Suspended Manual-English-Volume 3-Part 3 - Construction Manual

Post on 02-Apr-2018

231 views 0 download

Transcript of Suspended Manual-English-Volume 3-Part 3 - Construction Manual

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 1/106

Bridges to Prosperity

Vlum 3:

Euca. Innva. In.

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 2/106

Vlum 3:

 Volume 3: Suspended Part 3 Construction Guide & Quality Control

Introduction

B P (B2P) - z (NGO)

j. T

j j. A

, B P z ,

. I

, q. V

1 , , q

j. V 2 j

j. V 3

- V 4

- .

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 3/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control

Section : Construction Overview 

Section : Material Preparation2.1 Rq M

  2.2 P L M Rq T

Section : Site Preparation3.1 Ex L

3.2 Ex S

3.3 Ex R

 Section : Construction

4.1 B T G

4.2 C M G

4.3 F T C

4.4 T C

4.5 A C & C I: B

4.6 A C & C I: D

4.7 C S S

4.8 C C I

4.9 C C

4.10 B A C

4.11 D I

4.12 D A

4.13 F I

 Volume Suspended Pedestrian BridgePart : Construction Guide & Quality Control

Table of Contents

Section : Bridge Completion  5.1 B R

5.2 S I

5.3 P I

 

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 4/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control 

> M C Exv 

R

  Cuy aL

aR

I Ay

  aS - 5

aS,

aC

  aC, .

> Fu T - 2 to 4 weeks

 R

  Cuy aL

I Ay

aS - 5

  aM

Section :Construction Overview 

  Preparation

  • T q: , 2

Construction• T q: , 2 4

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 5/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control 

> T Cu S I - 5 y

  R

  Cuy aL

I Ay

aS - 5

  aM

> Ah C I - 3 5 y (u 4 k f u )

 

R

  Cuy aL

I Ay 

aS - 3

  aM

 

> C S S - 2 y

  R

  Cuy

aL

I Ay 

aS - 2

  aM

 

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 6/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control 

> Ah Cu - 1 4 k

 

R

  Cuy

aLI Ay 

aS - 3

> Dk F I - 3 5 y

 

R

  Cuy aL

I Ay 

aS - 2

> B O Cy - 1 y

 

R  Cuy 

aC

I Ay 

aA

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 7/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control 

Section :Material preparation

. Required Materials

L Cu M

A . A q j

j . C q ,

. C q V 3.2 q .

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 8/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control 

. Preparing Local Materials

  T Rqu

• H • G

• B • C 

S C Bk f T

B S: ____3 (Q V 3.2)

B . B

. N

q.

A) D S: ____3 (Q V 3.2)

D q .T :

> C S: ___3 (Q V 3.2)

T q

. S

x 20 x 28 .

> F S : ___3 (Q V 3.2)

T ( )

q

. S

x 20 x 28 .

B) C B: ____3 (Q V 3.2)

C - ,

q .

A , j

.

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 9/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control 

Gv

T () x

; x

, . D x x

, . G q . R

. Mx z 7 ,

. A

7 . G

z.

S

T x z

. T 50% z

. T, (

), x .S q. T q

. C , , ,

.

. S .

N: S

,

.

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 10/106

Materials List:

X Material item Quy

Rqu

D f 

vy

site

Notes

L M

S

B S ( C B)

D S ( C B)

G ( )

C M

C AC T

C T

C A

M

S 12

S , 16

S , 18

S , 20 S , 25

H S

P W S A I &

(20 )

Fx T, 3”

T W

Quality Control: Bridge Construction Pg 2

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 11/106

Tool List:

Material item Q u y

Rq’ x

Material item Quy Rq’

x

S 4 H 5

P 2 100 1

Ex 1 B see drawings

W 2 S see drawings

20 (5 ) 6 R see drawings

M 1 C S & C 1

M , 5 2 R 4

M ( ) 2 sets R 5 liters

W 1 F 20

H x 2 V 2

2 1 R 4

4 ( ) 1 4” min. 1 per

crossbeam

W; 3 , z

2 A L 1

H ;

z.

1 D 4

M 1

10 1

S 1

P 1

P 1

T 1

Pliers 1

Quality Control: Bridge Construction Pg 3

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 12/106

Quality Control Checklist: Material Preparation

X

Local materials

I ?

I 7 , ?

I z?

I ?

I ?

Cu M

I ?

A ?

C f h Suv:

N , q x, :

Su f Suv: ________________________________ D: __________________

  *This page must be copied and aached to Bridge Compleon Record upon compleon of bridge.

Quality Control: Bridge Construction Pg 4

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 13/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control 

Section :Site Preparation

. Excavation Layout

  T Rqu

• S P • S • A ( )

• S & P • S • P

• W • H • N

Step 1U ‘R’ ‘L’ , , R ( L )

, . I , ,

q . P

, FOF(R) F F R.

Step 2F . F,

2.00 (). T

.

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 14/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control 

Step 3R . I ,

q . R .

Step 4M (FOF) (FOA) FOA(R).

Step 5: the 3-4-5 methodT

U 12 , FOF(R), 4.0

. T 9.0 ,

3.0 , 3-4-5 . T

. S , ‘1’. R

.

Step 6Ex . T

x .

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 15/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control 

. Excavation in Soil

Step 1Ex .

