Post on 20-Mar-2020
STEEL CULVERTS AND STRUCTURAL PLATES 08012
CONTRACTOR INFORMATIONLEGAL BUSINESS NAME Contech Engineered Solutions
Company Internet URL Address www.conteches.com
Company Ordering/Mailing Address:
Contech Engineered Solutions
11835 NE Glenn Widing Dr.
Portland, OR 97220
Payment to be sent to:
Contech Engineered Solutions LLC
16445 Collections Center Dr.
Chicago, IL 60693
Authorized Sales Representative and Usage Reports
Name: Ken Wake
Phone: 360-609-1634
Fax: 866-508-9920
Email: kwake@conteches.com
Additional Sales Representative
Name: Trevis Jordan
Phone: 972 590-2025
Fax: 972 590-2039
Email: tjordan@conteches.com
MAP BELOW IS FOR DNR REGIONAL USE ONLY
Current Contract InformationContract No. 08012 Steel CulvertsPage 2
REGIONS
Below is a list of DNR regions and the counties included in the DNR regions for non-DNR Purchasers. Oregon is included as a seventh “region” in the Price Sheet.
DNR Regions Counties Assigned to DNR Regions for non-DNR PurchasersOlympic Clallam, Jefferson, Mason, Kitsap, Grays Harbor
Pacific Cascade Pacific, Lewis, Skamania, Clark, Cowlitz, Wahkiakum
Current Contract InformationContract No. 08012 Steel CulvertsPage 3
Northwest Whatcom, Skagit, Snohomish,South Puget Sound King, Pierce
Northeast Okanogan, Ferry, Stevens, Pend Oreille,Southeast Chelan, Douglass, Grant, Lincoln, Spokane, Kittitas, Adams, Whitman,
Yakima, Benton, Franklin, Walla Walla, Columbia, Garfield, Asotin, Klickitat
Not Serviced San Juan – Not currently part of this contract as Bid.
Oregon is included as a seventh “region” in the Price Sheet (See attachment in Contract Pricing Section below).
Purchase Cards: YES: Visa, MasterCard Minimum Orders: None (Special)- See Freight terms belowDeposits: None- This contract is not subject to a deposit rule. Payment Terms: No Prompt Payment Discount.
Shipping Terms:
FOB Destination - CMPShipping
Culverts are not to be nested for shipping.
Offloading of delivered culverts will be provided by Purchaser.
Culvert Supplier will give 48 hours advance notice of delivery to Purchaser.
FOB Plant – Structural PlateShipping
Prepaid and add per structural plate freight sheet.
Freight
CMP
There will be no minimum order requirements. However, for total orders under $5,000.00, freight may be prepaid and added to the invoice.
Structural Plate – Prepaid and add per order
Contract Pricing:
Pricing Per region (See Attachment Below)
A Vendor Management fee of 1.5 Percent will be added on to the cost as a separate line item.
Current Contract InformationContract No. 08012 Steel CulvertsPage 4
Technical Specs
Corrugated Metal Pipe (CMP) will meet the requirements of AASHTO M 36-03 Corrugated Steel Pipe, Metallic-Coated, for Sewers and Drains except as modified by the embedded specifications below. The term “corrugated metal pipe” as used in this contract includes both Type I and Type II pipe.
Because of idiosyncrasies of MS Word, it is necessary to click the embedment below and any pop ups several times to open it.
CCI HISTORY:RevisionDate:
EffectiveDate: CCI # & DESCRIPTION
11/7/14 11/7/14 Administrative Update
N/A 12/17/2012CCI 01: Contract Award: Agreement signed by the State on 12/7/12 with Contech Engineered Solutions. Contract awarded, the effective date is 12/17/12 and runs for 12 months.
12/9/2013 1/25/2014
CCI 02: Contract extended, Effective dates 1/25/2014 to 1/24/2016. Extension amendment attached.
3/27/2013 7/1/2013
Amendment 1 (2)- Management Fee:
3/28/2014 5/1/2014 Amendment 3- Items Addition for Steel Structural Plates:
Current Contract InformationContract No. 08012 Steel CulvertsPage 5
3/30/2015 3/30/2015
Amendment 4-Update section 1.2 Purchasers:
7/01/2017
Amendment 5- Vendor Management Fee and Extension
: