Introduction
Through long term experience in the fields of intercity and urban railways’ track design
and construction, we have virtually conquered all local track-related projects in Iran. From track
laying in ballasted intercity railways in Iran (more than 2000 km.) we have extended our services in
railway track engineering consulting and EPC projects. We have our footprints in Tehran, Mashhad
and Isfahan Urban Railways.
Our key personnel include best governmental supreme managers to well-educated
professional private engineers whom all have devoted themselves to development and
improvement of railway track engineering construction and engineering services.
We follow the best procedures world-wide and are keen in newly developed technologies
in railway track and signaling systems. Also due to very good binding with domestic track
elements’ manufacturers our prices are very competitive.
T.O.J. Co. Main fields of
expertise
Railways (Intercity Railway)
Urban Traffic Heavy Haul
Traffic
Ballasted Track
Consulting services
Project Management
Construction and
Supervision
Slab Track
Track Services
Communication Signaling
TadbirOmranJam (TOJ) Co.
Railway Superstructure and Track Laying Company
Brief Introduction
Brief Description of capabilities and activities TadbirOmran Jam (TOJ) Co.
1- Main Expertise
2-2- Railways (Intercity Railway)
The proper choice of a track system depends on many factors. Each project, after all,
places different challenges. Which system is the best for a certain application? Is a ballasted or a
non-ballasted solution advisable? Sometimes a simple solution will lead faster to your goal – and
sometimes a sophisticated system is the better solution over the long run. In any case, T.O.J. Co.
can offer the appropriate solution: We help you to find the right way.
A track system by T.O.J. Co. is always a tailored solution, in which systems are adapted to
special requirements. Curves, bridges, fill sections, tunnels, and turnouts place the strictest of
requirements on the route. Foundation-soil characteristics have crucial consequences for planning.
What physical forces and environmental influences can be expected? How will the soil react to
operational loads over the long run? And: What logistics requirements must be considered during
construction? After all: optimization of the process chain is our primary goal, and this includes
construction-site access, transport paths, and material supply.
2-3- Urban Traffic
Innovative concepts in urban traffic make our cities more worthwhile to live in. But
nowadays, foresight is more important here than ever: the coexistence of people, means of
transport, and other machines in crowded spaces demands intelligent and ecologically harmonious
solutions – not only in planning and logistics, but likewise during construction phases and during
transport operation. T.O.J. Co. offers innovative system solutions for all requirements of mass
rapid transit. And since each track system should be optimized for its special area of application,
T.O.J. Co. places special emphasis on close collaboration with our customers and business
partners.
Any public transport project in urban zones is just as individual as the city in which it is
implemented. Continuously new requirements challenge engineers and planners: urban
architecture, bridges, overpasses and tunnels, impressive squares, train stations, and malls and
shopping centers exert critical influence on the selection of systems. How do structures near a rail
line react over the long term to rail operating loads, and how should we protect them? In downtown
and residential areas, the public increasingly voices greater expectations for aesthetic criteria.
2-4- Heavy-Haul Railways
Due to heavy axle loads and special operating conditions these railways require special
attention in track design. Although the applied track system in most of these railways is ballasted
track but special attention should be given to track elements such as rail grade and dimension,
sleeper type and spacing and high-duty fastening systems.
T.O.J. Co. has long experience in freight and mixed railways lines across Iran and is
willing to submit all valuable experience to its oversea client. Main track design criteria for us in
this field are availability, punctuality and safety.
Brief Description of capabilities and activities TadbirOmran Jam (TOJ) Co.
2-5- Track Engineering Services
As an EPC contractor we have equipped ourselves with best track engineers and now we
are engaged in all track related project in all phases including feasibility studies, preliminary
design, basic design and detail design. Also our services are extended to track construction
management and supervision.
Our engineers have a long-term experience in Tehran, Mashhad, Shiraz, Isfahan and Ahvaz
urban railways and currently are supervising the track construction in Shiraz and Isfahan.
Following pictures shows are sample sheets which were presented to our Clients for previous track
design projects.
