Tabasco Shear System - Wallbridge Mining

Post on 02-Jul-2022

3 views 0 download

Transcript of Tabasco Shear System - Wallbridge Mining

Note:

*The section lines mark the intersection of the referencedsection and the 3D model of theTabasco Zone and are therefore irregular.

Sec�on 10200E*

Sec�on 10350E*

Sec�on 10050E*

Due to multiple splays withinthe Tabasco Shear System, some holes may have multipleintersections shown

1.4636.90incl.2.18

10.45

Visible Gold(where assays pending)

Fenelon Gold Tabasco Shear System

Inclined Long Sec�on Looking Northeast

May 20, 2020

May 20, 2020 Release

Previously Released

Metal Factor Interval g/t Au x Core Length(m)

Au g/tm

UNTESTED

UNTESTED

0

Metres

50 100 200

Au g/tm

UNTESTED

UNTESTED

> 40 Metal Factor

20-40 Metal Factor

10-20 Metal Factor

UNTESTED

Assays Pending/Historic Core to be sampled

UNTESTED

UNTESTED

UNTESTED

< 5 5-10 10-20 20-40 40-100 >100

> 100 Metal Factor

FA-19-086

FA-19-098

FA-19-099

FA-19-090

FA-19-092

FA-19-101

FA-19-065

FA-19-096

FA-19-094

FA-19-104

FA-19-103

FA-19-075

FA-19-102

FA-19-080

FA-19-052

FA-19-059

FA-20-108

FA-20-115

FA-20-109FA-19-116

FA-20-118

FA-19-085

FA-20-123FA-20-128

FA-20-127

FA-20-129

FA-20-134

FA-20-107

FA-20-133

FA-20-126

FA-20-110

FA-20-119

-1000 m

-800 m

-600 m

-400 m

-200 m

15.301.20 9.72

1.17

11.683.16

13.881.20

2.7611.302.76

11.30

2.7111.592.71

11.59

20.898.54

20.898.54

3.6118.963.61

18.965.75

10.945.75

10.9422.7348.01

5.5010.965.50

10.96

4.1635.55

4.237.804.237.80

32.189.70

4.9910.32

7.327.637.327.63

8.244.28

43.4719.0043.4719.00

3.5516.81

44.151.82

11.211.87

4.7014.55

4.3132.50incl.

10.646.68

3.3743.70incl.5.71

19.45

3.6613.00incl.9.904.00

9.768.50

16.936.00

5.579.405.54

5.10

3.4011.95

3.1924.95incl.6.908.20

4.8456.00incl.

13.295.65

3.0318.49incl.6.188.00

2.5826.50incl.

12.333.00

8.4119.15incl.

41.013.65

4.6517.65