Step 2D .

Step 3D .

*Note, anchors are oen excavated aer the towers have been completed .

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 16/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control 

. Excavation in Rock 

T (FOF(R)) (FOA(R))

4.2 Ex S.

F q x . E

.

S q x , q

x. Ex

. S x

( x ).

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 17/106

Quality Control Checklist: Site Preparation

X

Lyu

S ?

C ( ) ?

B ( )?

P ?

Ex ?

Exv

Ex ?

Ex ?

N x?I x, ?

C f h Suv:

N , q x, - :

Su f Suv: ________________________________ D: __________________

Quality Control: Bridge Construction Pg 5

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 18/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control 

Section :Construction

. Bridge Terminology Guide

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 19/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control 

4.2 Concrete and Masonry Guidelines

T x

B2P j. I .

T G C QC C q j.

Quy C P

A (1) x . T “Q C (QC) -

” . T x x

.

Materials

C q q . L , , j. E

;

• C ( 60 )

• S (, , , .)

• S ,

• S

• W

• G 1.5 (3.8 )

• G , j

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 20/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control 

Mx P

D x .

Mx R y Vu(::v:) Use

A Vu, (f) 50-k f 

A Vu,5- uk 50-k

f

Ax Ym3 (f)

1 : 3 : 6 : 1.6

F,

A,

T

Sand 130 (4.6) Sand 3.1

0.24 (10)Gravel 180 (6.4) Gravel 4.3

Water 70 (2.4) Water 1.6

1 : 2.5 : 5 : 1.6

Foundations on

poor soil

Sand 110 (3.9) Sand 2.6

0.21 (9.5)Gravel 160 (5.7) Gravel 3.8

Water 70 (2.4) Water 1.6

1 : 2 : 4 : 1.6

Approach walls

and tower fill

Sand 80 (2.8) Sand 1.9

0.17 (8.0)Gravel 130 (4.6) Gravel 3.1

Water 70 (2.4) Water 1.6

*Unit measurements must may be in any size bucket so long as it is consistent for all materials

N x 1 . A

50- .

F x, x x 1 : 3 : 6 : 1.6. N

x 50- . Y x 4.6 () , 6.4 2.4 . I

5 . A, 50- 3.1, 5- ,

4.3 1.6 .

Bf y x , h “QC” hu h / u . A

hu u f h x. I y h uh f h

h x.

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 21/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control 

C Mx

M Rqu

• S • G

• B ( x) • C

• S • G

• F • W

 

F , x

x q. I

,

x ‘ ’. T q ,

q , . Mx

x . T “ ”  

x . A x, 90% . C x /

.

T ‘V M’

. T

x

x.

A x, ,  

. F 60 . T

, ,

( ).

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 22/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control 

Cu

A ,

. W , . M

.

Axu - A

I 28 , q. C

q . T -

“ ” . I , ;

•R , 500-750 50-

•R x 25%•Ex

•Ex x

Gu M Mx

G x q . M  

. M ( 1 : 4, )

. G x . F 50- x

7.5 (2 ) . B x x. T x ,

.

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 23/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control 

Su T

I ,

. A x

. I  

x . I

. T x , ,

.

T Rqu

• S C - (20 (8”) . x 10 (4”) . x 30 (12”) )

• S B -

• C S

• T R - (~1.58 (5/8”) x 40-50 (16”-18”) , )

• T M

Th u f y h f (xu u x) hu h 11.2

(5”). I x -

( QC ).

A, x, q ,

. I x

.

S T T

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 24/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control 

Su T - Pu 

S 1: M , , .

S 2: P ( ) .

S 3: F . T,

, 25 . F , 25 . F ,

25 . U x .

S 4: S ( 5 ). T, ( )

, “” . T .

H M S

H R S C

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 25/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control 

Cv T

I , . S

x . N x q .

  T Rqu

• P - (10.16 (4”) . x 20.32 (8”) )

• S

• C S

• T R - (~1.58 (5/8”) x 40-50 (16”-18”) , )

T ;

S 1

L x, .

S 2

P , . F q , 25 . A

. S .

S 3

C . T 16 – 27 C. C-

8 . P .

S 4

B , 28 . B

28 B P @..

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 26/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control 

Concrete Quality Control Form

B N:

C:

C C P:

L ? I ?

W ?

I , ?

I , ? 

W ?

I , ? 

P / :

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 27/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control 

Concrete Quality Control Form

D Mx P L B

A

? I ,

?

M

S

Were

cylinders

?

C

person

A

*Av y h “ ” qu f , x, f .

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 28/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control 

S My

  T Rqu

• C • H • Sq

• T • P B

• L • S

T .

aU .

aA x .

  aA q .

  aT ; .

aP .

aA .

G 5 j. S

( j) j

.

U, x 2 . I

q,

q.

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 29/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control 

Bk My

  T Rqu

  • T • P B • W • N

• L • S • Sq • H

 

T .

a( ) M

aMx

  aM 1-2

  aP

  aF

aA

“G ”. S ( j) j .

C Rf W

D

,

.

T 20 (12)

() 50

*, 3 z 20, 50, 80. P .

*F : 1.00

1

1 z .

N z , . I

.