2- Key personnel
Responsibility
in T.O.J. Co. Main Previous responsibilities
Years of professional
experience
ValyAhmadiZadsaraee board of
directors
Consultant for Iranian Railway of Iran
Deputy of Railway general manager
General Manager of state-owned track
Construction Company
Deputy of railway infrastructure
department
30
Hassan Rasooli Board of
Directors
Mayor of Kashmar,
Governor of Zahedan
Deputy of Iranian railway planning
organization,
Member of board of directors of
Iranian railway,
30
Hassan Mosavinejad Board of
Directors
Deputy of railway general manager of
general manager of railway planning and
budget department,
Transport ministry consultant,
Deputy of railway planning office,
Member of railway boards of director,
30
Mahan Yoldashkhan Technical
Deputy and
ProjectManager
Track expert in design office of
ministry of roads and transportation,
Track engineer in Shiraz urban
railway design project,
Track engineer in Isfehan urban
railway design project,
Superior transport researcher of
ministry of roads and transportation in 2008,
Translator and author of several
track-related books in Iran,
13
Brief Description of capabilities and activities TadbirOmran Jam (TOJ) Co.
Beside the current activities and engineering services, this company always emphasize on
having up to date standards and publication, translation of the latest technical books and publishing
scientific articles by its experts.
Here are some of the scientific activities, done by TOJ experts:
1- Application of Cellular Polyurethane (PU) Materials for Increasing Track Elasticity and
Vibration Mitigation in Railway Track System, Mahan Yoldashkhan, 8th Railway
Transportation Conference
2- Development of a Light Mass-Spring System for Ground- Borne Vibration Mitigation
in Shiraz LRT Line, Mahan Yoldashkhan, 1st International Congress on Earthquake
and Lightweight Construction
3- Reliability Analysis of Rheda Slab Track System under Traffic Loads, Negin Tayebi,
Journal of Transportation Engineering
4- Practical Guide to Railway Engineering, Translated by Mahan Yoldashkhan
5- Railway Traffic and Timetable, Translated by Mahan Yldashkhan
6- Modern Accounting, Written by Mahmood Heydari
Brief Description of capabilities and activities TadbirOmran Jam (TOJ) Co.
4-1 Main Project:
Project Progress
Estimated
Cost
(Billion
Rials)
Description
Construction of Tehran metro Line 4 Depot
Superstructure and Track Laying 100% 30
Including Link
Tunnel and Depot
Super structure
Construction of Tehran Metro Line 4 Underground
Parking (Ekbatan) Structure 100% 300
Construction of Tehran Metro Line 4 Parking (Ekbatan)
Superstructure and Track Laying 100% 20
Superstructure
construction for
Underground
Metro Parking
Superstructure Construction and Track Laying for
Phase 5 of Tehran Metro Line 4 100% 79
Connection of
Azadi St to Eram
e Sabz St
Construction of Negin Floor Parking with 6500 m2 Area 100% 120
Superstructure Construction and Track Laying of
Tehran Metro Line 3 Phase1 Including 5 Km double
Track Tunnel 100% 80
Vali e Asr
Intersection St to
Sohrevardi St
Superstructure and Track Laying of Tehran Metro Line
3 Phase 2 (Vali e AsrIntersection St to Azadegan Depot) 100% 220
Vali e Asr
Intersection St to
Azadegan Depot
Enterance
Superstructure Construction and Track Laying of
Tehran-Tabriz Substituting Underground Route
Including 32 Km Slab Track and 7 Km Ballasted Track 100% 315
Thr Project
Carried Out in
municipality Area
No 17 & 18-
Employer: Rahab Construction of Jamedat Building for Alhavi Pharmacy
Factory 100% 50
Over 7000 m2 Building Contract management 80% 20
Contractor of 2000m2 Buildings 8% 10 Supervision for Iran South Railway Corridor
Implementation of Signaling and Telecommunication 60% 12
Infrastructure Maintenance of Tehran Metro Line 1 and
2 100% 20
Superstructure and Track Laying of North part of
Tehran Metro Line 3 (Vali e AsrIntersection St to
Beheshti)
100% 240
Superstructure and Track Laying of North part of
Metro Line 1(Tajrish Station) 100% 30
Superstructure and Track Laying of Tehran Kolahdooz
Depot of Metro Line 4 100% 40
Superstructure and Track Laying of Shiraz Metro Line 1 90% 200
Brief Description of capabilities and activities TadbirOmran Jam (TOJ) Co.
4-2- A Brief Description of the Company Main Project
Superstructure and Track Laying of Tehran Metro Line 3:
This project includesthe following main scope of works by which is left to the company:
Procurement of required rail to fulfill the project needs(TadbirOmran e Jam is
responsible for Procurement of 5000 tons of UIC 54E-1 rails.)
Procurement of fastener parts (including steel rail seats, large pad, small pad,
springs, different types of screws, welding materials and etc.)
Providing human source and required machinery.
Production of prefabricated ducts for tunnel facilities as well as transportation and
implementation beside of track superstructure.
Rail joints welding by thermit process.
Receiving of turnout and crossovers from TUSRC and implementation in slab track.
