THE LIVERPOOL PROJECT

WELLINGTON DOCK April 2012

WELLINGTON DOCK APRIL 2013

3D MODEL FLY THROUGH

PRIMARY/SAS SLUDGE PROCESSING

BUILDING

THICKENED SLUDGE BLENDING

TANKS

INTERCONNECTION CHAMBER

SAS BUFFER TANK

HI DIST

CHAMBER

LO DIST

CHAMBER

B

L

O

W

E

R

S

SBR 1

SBR 4

SBR 6

SBR 8

SBR 7

SBR 5

SBR 3

SBR 2

SBR 11

SBR 13

SBR 15

SBR 9

SBR 10

SBR 12

SBR 14

SBR 16

FINAL EFFLUENT CHAMBER

SBR PIPE & SERVICES GALLERY

SBR FEED PUMPING STATION

SCREENS &

SLUDGE TANK

PRIMARY DRUM THICKENER PUMP STN

UNSCREENED SLUDGE

TANK

PRIMARY BUFFER TANK

SAS TRANSFER PUMPING STATION

R

I

V

E

R

“By employing BIM, GCA have cultivated a collaborative working environment

throughout the supply chain ensuring that everyone is focussed on

achieving best value on the project to take it forward through it’s lifecycle”

Neil Colman – Engineering and Capital Delivery Director for United Utilities