room

8

LNG Control Room

10 LNG Control Room

Security – Cameras & Monitors

11

12 Security - Fencing

13 Security

Fixed Fire Protection

14

Cleansing Cycles

15

Combustion Turbine Building

16

Turbine, Nitrogen, Cold Box

17

Pipe Train & LNG Tank

18

LNG Pumps

19

Vaporizers

20

Vaporizers

21

LNG Fill station

22

Portable Vaporizer

23

24 Portable Vaporizer

25 Portable Vaporizer

Pump Skip

26

Pump Skid

27

Pump Skip Connected to Vaporizer

28

LNG Trailer

29

LNG Containment at Pump Trailer

30

LNG into Vaporizer

31

Vaporized LNG into Distribution System

32

33 Monitoring Systems

Monitoring Systems

34

Questions