The main characteristics of this project are as follows:
No Project Part Contractor Scope of Works Length(Km)
1 Middle Part of Tehran
Metro Line 3 TadbirOmran e
Jam
Procurement of rails and
fasteners
Complete Superstructure
Construction
5
2 Southern Part of
Tehran Metro Line 3
(Bored Tunnel)
TadbirOmran e
Jam
Procurement of rails and
fasteners
Complete Superstructure
Construction
5.5
3 Southern Part of
Tehran Metro Line 3
(Cut & Cover Tunnel)
TadbirOmran e
Jam
Procurement of rails and
fasteners
Complete Superstructure
Construction
6.5
4 North Part of Tehran
Metro Line 3
TadbirOmran e
Jam
Procurement of rails and
fasteners
Complete Superstructure
Construction
17
Total(Km) 34
Brief Description of capabilities and activities TadbirOmran Jam (TOJ) Co.
The following figures show construction method for Middle Part of Tehran Metro Line 3.
Surveying and implementation of basic marks in vicinity of assembled track in tunnel.
Assembling and adjustment of a crossover in tunnel
Brief Description of capabilities and activities TadbirOmran Jam (TOJ) Co.
Concrete pouring by rail truck for construction of Tehran metro line 3 to line 4 link turnout
Assembled Track
Finished Track (after curing)
Brief Description of capabilities and activities TadbirOmran Jam (TOJ) Co.
Superstructure and Track Laying of North part of Tehran Metro Line 1(Tajrish Station) is
one of the challenging superstructure projects and We’ve used a 80 meter height shaft to access tunnel for
concreting slab.
Crane used for transferring concrete to tunnel
Clip screw fixing
Brief Description of capabilities and activities TadbirOmran Jam (TOJ) Co.
Superstructure construction and track laying of KollahDouzDepot(Tehran Metro Line 4 Depot)
KollahDouz Depot supposed to be the end depot of Tehran metro Line 4 in which all levels of
line 4 rolling stock maintenance are performed. Procurement of all track parts (including sleepers,
fasteners, ballast, welding and etc) as well as providing human resource, construction machinery,
track laying and construction of all tracks in depot area are left to TadbirOmran e Jam Company.
General Plan of KollahDouz Depot Track Layout (App 10 km length).
Poured concrete for KollahDouz Depot Link Tunnel which was curing by wet textiles
Brief Description of capabilities and activities TadbirOmran Jam (TOJ) Co.
Superstructure construction and track laying of Tehran-Tabriz underground tunnel
By this contract Iran railways examined the first slab track in their underground tunnels.
The main scopes of works are as follows:
1- Procurement of 4000 tons of E60 rails.
2- Production of di-block sleepers.
3- Procurement of fastener parts.
4- Construction of slab tracks and ballasted tracks.
5- Welding process and other complementary works.
Rail unloading from flat rail truck to road truck
Ballasted track
Brief Description of capabilities and activities TadbirOmran Jam (TOJ) Co.
Arranging of di-block prefabricated sleepers and assembling them to build track panels and initiating of track adjustment.
Prepared track Panel ready to track laying and track adjustment procedure
Brief Description of capabilities and activities TadbirOmran Jam (TOJ) Co.
Pouring concrete of slabs
Sleepers which are used in this project, are double block sleepers and Tadbir Omran Jam
has produced over 50000 sleepers.
Preparing sleeper frames
Brief Description of capabilities and activities TadbirOmran Jam (TOJ) Co.
Preparing sleeper frame
Sleepers truss bars
Brief Description of capabilities and activities TadbirOmran Jam (TOJ) Co.
Sleeper production
\
Batching Plant
Brief Description of capabilities and activities TadbirOmran Jam (TOJ) Co.
1Metro Line Shiraz of uperstructure and Track LayingS
In this project, Tadbir Omran Jam is in charge of superstructure and track laying of over 8
kilometers of single track tunnel and also about 2 kilometers of open track.
Assembled track in single track tunnel
Sleeper laying in U-Wall area
Brief Description of capabilities and activities TadbirOmran Jam (TOJ) Co.
Superstructure in U-wall area
Superstructure in single track tunnel
Brief Description of capabilities and activities TadbirOmran Jam (TOJ) Co.
Infrastructure maintenanceof Tehran metro Line 1 and 2
By this contract, tadbirOmran e Jam is responsible for all maintenance activities for tracks and
structures of Tehran metro line 1 and 2.
Preperation of
maintenance Plan
•Preperation of general maintenace plan for tracks and superstructure
•Preperation of general maintenace plan for turnouts and crossovers.