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 30/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control 

4.3 Foundation & Tier Construction

  T Rqu

• S • P • W

• S • B • M

• Sq

 

M Rqu 

• C •H C

• G ( ) • B ( )

• S

Step 1E , . U ,

q .

Step 2P (20) .

I , x .

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 31/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control  

Step 3P (4) - (

). E q

.

Step 4

F , , . I ,

30 , , ,

. I ,

.

Step 5C 1.00 .

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 32/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control  

Step 6F .*

* I

. P (12) /

(1.00) 50 . W (

) z (12) 20, 50, 80.

W , 20 . W 2

.

Step 7U , .

Step 8P ,

, 0.70 , x  

.

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 33/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control  

Step 9V z .

Step 10AS YOU BUILD UP THE TIERS, RECONFIRM THAT EACH TIER IS TRUE TO THE CENTER LINE BEFORE CONSTRUCTION BY MARKING THE CENTER

LINE ON THE FOUNDATION OR TIER BELOW.

C . E , .

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 34/106

Quality Control Checklist: Foundation & Tier Construction

X

FuF q ?

F ( )?

F 1.0 ?

N x ?

T/

E ?

E z , ?

A 90 x?

C f h Suv:

N , q x, :

Su f Suv: ________________________________ D: __________________

*This page must be copied and aached to Bridge Compleon Record upon compleon of bridge.

Quality Control: Bridge Construction Pg 6

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 35/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control  

  T Rqu

• S • P • S

• S • B • M

• Sq • W • L

M Rqu

  • C • S

• G • H

• T • T W

• 4 x 13” .

• S ( z q):

- 4 , 16 x 4.50

- :

# + 1, 16 x 20

4.4 tower Construction

S R

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 36/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control  

Step 1A T

M . I , 1

2

. T 1.00 x 2.80

, . E ( F & T C S 10, 28).

 

Step 2

S CP - q

. C  

, q.

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 37/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control  

Step 3Bu T B

B , 20 ,

(2.80 x 1.00).

`

Step 4I S R

F , 2 , 16 x

j -. E

U-: 2 1.25 x . P S 3

10 ,

20 .

C

(16)

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 38/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control  

Step 5C u

B 1.00 x .70 1.00 ( )

Step 6F h T

D . U x, 1:3:6,

x 5.2. F 10 . T

x .

Step 7

I h Wky S/R Gu

B 10 ( ).

M 58 ( 2 )

( , - ).

I , , 5. P 2 3

2 4 . F

58, 63, 68

. M .

F 10

(30 ) 1:2:4.

NB: F .

P A: H S

P L: W S

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 39/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control  

Step 8F H S

T 1.10 , . I

( ) 25

40 . B

1:2:4. M . F .

 

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 40/106

Quality Control Checklist: Tower Construction

X

P-Cu

C ?A (H) ?

Cu H q 1.10

W ?

H ?

R : z,

C f h Suv:

N , q x, , :

Su f Suv: _____________________________ D: __________________

*This page will be copied and aached to Bridge Compleon Record upon compleon of bridge.

Quality Control: Bridge Construction Pg 7

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 41/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control  

4.5 Anchor Construction & Cable Installation

 T ; . T - 60 .

A q .

Beam type

   All Soil and Rock Conditions for spans up to meters  ‘S’ A = S 60

‘L’ A = S 60 120

T Rqu

• S • P • W • W (1 +)

• S • B • W • S

  M Rqu

  • C • S • G

• T • P

• C ( , )

• D ( , )

• S ( z q-- x ):

- (4 , 8 ), 20 x 2.90

- 11 , 10, (2.20 , 3.35 ) q (0.50 ,0.80 rge)

- 2 , 20 x 3.00 , U-

*D Ah h E Hk

• If a bridge has one rock drum anchor and one soil beam anchor on the other side, the beam anchor is the adjustable anchor. As such,

ensure the erecon hook is aached to the beam anchor.

• If a bridge has two of the same type of anchor (beam or drum), the lower elevaon anchor is the adjustable anchor. As such, ensure the

erecon hook is aached to the lower elevaon anchor.

 

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 42/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control 

Step 1Bu B

T q q -

:

Small beams: Spans less than 60 meters• 4 , 20, 2.90 ;

• 11 q , 10, 2.20 ,

q 0.50

 

Large beams: Spans greater than 60 meters to 120m

• 8 , 20, 2.90 ;

• 11 q , 10, 3.35 ,

q 0.80

Step 2A E Hk

T 2 ONLY j. I ( ), j. I

, j . A 0.80

. A

, .

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 43/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control 

Step 3Ly u C & A Tu

L , 1.00

(x ) . D x

, . A j ,

4.00 x 6-7 (x ) . T -j- q .

Step 4P Ah B

S . T

x 45

. I

.

Step 5Pu C Ov Ah

E x

. C  

. A -

. O ,

.

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 44/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control 

Step 6C C

WI ( ) (x

) -

. E - .

Rj .

I q -j (

) 1 x ( )

- 25%

THIS IS THE MOST CRITICAL STEP OF CONSTRUCTION. DO NOT PROCEED WITHOUT

PROPER DROP-FORGED CLAMPS, SOCKETS AND WRENCH WITH CHEATER BAR.

Step 7F h Ah Exv

F x 1.0 ,

10 . D

. N x  

.

S x ( , ). T

x . R j ,

x.

