The$Simplified$Method$of$Shoring/Reshoring$ · PDF...

Post on 15-Feb-2018

254 views 5 download

Transcript of The$Simplified$Method$of$Shoring/Reshoring$ · PDF...

The  Simplified  Method  of  Shoring/Reshoring  

•     Some  field  measurements  of  loads  suggest  that  the  simplified  method  is  accurate  enough  for  prac9cal  use.    Other  theore9cal  studies  consider  variable  s9ffness  of  the  shores,  or  aspects  of  the  slab-­‐shore  interac9on.    Some  recommend  a  correc9on  factor  of  5-­‐15  percent  to  be  used  when  using  compressible  shores  –  CommiFee  347  is  preparing  a  report.  

•     Assump9on  when  using  the  Simplified  Method    1.  All  Slabs  are  iden9cal  –  and  shores/reshores  are  aligned  one-­‐on-­‐one  from  floor  to  floor  2.  Ground  level  is  rigid,  and  shores  are  spaced  closely  enough  to  treat  the  shore  reac9ons  as  

a  distributed  load.  3.  Shores  and  reshores  are  infinitely  s9ff  rela9ve  to  the  slab.  4.  Slabs  interconnected  by  shores  all  deflect  equally  when  a  new  load  is  added,  and  carry  a  

share  of  the  load  in  propor9on  to  their  rela9ve  s9ffness  

SLAB  1   SLAB  1   SLAB  1  

0  0  

Step  1:  Place  level  1  concrete  

0  1D  

0  1D  

0  2D  

1D  0  

1D  0  

1D  0  

1D  0  

1D  0  

1D  0  

0  1D  

1D  1D  

1D  1D  

.5D  

.5D  

1.5D  0  

1D  0  

Step  2:  Place  level  2  concrete  Step  3:  Remove  shoring  1  

Step  4:  Re-­‐shoring  1  

Step  5:  Place  level  3  concrete   Step  6:    Remove  shoring  2  

SLAB  2  

SLAB  1   SLAB  1   SLAB  1  

SLAB  2   SLAB  2  

SLAB  2  SLAB  2  

SLAB  3   SLAB  3  

Shoring/Reshoring:  Simplified  Analysis  of  Loads:  Two  levels  of  shoring,  one  level  of  re-­‐shoring  

½  load  

½  load  

 full  load  

 full  load  

OG  load  -­‐1/2  transferred  

References:  Formwork  for  Concrete  –  Special  Publica9on  #4  Seventh  Ed  As  per  OSHA  standards:    Removal  of  the  forms  and  shores  should  be  specified  by  the  engineer-­‐architect  for  most  major  structures  during  construc9on.    

Notes:  once  slab  one  is  placed  all  load  is  transferred  to  the  shoring    

Notes:  Slab  2  is  placed,  all  load  is  transferred  to  the  shoring  2,  then  load  is  transferred  to  shoring  1  because  slab  1  can’t  take  load  because  the  shoring  doesn’t  allow.  

Notes:  When  shoring  is  removed  both  slab  1  and  slab  2  deflect  together  allowing  both  to  absorb  there  own  weight  

Notes:  No  change  when  reshoring  is  placed   Notes:  New  slab  is  placed  all  the  weight  is  transferred  down  through  the  shoring  and  reshoring  

Notes:  When  you  take  away  shoring  2  a  major  shia  happens,  half  of  the  load  that  was  carried  by  shoring  2  is  shiaed  to  slab  3  and  the  other  half  is  shiaed  to  slab  2.      Shoring  3  is  now  carrying  less  of  the  load.  

SLAB  1  SLAB  1  SLAB  1  

SLAB  1  

SLAB  2  

.5D  

.5D  

1.5D  0  

1D  0  

0  1D  

.83  1.17D  

1.83D  .34  

1.34D  0  

.59D  

.41D  

1.41D  0  

1D  0  

1D  0  

0  1D  

.92D  1.08D  

1.74D  .34D  

1.34D  0  

1D  0  

Step  7:  Place  level  4  concrete,  Reshore  2  with  level  1   Step  8:    Remove  shoring  3  

Step  10:    Remove  shoring  4  

Step11:  Place  level  6  concrete,  Reshore  4  with  level  3  

SLAB  2  

SLAB  3  

SLAB  4  

SLAB  3  

SLAB  2  

SLAB  4  SLAB  4  

SLAB  3  

SLAB  2  

Step  9:  Place  level  5  concrete,  Reshore  3  with  level  2  

0  1D  

.92D  1.08D  

1.74D  .34D  

1.34D  0  

1D  0  

.54D  

.46D  

1.46D  0  

1D  0  

1D  0  

1D  0  

0  1D  

.87D  1.13D  

1.79D  .34  

1.34D  0  

1D  0  

1D  0  

SLAB  1  

SLAB  3  SLAB  3  

SLAB  2  

SLAB  4  

SLAB  5  

SLAB  4  

SLAB  5  

SLAB  6  

SLAB  5  

1/3  load  

1/3  load  

1/3  load  

Load  -­‐1

/3  load  

2/3  Load  -­‐1

/3  load  

½  load  

½  load  

1/3  load  

1/3  load  

Load  -­‐1

/3  load  

2/3  Load  -­‐1

/3  load  

1/3  load  

1/3  load  

Load  -­‐1

/3  load  

2/3  Load  -­‐1

/3  load  

1/3  load  ½  load  

½  load  

OG  load  -­‐1/2  transferred  

OG  load  -­‐1/2  transferred  

Notes:  Now  when  a  new  slab  is  placed  the  load  is    shared  among  the  other  three  slabs.    This  is  high  load  impact  on.    Look  at  how  much  weight  slab  2  has  to  carry.  

