Post on 09-Jul-2018
For m
ore info about PE
TE
X, check out our W
eb site at ww
w.utexas.edu/ce/petex
www.utexas.edu/ce/petex
Th
e U
niv
er
sit
y o
f T
ex
asT
he
Un
ive
rsiT
y o
f T
ex
as
Co
nt
inu
ing
Ed
uc
at
ion
Petroleu
m exten
sion
service
1 University Station, R
8100A
ustin, TX
78712-1100
Enrollment InformationYour company is invited to participate in these training programs. For additional information, contact—
PETEXHouston Training CenterThe University of Texas2700 W. W. Thorne Blvd.Houston, TX 77073Tel: 800.687.7052or 281.443.7144FAX: 281.443.8722Email: petexhtc@www.utexas.edu
PETEX Production
Courses ➤ Production Technology
➤ Completion and Workover
www.utexas.edu/ce/petex
other PeteX Courses
Advanced Petroleum MeasurementBasic Petroleum MeasurementElectrical Maintenance FundamentalsElectrical Maintenance—Equipment and ApplicationElementary DrillingElementary Electronics for Nonelectrical PersonnelEngine and Compressor OperationsField Handling and Plant Processing of Natural GasGauging, Testing, and Running of Lease TanksHydraulics for Pipeline EngineersHydraulics for Pipeline OperatorsInstruments and ControlsIntroduction to Offshore OperationsIntroduction to Programmable Logic ControllersLNG: Basics of Liquefied Natural GasMass Measurement of Hydrocarbon FluidsNatural Gas Measurement—Design/Application/InspectionNatural Gas Measurement—Electronic Flow MeasurementNatural Gas Measurement—FundamentalsNatural Gas Measurement—Sampling and AnalysisPetroleum FundamentalsPetroleum Industry Fundamentals for AccountantsPetroleum Industry Fundamentals for InsurersPipeline TechnologyReciprocating Compressor/Prime Mover OperationsSupervisory Control and Data Acquisition Systems (SCADA)Valves and Actuators (Operation and Maintenance)
PETEX Production Courses All course sections taught by professionals with experience in the field!
Production Technology7.1 CEUs
Length: 9½ days or Subsurface: 5 days (3.8 CEUs) Surface: 4½ days (3.3 CEUs)
1st Week—Subsurfacereservoir FunDAmentAls • Reservoirrock • Overviewofreservoirdrives characteristics • Methodsofdetermining • Reservoirfluids reserves • Fluidflow • ReservoirstimulationnAturAl Drive mechAnisms • Waterdrive • Gas-capexpansiondrive • Dissolvedgasdrive • CombinationdriveArtiFiciAl liFt mechAnisms • Artificialliftmethods • Progressivecavitypumps • Artificialliftselection • Hydraulicjetpumps criteria • Capillaryinjectionstring • Electricsubmersiblepumps • Plungerlift • Suckerrodpumping • GasliftWellheAD eQuiPment • Equipmentoverview • Installation,testing, • Equipmenttypes maintenance • WirelineequipmentenhAnceD recoverY • Wellperformanceand • Chemicalmethods surveillance • Misciblemethods • Secondaryrecovery • Thermalmethods • Waterflood • Tertiary/CO2 recoveryoFFshore ProDuction—sPeciAl consiDerAtions
2nd Week—SurfacesePArAtion • Multi-phasefluids • Separatingliquidsand • Separatinggasandliquids condensate • TestseparatorstreAting liQuiDs • Liquiddehydration • Valvesandcontrols • FreewaterknockouttreAting gAs • Dehydration • Safety • GastreatingmeAsuring liQuiDs AnD gAses • Measuringliquids • GasmeasurementProDuceD WAter mAnAgement AnD DisPosAlleAse AutomAtion AnD emergencY shutDoWn • Typesofequipment • Enddevices • Human/machineinterface • SCADAsystem • Master • TypesofESDsystems • Communications • Maintenanceandsafety • RTU considerations
oil AnD gAs corrosionProDuction oPerAtions PrActices
Recommended ForTechnicians, foremen, production operators, and workoverpersonnel
Need on-site training?These courses can be customizedto meet your company’s needs.
For more information please call 281.443.7144.
Completion and Workover7.1 CEUs
Length: 9½ days or 1st Week: 5 days (3.8 CEUs) 2nd Week: 4½ days (3.3 CEUs)
1st WeekPlAnning the Job • Rotaryvsservicerig • Logistics–scheduling • EquipmentchecklistPiPe recoverY • Freepointbackoff • Jetcutteroperation operations • ChemicalcutteroperationsFishing • Loosejunk • Specializedtools • WirelinefishingWireline oPerAtions • Surfaceequipment • WirelinetoolsWell logging • Open-holelogging • Collarlogs • Fluids • Cementbondlogsselection oF DoWnhole eQuiPment • Packers • Preparationforfuture • Sealassemblies downholework • Landingnipplessolvent AnD chemicAl treAting, scAle AnD PArAFFin
removAl AnD control • Typesofsolvents,acids, • Formationdamage andscaledeposits • Safetyconsideration • ApplicationsandrestrictionssAnD control • Gravelpack • ScreenandlinercomPletion FluiD • Safety&environmental • Fluidlosscontrol considerations material/selection • Fluids • Displacements • Guidelines&issues • Massbalance • BrineeconomicscAsing AnD tubing • Selectionanduseofcasing,tubing,anddrillpipe • Stringdesignconsiderations
2nd WeekPerForAting • Casing • Unbalanced • Downtubing • Jetvsfluid
FrActuring • Purposeoffracturing • Fracturingfluidsselection • Mini-fracturing
PrimArY cementing AnD sQueezing • Muddisplacement • Plugcementing • Bondlogging • Squeezecementing • Cementandadditives • Cementdurability
siDetrAcking • Drilloutbelowcasing • Cutwindowandsidetrack
liners • Applications • Hangingliner • Linerhangers • Disconnectrunningtool • Runninglinerinwell • Cementingliner
coil tubing AnD nitrogen • Application • Safetyconsiderations • Toolsandequipment
PrimArY testing • Pourpoint • Swabtest • Bottomholesamples • Bottompressurebuilduptest
evAluAtion oF tests • Absoluteopenflow • H2S analysis • Gasandoilanalysis • GORdetermination
AcciDent Prevention
Recommended ForTechnicians, foremen, and supervisory-level production operators,workoverpersonnel,anddrillingpersonnel
Completion and Workover, cont.Production Technology, cont.