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 45/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control 

4.6 Cable Installation and Anchor Construction 

Drum type (Rock Conditions)

T Rqu• S • P • W

• S • B • W

M Rqu

• C • S • G

• T • P

• C ( , )

• D ( , )

• S ( z q):

  - S 40 **

- A , 16 , 25 , 1.50

- I : 8 , 10 , 3.40 , 0.90

- O : 8 , 10 , 5.25 , 1.50

  - S 40 meters

- A , 20 , 25 , 1.50

- I : 8 , 10 , 4.15 , 1.15

- O : 8 , 10 , 5.90 , 1.70

* C I G: S S 5.5, 38

 

**S 40 :

W 40 , . T j . O

, x (360 ) j .

W 40 x 60 , . A

.

 

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 46/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control 

Step 1Exv

Ex

. I

. T x .

Step 2Bu C

P . F

10 . (N: ‘S’ z

40 , ‘L’ z 40 ).

Small Drums: Span 0 - 40 meters

• A , 16 , 25 , 1.50

• I : 8 , 10 , 3.40 , 0.85

meter diameter

• O : 8 , 10 , 5.25 , 1.45

meter diameter

Medium Drums: Span 41 - 60 meters

• A , 20 , 25 , 1.50

• I : 13 , 10 , 4.15 , 1.10meter diameter

• O : 7 , 10 , 5.90 , 1.65

meter diameter

**Large Drums: Span 61 - 120 meters

• A , 40 , 25 , 1.50

• I : 26 , 10 , 4.15 , 1.10

meter diameter

• O : 14 , 10 , 5.90 , 1.65

meter diameter

Rq D T

V

(m3)

T #

R

(25)O D I D

D. D D. R D. D D. R

160 145 100 85 6.25 16

180 165 125 110 5.18 20

180 165 125 110 5.18 40

   S   m   a    l    l

   0  -   4   0   m

   M   e    d   i   u   m

   4   1  -   6   0   m

    *    *   L   a   r   g   e

   6   1  -   1   2   0   m

**I ,

engineer

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 47/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control 

 

Step 3A E Hk

T j. I

( ), j. I , j . A 0.50

. A

.

Step 4P R

P x , ;

x 0.50 ( j

, ). P

, j . V

x ,

. T

. T

.

Step 5Ly u C

L . T 4.0  

j . T -j . F

40 , j .

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 48/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control 

Step 8

Pu h Ah Exv

F x , 10

x 50

. D . DO NOT USE FORM-WORK

BELOW GROUND. P x . T x .

R j , x. L

7 .

Step 6

Pu Wky C u Ah

E

180 . O ,

. T

, 75 .

Step 7

Clam Wky C

T

. H-

- (do not saddle a

!). H j . T

-j q

1- . I ,

q q. F 40 ,

x .

R,

j .

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 49/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control 

Step 9

Pu H C u Ah

E ( )

. O ,

. T , 50 .

Step 10

Clamp h C

T .

H- . Tq

- 25%. I ,

q - . S S V

1: D & A.

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 50/106

Quality Control Checklist: Anchor Construction & Cable Installation

Cu

W x ?

D x ?Q z ?

F x ( )?

D ?

C ?

C q -j 3- ?

N ?

N - ?

0.5 ?C - 25% ?

C ?

C ‘’ ( ).

C -?

C 75 ?

*Important 

Steel cable size veried and signed by project engineer, aached 

C f h Suv:N , q x, :

Su f E: _________________________________

Su f Suv: ________________________________ D: __________________

*This page must be copied and aached to Bridge Compleon Record upon compleon of bridge.

Pedestrian Bridge Construction Quality Control Pg 8

Quality Control: Bridge Construction Pg 8

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 51/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control 

4.7 Cable Sag Setting

T q . S

. T (L)

. T

, - , . A, . H

.

N-Ph C Less than 80 m  Greater than 80 m

D () 5.00% 4.55%

H () 4.00% 3.65%

Ry C (u f B2P )  Less than 80 m  Greater than 80 m

D () 4.75% 3.41%

H () 3.00% 3.46%

 

C () . N: . ‘’

. F H S E (x )

q:

  =(4 − ∆)

16

   =   =   =  

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 52/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control 

Important Safety Notices

Wh Sfy:

A .

A j . N .

I : A x , , x , , ; H

, , , .

Sf Z

B , “D Z”

. A “E R” . S x .

Wh Ah:

• T .• T . I

.

• T “”. T “”

.

NEVER “” under tension

.

A Sfy C:

• ONLY .

S .

• N

.• N “” .