Notes:  Same  method  as  step  6   Notes:  Same  method  as  step  7  

Notes:  Same  method  as  step  7  Notes:  Same  method  as  step  6  

Legend  

Newly  placed  concrete  slab  

Fully  cured  concrete  slab  

Deflec9on  of  concrete  is  occurring    

Transfer  of  load  is  occuring  

SLAB  1   SLAB  1   SLAB  1  

0  0  

Step  1:  Place  level  1  concrete  

0  1.6D  

0  1.6D  

0  2.7D  

1.05D  0.05D  

1.05D  0  

1D  0.05D  

1D  0  

1D  0.05D  

1D  0  

0  1.6D  

1.05D  1.6D  

1.05D  1.6D  

.52D  

.58D  

1.58D  0  

1D  0  

Step  2:  Place  level  2  concrete  Step  3:  Remove  shoring  1  

Step  4:  Re-­‐shoring  1  

Step  5:  Place  level  3  concrete   Step  6:    Remove  shoring  2  

SLAB  2  

SLAB  1   SLAB  1   SLAB  1  

SLAB  2   SLAB  2  

SLAB  2  SLAB  2  

SLAB  3   SLAB  3  

Shoring/Reshoring:  Simplified  Analysis  of  Loads:  One  levels  of  shoring,  two  level  of  re-­‐shoring,  assuming  Construc9on  Live  loads(.5D)  and  shores  and  forms  weigh(.1D)    

½  load  

½  load(1.05D)  

 full  load  

 full  load  

OG  load  -­‐1/2  transferred  

References:  Formwork  for  Concrete  –  Special  Publica9on  #4  Seventh  Ed  As  per  OSHA  standards:    Removal  of  the  forms  and  shores  should  be  specified  by  the  engineer-­‐architect  for  most  major  structures  during  construc9on.    

Notes:  once  slab  one  is  placed  all  load  is  transferred  to  the  shoring    

Notes:  Slab  2  is  placed,  all  load  is  transferred  to  the  shoring  2,  then  load  is  transferred  to  shoring  1  because  slab  1  can’t  take  load  because  the  shoring  doesn’t  allow.    Slab  two  has  construc9on  live  load(CLL)  and  shores  and  forms  weigh(SFW),  slab  just  has  SFW  

Notes:  When  shoring  is  removed  both  slab  1  and  slab  2  deflect  together  allowing  both  to  absorb  equally  the  remaining  weight,  which  is  just  the  self  weight  plus  SFW  of  slab  2  

Notes:  No  change  when  reshoring  is  placed   Notes:  New  slab  is  placed  all  the  weight  is  transferred  down  through  the  shoring  and  reshoring  

Notes:  When  you  take  away  shoring  2  a  major  shia  happens,  half  of  the  load  that  was  carried  by  shoring  2  is  shiaed  to  slab  3  and  the  other  half  is  shiaed  to  slab  2.      Shoring  3  is  now  carrying  less  of  the  load.    Also  assume  no  CLL  and  only  formwork  on  slab  3.  

SLAB  1  SLAB  1  SLAB  1  

SLAB  1  

SLAB  2  

.52D  

.58D  

1.58D  0  

1D  0  

0  1.6D  

1.05  1.65D  

2.11D  .54D  

1.54D  0  

.6D  

.50D  

1.5D  0  

1D  0  

1D  0  

0  1.6D  

1.13D  1.57D  

2.03D  .54D  

1.54D  0  

1D  0  

Step  7:  Place  level  4  concrete,  Reshore  2  with  level  1   Step  8:    Remove  shoring  3  

Step  10:    Remove  shoring  4  

Step11:  Place  level  6  concrete,  Reshore  4  with  level  3  

SLAB  2  

SLAB  3  

SLAB  4  

SLAB  3  

SLAB  2  

SLAB  4  SLAB  4  

SLAB  3  

SLAB  2  

Step  9:  Place  level  5  concrete,  Reshore  3  with  level  2  

0  1.6D  

1.13D  1.57D  

2.03D  .54D  

1.54D  0  

1D  0  

.56D  

.54D  

1.54D  0  

1D  0  

1D  0  

1D  0  

0  1.6D  

1.09D  1.61D  

2.07D  .54  

1.54D  0  

1D  0  

1D  0  

SLAB  1  

SLAB  3  SLAB  3  

SLAB  2  

SLAB  4  

SLAB  5  

SLAB  4  

SLAB  5  

SLAB  6  

SLAB  5  

1/3  load  

1/3  load  

1/3  load  

Load  -­‐1

/3  load  

2/3  Load  -­‐1

/3  load  

½  load  

½  load  

1/3  load  

1/3  load  

Load  -­‐1

/3  load  

2/3  Load  -­‐1

/3  load  

1/3  load  

1/3  load  

Load  -­‐1

/3  load  

2/3  Load  -­‐1

/3  load  

1/3  load  ½  load  

½  load  

OG  load  -­‐1/2  transferred  

OG  load  -­‐1/2  transferred  

Notes:  Now  when  a  new  slab  is  placed  the  load  is    shared  among  the  other  three  slabs.    This  is  high  load  impact  on.    Look  at  how  much  weight  slab  2  has  to  carry.  

Notes:  Same  method  as  step  6.    No  CLL   Notes:  Same  method  as  step  7  

Notes:  Same  method  as  step  7  Notes:  Same  method  as  step  6,  CLL  is  assumed  removed  

Legend  

Newly  placed  concrete  slab  

Fully  cured  concrete  slab  

Deflec9on  of  concrete  is  occurring    

Transfer  of  load  is  occuring