Post on 17-Jan-2016
description
TeamTeam Project Project InformationInformation
EIN 3390 Manufacturing ProcessesEIN 3390 Manufacturing ProcessesSpring, 2012Spring, 2012
Team Leader: Team Leader: holds team meetings to discuss projectworks with team to search and find a
product/part for team projectworks with team to develop specification of
the product/partworks with team to develop product/part
strategy/plancreates project schedule with milestonescoordinates and controls all processescoordinates communication between
engineersorganizes and coordinates team
presentation, andturns in team project report on time.
Design EngineerDesign Engineerworks with team leader to develop
specification of your product/partdevelops conceptual designdevelops functional designmakes structure/geometric design with
toleranceprovides design draft/prototypeimproves design from feedback, and provides final design
Material EngineerMaterial Engineerunderstands design requirementevaluates selected approaches
case-history approachmodification of existing productsentirely new productpros and cons
considers factors and make decisionfunctional and geometric concernsphysical, mechanical propertiesmanufacturabilitycostgreen environment
Manufacturing EngineerManufacturing Engineermakes manufacturing processes design,
including- technical requirement and descriptions
- product materials, geometry (size, shape, thickness)
- production rate, volume, lead time- automation level, amount of labor
creates manufacturing plan, includingtasks for each operation stepprocedures to show how and what to do
for each steprequired machines, tools, materials for
each step
Industrial EngineerIndustrial Engineermakes manufacturing System design
interrelationship between design & properties of materials
interrelationship between processes & properties of materials
facilities layout, choice of machines, equipments
conducts manufacturing system controlproduction schedule, time studyproduct qualityoutput ratecost estimation and evaluation
Tentative presentation date: 4/12/2012
Team Leader: Mere, Alfredo
Manufacturing Engineer: Fernandez Jr, Guillermo
Material Engineer: Alrashidi, Abdullah Mohammad
Material Engineer: Miller, Corey Adrian
Industrial Engineer: Pinheiro, Fernando H Design Engineer: Solomon, Aaron
Team 1Team 1Topic: Drilling processTopic: Drilling process
Tentative presentation date: (2/23/2012)
Team Leader: Lopez, Ricardo David
Design Engineer: Castro, Orestes Miguel
Industrial Engineer: Fuentes, Lorraine
Manufacturing Engineer: Infante, Alejandro
Material Engineer: Larrarte Torres, Jorge L
Team 2Team 2Topic: Multiple-use mold processTopic: Multiple-use mold process
Tentative presentation date: 3/27/2012
Team Leader: Parjus, Alejandro
Manufacturing Engineer: Deland, Erik A
Design Engineer: Fernandez, Jimmy Alberto
Industrial Engineer: Gutierrez, Henry
Material Engineer: Jie Tjoe Foek, Karel Otmar
Team 3Team 3Topic: Sheet forming processTopic: Sheet forming process
Tentative presentation date: 3/20/2012
Team Leader: Gonzalez, Maryel Andrea
Manufacturing Engineer: Garcia, Eduardo F
Material Engineer: Iriate, Francisco
Industrial Engineer: Moribe, Alex Andres
Material/Mfg Engineer: Portorreal, Ronald
Design Engineer: Rivera, Cesar Fabian
Team 4Team 4Topic: Rolling/forging processTopic: Rolling/forging process
Tentative presentation date: 4/19/2012
Team Leader: Diaz, Alejandro
Material Engineer: Gonzales, Sahivy
Manufacturing Engineer: Jadusingh, Richard
Design Engineer: Pijeira, Daniel Carlos
Industrial Engineer: Ramos, Luis
Manufacturing Engineer: Zuleta, Alexander
Team 5Team 5Topic: Milling process Topic: Milling process
Tentative presentation date: 4/10/2012Team Leader: Garo, RamonMaterial Engineer: Frometa, William Vicente
Manufacturing Engineer: English Li, Edgar C
Industrial Engineer: Hernandez, Marybel
Design Engineer: Medina, Maria E
Team 6Team 6Topic: Turning processTopic: Turning process
Presentation date: 3/29/2012
Team Leader: Simonis, Antonia Jean
Material Engineer: Reyes, Daniel E
Design Engineer: Sanz, Rafael B
Material Engineer: Sequera, Christopher H
Manufacturing Engineer: Morales, Lazaro J
Industrial Engineer: Kotun, Abdulkareem W.
Team 7Team 7Topic: Extrusion/Drawing processesTopic: Extrusion/Drawing processes
Grading Policy for ProjectGrading Policy for Project1. Presentation: 45%
- Presentation format, logic, and contents - Presentation description - Understanding project- Knowledge and implementation- Q/A
2. Attendance of team activities 10%
3. Final project report: 45% -------
100%