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 53/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control 

Safe Zones

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 54/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control 

35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115

0.0 1.75 2.00 2.25 2.50 2.75 3.00 3.25 3.50 3.75 4.00 4.05 4.09 4.32 4.55 4.77 5.00 5.23

0.25 1.63 1.88 2.13 2.38 2.63 2.88 3.13 3.38 3.63 3.88 3.93 3.97 4.19 4.42 4.65 4.88 5.10

0.50 1.51 1.76 2.10 2.26 2.51 2.76 3.00 3.25 3.50 3.75 3.80 3.84 4.07 4.30 4.53 4.75 4.98

0.75 1.40 1.64 1.89 2.14 2.39 2.64 2.89 3.14 3.38 3.63 3.68 3.72 3.95 4.18 4.41 4.63 4.86

1.00 1.29 1.53 1.78 2.03 2.27 2.52 2.77 3.02 3.27 3.52 3.57 3.61 3.83 4.06 4.29 4.51 4.74

1.25 1.18 1.42 1.67 1.91 2.16 2.41 2.66 2.90 3.15 3.40 3.45 3.49 3.72 3.94 4.17 4.39 4.62

1.50 1.08 1.32 1.56 1.81 2.05 2.30 2.54 2.79 3.04 3.29 3.34 3.38 3.60 3.83 4.05 4.28 4.50

1.75 0.98 1.22 1.46 1.70 1.94 2.19 2.43 2.68 2.93 3.17 3.22 3.26 3.49 3.71 3.94 4.16 4.39

2.00 1.36 1.60 1.84 2.08 2.33 2.57 2.82 3.06 3.11 3.15 3.38 3.60 3.83 4.05 4.28

2.25 1.50 1.74 1.98 2.22 2.47 2.71 2.95 3.00 3.04 3.27 3.49 3.71 3.94 4.16

2.50 1.64 1.88 2.12 2.36 2.60 2.85 2.90 2.94 3.16 3.38 3.60 3.83 4.05

2.75 2.02 2.26 2.50 2.74 2.79 2.83 3.05 3.27 3.50 3.72 3.94

3.00 2.16 2.40 2.64 2.69 2.73 2.95 3.17 3.39 3.61 3.83

3.25 2.30 2.54 2.59 2.63 2.85 3.07 3.29 3.51 3.73

3.50 2.44 2.49 2.53 2.75 2.96 3.18 3.40 3.62

3.75 2.43 2.65 2.86 3.08 3.30 3.52

4.00 2.55 2.77 2.98 3.20 3.42

4.25 2.88 3.10 3.32

4.50 3.00 3.22

D S Ev ((

R

   H   e   i   g    h   t   D   i    f   e   r   e   n      a    l    b   e   t   w

   e   e   n   a    b   u   t   m   e   n   t   s    (   m    )

S ()

N:

*H x 5%

**S - AND B2P’

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 55/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control 

Cable Sag Setting cont’d...

T Rqu

• C • A L

• T (#1, #1) • 1- (#2)

• “T- ”: • S

Step 1

Cut Measu Sh Sk

C #1 x + 2.00 ( + 2 )

C #2 x 1.00

Step 2

F “T-v Sk”

Using 1.5 z ,

( q ). N

30 z T-

(

). P

T- .

Step 3Z Ay Lv

L z .

S

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 56/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control 

Step 4

Sk #2 (1- M Sk) S P

Place A L 1-

j . (T

).

Step 5

Mv Sk #1

A #1 ( q + 2 ) ,

A #2 ‘’ #1.

Step 6Mk P

U , #1.

Step 7

Mv Ay Mk P

T #2 , #1

#1 #2 . W A L z

1-

8 - 13.

Step 8

Ah C Wh

C

. T q

.

I Sfy N: E

.

DRUM ANCHOR NOTE: See page 52

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 57/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control 

Step 9

Th C

R A

L ( ).

I Sfy N: M

, ,

NOT .

Step 10

H-Th 2 C

A (2) - .

Step 11

Rv C Wh

D .

Step 12Whk Lv C

U , j . T

. I , 1/4

. L A

‘’ S 6.

Step 13Mk C S

U , . Note dierence in cable

shi from marks. If more than ½”, ghten cable and re-do.

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 58/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control 

Step 14A below is for Beam Anchors

See page 51 for Drum Anchor Step 14B Process

Step 14a Beam Anchor 

A C F Wky C

A q ‘’ , q . T

- 25%

. A 3 x q

q.

Th Wky C

S

q “T- .” S “T- ” . I ,

.

A C R Wky C

A q ‘’ , q .

Repe Pu f H CR . B #1 1.1 #1

() .

Connue to page 53.

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 59/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control 

Steps below are an extended Step #14B for Drum AnchorsI Sfy N: R 49 S 8 S 9.

Step 14B Drum Anchor 

(Rock conditions, for Beam Anchors see Previous Page) NOTE ON STEP 8 FOR DRUM: C

C Thv

C #1 C #1, C #2 C #2

.

Ah Ty C P

O

5

.

Rv Ty C

R - .

Tf C #2

O . W

C #1.

Mv h f C #1 C #2

R C #1 C #2. C C #1 C #2 (2) -

C #2. R

C #2 C #2 C #1 .

Rv Ex C

R x 15 51.

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 60/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control 

4.8 Cable Clamp Installation

Clamp Materi P

P q (

) q . I ,

. T

q q q (-

).

T B P q

q -

. C

.

D-f f u quy u uh

hv .

M

. I - , z

1 1/8” . N q q

-

. T

q - . A , ,

.