•Preperation of general maintenace plan for track srtuctures.
•Receive monthly orders from employer
Track Maintena
nce
•Control and adjustment of track gauge.
•Grinding of rails
•Checking of fastener parts and replacement of faulty parts.
•Checking of welding and rail joints and required geometrical and mechanical corrections
•Checking and adjustment of rubber pads under rails and under rail seats
Maintenance of
Switches and
Crossovers
• Weekly services of turnouts and crossovers including lubricating and cleaning of sliding plate, blades and enterance.
• Full control of joints and wrenching of screws.
• Geometrical control of frog and performoing reqired correctional actions.
• Checking of sealed joints at start and end of turnouts.
• Check and correction of geometrical plan of turnouts and crossovers in slab tracks and ballsted tracks.
Ballast bed
Maintenance
• Geometrical control of ballasted tracks and preparing of track geometrical adjustment in horizontal and spiral curves.
• Adjustment of track, turnouts and crossover geometrical parameters if required.
• Subgrade leveling.
• Checking of subgrade fouling, water drainage and fouled ballast replacment, if required.
• New Ballast tamping or parts of routes which is required.
• Control of rail joints in ballasted tracks and geometrical adjustment, weld and joints corrections.
Infrastructure
Maintenance
• Inspection of all utilities ducts(57 and 72 cm)
• Inspection of all track drainage, sides and mid canals, outlets and remove faults.
•Correction of slab tracks concrete
•Repair of duct plug.
•Removal of weeds in depot
• In depots some of actions related to utilities are performed by structure team.
Brief Description of capabilities and activities TadbirOmran Jam (TOJ) Co.
Machineries
We own a wide range of machineries for track superstructure construction and
maintenance. Our machineries cover both ballasted and ballastless track structures. In the following
we intend to depict some of our machineries’ potentials.
Light Track Machineries
Brief Description of capabilities and activities TadbirOmran Jam (TOJ) Co.
List of Light Machineries
EQUIPEMENTS for ALUMINOTHERMIC WELDING
Rail shearing machine
Turbine Preheating unit
Cutting blades
Rail stressor
Rail thermometer
TRACK MACHINERIES
Sleeper drilling machine
Light Grinding unit
Abrasive disc saw
Impact wrench
Grinding unit on trolley
Profile grinding machine
Rail cleaner
Rail drilling machine
Profile grinding machine
Sleeper drilling machine
Coachscrewing machine
CONTROLLING DEVICES
Track & switch measuring devices
Platform gauge
Versine measurement set
Data-logging trolley
Ultra sonic flaw detector trolley
Electronic gauge for straightness
Ultra sonic flaw detector
Hardness tester
Track & switch measuring devices
Hardness tester
LIFTING or HANDLING EQUIPMENTS
Motorised Trolley
Light weight trolley
Welders trolley
Mechanical jack
Hydraulic jack
TRACK TOOLS
Forks & Ploughs TOM1 BALLAST REMOVAL
Tongs RAIL & SLEEPERS HANDLING
Mechanical spanners
Bars
Shovels, picks, adzing howels
Brief Description of capabilities and activities TadbirOmran Jam (TOJ) Co.
Hammers & mallets
RAILS and FISHPLATING
C Clamp FISHPLATING
Insulated rail joint
HeavyTrack Machineries
Sleeper Replacement Machine
Multi-Function Light Loader
Brief Description of capabilities and activities TadbirOmran Jam (TOJ) Co.
Multi-Function Light Loader (In practice)
Rail-Based Crane and Transport Unit
Brief Description of capabilities and activities TadbirOmran Jam (TOJ) Co.
Track mixer (used both on railway track and road)
Also we are able to provide following special track machineries for
high-duty applications:
1- Tamping Machine 09-32,
2- Ballast Regulators,
3- Ballast Cleaning Machines,
4- Track Stabilizers,
5- Mobile flash-butt welding units,
6- Track laying cranes,
7- Track recording cars.
Brief Description of capabilities and activities TadbirOmran Jam (TOJ) Co.
Other Civil Machineries
Following table shows a complete list of our machineries (except
special track machines).
Item Vehicle Type Number Comments
1 Loader 1 Heavy duty
2 Transport vehicle 5 Benz and Amico
3 Mobile Water Tank 2
4 Trailer 1
5 Heavy Duty Concrete Mixer
Vehicle
4 Benz
6 Cranes 2 35 Tones
7 Concrete Batching Plant 2
8 Concrete Pumps 2
9 Stationary water tanks 3 60000, 5000 and 3000 liters