C able Diamter C able Diameter S pacing

(mm) (inch) (mm) Quaninty Required Torque (foot-lbs)

3.2 1/8 19.2 2 4.5

4.8 1/5 28.8 2 7.56.4 1/4 38.4 2 15

7.9 1/3 47.4 2 30

9.5 3/8 57 2 45

11.1 4/9 66.6 2 65

12.7 1/2 76.2 3 65

14.3 4/7 85.8 3 95

15.9 5/8 95.4 3 95

19.1 3/4 114.6 4 130

22.2 7/8 133.2 4 225

25.4 1 152.4 5 225

28.6 1 1/8 171.6 6 225

31.8 1 1/4 190.8 7 360

34.9 1 3/8 209.4 7 360

38.1 1 1/2 228.6 8 360

41.3 1 5/8 247.8 8 430

44.5 1 3/4 267 8 590

50.8 2 304.8 8 750

57.2 2 1/4 343.2 8 750

63.5 2 1/2 381 9 750

69.9 2 3/4 419.4 10 750

76.2 3 457.2 10 1200

88.9 3 1/2 533.4 12 1200

Drop-Forged Clamps

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 61/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control

 

C Tqu & S

T q q - q 3

x x . A

300 - q 3-

. I 3-

.

I q , q

. R

q . T -

x 25%.

C -

‘’ . T

53.

H q

  

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 62/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control

 

4.9 Cable Care

U C

T . K

. F, .S . U

.

Fi Tu h Gu

A ,

x . A

-

.

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 63/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control

 

R T OR A- C h Ly Uu

T x x 5 - (

). T

.

L Bk Ex C

T , x

.

C (

).

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 64/106

Quality Control Checklist: Setting Sag and Cable Care

X

S S

H (B) (L) ( /100) = __________L : = ___________ ( )

C “T- ” ?

V :

C q 3- q ?

A ?

C C

T , ?

C 5 ?

Ex ?

N-z - ?

C f h Suv:

N , q x, :

Su f E __________________________________

Su f Suv: ________________________________ D: __________________

*This page must be copied and aached to Bridge Compleon Record upon compleon of bridge

Quality Control: Bridge Construction Pg 9

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 65/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control

 

T Rqu

• S • P

• S • B

M Rqu

  • C • S • G

• T • B

Step 1Bu Ah W

S x.

D 25 40 . I 

, . B 35

1.00 . I ,

35 .

Step 2Bk A

F ,

. E .

Step 3C

T , 10 . T

j . F , , 10 .

Step 4Fh

A ,

. T x

.

4.10 Bridge Approach Construction

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 66/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control

 

4.11 Wood Deck Installation

T Rqu

• H • W •C

• W • H

• 2 ( )

M Rqu

• C • D •‘N’ P*

• Gz S: 70 ” x 10

• S ,

- (T (S + 1) ), 8 ,

1.80

C

T ; 1)

, 2) , 3) .

T ,

-

. T ‘’

z q. I

.

Wood Crossbeam w/ A Nailer

(Recommended) Wood Crossbeam w/o A Nailer Steel Crossbeam w/ a Nailer

S

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 67/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control

 

Step 1Dk P

C ( 1) 136 - .

T . S V 3, P 2: S

B C D. F , 30 , 31

q.

C 3.0 60 . I

60 , 2.0 . T

q [ ( 2.0 3.0)]

(5), , 15 - 25 . I ‘’

, ( 1) q, 1.0 .

Step 2Su P

C 8.0 1.8 . T  

q q ( 1). F , 30 q

62 . T , .

Step 3Ah N P C (N R)

I ‘’ , ( 1) 1.0 . A ‘’

(4) z , .

T x 36 .

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 68/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control

 

Step 4I C

T

. I .

T

x . Tx (2)

. T

. S .

Step 5Cu Dk P

C . I 2.0 ,

(2) 1.0 . I 3.0 , (1) 1.0

(1) 2.0 .

Step 6S Dk

P 1.0 . P

1.0 1.0 . B 3

(2) . S ,

, ,

.

P ‘ ’ z , .

Correct Not Correct

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 69/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control

 

Step 7S Dk P

U 10 z , ,

. I

- . T q .

Step 8Ly Dk

C , (3) (4)

.

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 70/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control

 

4.12 Deck Approach

T Rqu

• H • W

• W • H

• 1/2” ( )•C

M Rqu

• D • 1

T ‘’  

. T

z.

T ,

q . E

,

. A

q , ‘’ ( )

. T j, q

. R .

A , . A

.

 

NB. T q B2P

.

Walkway Tower tube detail

4.13 Fencing Installation

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 71/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control

 

T Rqu

• W C

• P

M Rqu

  • Gz • U-

• Gz T

Step 1U F

U . S

. R

.

Step 2T

C x .

Step 3Ah Dk

T . U-

.

Step 4Ah H C

P .

Step 5Su Su

T , . I

x 1.50, x

.

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 72/106

Quality Control Checklist: Bridge Completion

X

Ah

W 50 ?

W 10 ?

W x ?

Dk D ?

W ?

S ?

F q ?

*Important 

Bridge Compleon Record completed by Engineer and submied to all relevant pares

with Quality Control records copied and included? 

C f h Suv:

N , q x, :

Su f E ______________________________________

Su f Suv: ______________________________________ D: __________________

*This page must be copied and aached to Bridge Compleon Record upon compleon of bridge.

Quality Control: Bridge Construction Pg 10

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 73/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control

 

Section :Bridge Completion

T B R A-B

. A

j. B P . B j, - q - , q

. A , B R B2P q - ,

. A S 5 .

. Bridge Registry 

T B R . T

j. T z , .

F,

. A

. T R j

.

. Socioeconomic Implications

P . M ,

. B ,

( j -- V 2).

T ,

. I ,

. T ,

. I , .

**P u u h B R F S I f B Py ( f

.BPy.). Th f fu h “Cu Du” h f Vu 3.

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 74/106

 Volume 3: Suspended Part 3 Construction Guide & Quality Control

 

. Picture Inventory 

T j q ,

. T . A

,

. Th h B2P u u u.

Picture Submission RequirementsS

P ( )  L

Exv

C x

D

A

Fu T & TC

R

C

S

I

Ah

C

C- , z

C x

C A

S S

B “T”

C

Tq q

R

T x ( )

T

A- /

Ah

T ( )

C

I ,

Dk

I V

C

I

 C B

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 75/106

Construction Forms

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 76/106

Pedestrian Bridge Registration

B N: _________________________________

L (GPS):  _______________________________

C:  _______________________________R, C:  _______________________________

E ():  _______________________________

I A: ______ _________________________

F S:  _______________________________

A C S D: ____________________

F Suv Su: _____________________

Attach Picture of Site

Bridge Register Pg

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 77/106

Bridge Design 

Basic Data

T: : S /S

S: : _____ / _____

W W: : 1.00

S : ___________________________

D : ___________________________

D T : _______________

A T : R [ ]: B / D

: L [ ]: B / D

Aj B : R / L

F : ______

Bridge Register Pg

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 78/106

Technical Data 

C S : ___________________________

C Sz/N : H C: ___ x ___ / __”

:D C: ___ x ___ / __”C S/ : _________ / _________

C : Gz / B

C : F / M

C / : _____

F ( ): ___________________________

Th C

F I y: _____________________________

Bridge Register Pg

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 79/106

Cu P

S : _____________________ T: ___________________

M/ : _____________________ T: ___________________

Cu V

V D / M

B C M

N V

Au F Cu

I A ($ / / )

M

C

Bridges to Prosperity

O

A C/R

B R C B: __________________________________

Bridge Register Pg

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 80/106

Post-construction Socioeconomic Survey;The impact of Pedestrian Bridges

A . F q ,  

; 30 , 70 q ,

.

G If 

B :

C : ___________________________

R : ___________________________

V : ___________________________

B P: ___________________________

C S:

S C :_______________________ D:_____________

Socioeconomic Survey Pg

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 81/106

Food Security Information

N q :

N q :

W ?

D :

D :

Auu vy

T :

N / :

Q :

H ?

W x ?

P :

H q ?

H q (, …)?

A A F S ?

Socioeconomic Survey Pg

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 82/106

Trade and Economic Information

L :

D ?:

Sz ( ):M q:

M x :

R :

C :

I / :

A :

H / :

L ( ):

Eu If

D ( ) ? D ?

H ?

H 6?

Ex ?

A T / E :

I Price

Socioeconomic Survey Pg

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 83/106

Eu If

D ( ) ? D ?

H ?

H 6?Ex ?

A T / E :

Health Information

D ( ) :

W - ?

D ( ) q ?

W - ?

D ( , …)?

H ?

H ?

Socioeconomic Survey Pg

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 84/106

Health Information (continued)

A ?

A ?

I HIV/AIDS ?D ( ) :

W - ?

N - :

A :

S If

H ?

H ?

H ?

H ?

A ?

H ?

A Hh / S :

Socioeconomic Survey Pg

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 85/106

Participation Assessment

W , z ?

W j ?

H q j?I , (, , .)?

W ?

I j?

W ?

A ?

W ?

I z ?

H ?

I , :

W ?

W ?

Socioeconomic Survey Pg

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 86/106

Materials List:

X Material item Quy

Rqu

D f 

vy

site

Notes

L M

S

B S

D S

G

C M

C

M

S 12

S , 14

S , 18

S , 20

S , 25

H S

P W S A I &

(20 )B T, 2”

T W

Quality Control: Bridge Construction Pg 2

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 87/106

Tool List:

Material item Q u y

Rq’ x

Material item Quy Rq’

x

S 4 H 5

P 2 100 1

Ex 1 B see drawings

W 2 S see drawings

20 (5 ) 6 R see drawings

M 1 C S & C 1

M , 5 2 R 4

M ( ) 2 sets R 5 liters

W 1 F 20

H x 2 V 2

2 1 R 4

4 ( ) 1 4” min. 1 per

crossbeam

W; 3 , z

2 N 1000

H ;

z.

1 A 1

M 1 D 4

10 1

S 1

P 1

P 1

T 1

Pliers 1

Quality Control: Bridge Construction Pg 3

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 88/106

Quality Control Checklist: Material Preparation

X

Local materials

I ?

I 7 , ?

I z?

I ?

I ?

Cu M

I ?

A ?

C f h Suv:

N , q x, :

Su f Suv: ________________________________ D: __________________

  *This page must be copied and aached to Bridge Compleon Record upon compleon of bridge.

Quality Control: Bridge Construction Pg 4

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 89/106

Quality Control Checklist: Site Preparation

X

Lyu

S ?

C ?

P ?

Ex ?

Exv

Ex ( h u h + )?

Ex ?

N x?

I x, ?

C f h Suv:

N , q x, :

Su f Suv: ________________________________ D: __________________

  *This page must be copied and aached to Bridge Compleon Record upon compleon of bridge.

Quality Control: Bridge Construction Pg 5

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 90/106

Quality Control Checklist: Foundation & Tier Construction

X

Fu

F q ?

F ( )?

S 1.0 ?

N x ?

T/

E ?

E z , ?

A 30 x?

*If as-built height dierence between the two towers exceeds 5% of span (L/25), in-

crease number of ers before connuing with tower construcon. 

C f h Suv:

N , q x, :

Su f Suv: ________________________________ D: __________________

*This page must be copied and aached to Bridge Compleon Record upon compleon of bridge.

Quality Control: Bridge Construction Pg 6

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 91/106

Quality Control Checklist: Tower Construction

X

P-Cu

C ?

A (H) ?

Cu H q 1.10

W ?

H ?

R : z,

C f h Suv:

N , q x, , :

Su f Suv: _____________________________ D: __________________

*This page will be copied and aached to Bridge Compleon Record upon compleon of bridge.

Quality Control: Bridge Construction Pg 7

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 92/106

Quality Control Checklist: Anchor Construction & Cable Installation

Cu

W x ?

D x ?

Q z ?

F x ( )?

D ?

C ?

C q -j 3- ?

N ?

N - ?

0.5 ?

C - 25% ?

C ?

C ‘’ ( ).

C -?

C 75 ?

*Important 

Steel cable size veried and signed by project engineer, aached 

C f h Suv:N , q x, :

Su f E: _________________________________

Su f Suv: ________________________________ D: __________________

*This page must be copied and aached to Bridge Compleon Record upon compleon of bridge.

Quality Control: Bridge Construction Pg 8

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 93/106

Quality Control Checklist: Setting Sag and Cable Care

X

S S

H (B) (L) ( /100) = __________

L : = ___________

C “T- ” ?

V :

C q 3- q ?

A ?

C C

T , ?

C 5 ?

Ex ?

N-z - ?

C f h Suv:

N , q x, :

Su f E __________________________________

Su f Suv: ________________________________ D: __________________

*This page must be copied and aached to Bridge Compleon Record upon compleon of bridge

Quality Control: Bridge Construction Pg 9

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 94/106

Quality Control Checklist: Bridge Completion

X

Ah

W ?

W 5 ?

W x ?

Dk D ?

W ?

S ?

F q ?

*Important 

Bridge Compleon Record completed by Engineer and submied to all relevant pares

with Quality Control records copied and included? 

C f h Suv:

N , q x, :

Su f E ______________________________________

Su f Suv: ______________________________________ D: __________________

*This page must be copied and aached to Bridge Compleon Record upon compleon of bridge.

Quality Control: Bridge Construction Pg 10

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 95/106

Quality Control: Photographic Inventory 

B N: _________________________________

L (GPS):  _______________________________

C:  _______________________________

R, C:  _______________________________

E ():  _______________________________

I A: ______ _________________________

F S:  _______________________________

B C D: __________________________

S:  __________________________

D f : _________________________

Attach Picture of completed bridge

Pedestrian Bridge Construction Quality Control Photographic Inventory Pg 1

Q C P I

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 96/106

  Quality Control Photographic Inventory 

T ,

, .

Pedestrian Bridge Construction Quality Control Photographic Inventory Pg 2

Picture Submission RequirementsS

• P ( )

• L

Exv

• C x

• D

• A

Fu T & T• C

• R

• C

• S

• I

Ah

• C

• C- , z

• C x

• C A

S S

• B “T”

• C

• Tq q

• R

• T x ( )

• T

• A- / Ah

• T ( )

• C

• I ,

Dk

• I

• V

• I

 C B

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 97/106

Pedestrian Bridge Construction Quality Control Photographic Inventory Pg 3

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 98/106

Pedestrian Bridge Construction Quality Control Photographic Inventory Pg 4

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 99/106

Pedestrian Bridge Construction Quality Control Photographic Inventory Pg 5

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 100/106

Pedestrian Bridge Construction Quality Control Photographic Inventory Pg 6

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 101/106

Pedestrian Bridge Construction Quality Control Photographic Inventory Pg 7

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 102/106

Pedestrian Bridge Construction Quality Control Photographic Inventory Pg 8

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 103/106

Pedestrian Bridge Construction Quality Control Photographic Inventory Pg 9

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 104/106

Pedestrian Bridge Construction Quality Control Photographic Inventory Pg 10

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 105/106

Quality Control: Completed Bridge Inspection

B N: _________________________________

L (GPS):  _______________________________

C:  _______________________________

R, C:  _______________________________

E ():  _______________________________

I A: ______ _________________________

F S:  _______________________________

B I: _____________________________

S:  _____________________________

D: _________________________

Attach Picture of completed bridge

Quality Control: Completed Bridge Inspection Pg 1

Quality Control Inspection Check-list: Bridge Completion

7/27/2019 Suspended Manual-English-Volume 3-Part 3 - Construction Manual

http://slidepdf.com/reader/full/suspended-manual-english-volume-3-part-3-construction-manual 106/106

Quality Control Inspection Check list: Bridge Completion

A- q:

= __________________ .

M xX: = ______________; = ______________; X =

 ___________.

C .

C .

C q : q __________________ .

F x . A q x A - .325%* .

A ( ): P _______________________ .

C . C - .

C - .

D : D = ___________________________________ .

I & - x - .

A .

V : = __________.