ß ß Data Science Incubator. This morning Context: A Data Science Environment Data Science Studio...

Post on 28-Dec-2015

217 views 2 download

Tags:

Transcript of ß ß Data Science Incubator. This morning Context: A Data Science Environment Data Science Studio...

ß

Data Science Incubator

This morning

• Context: A Data Science Environment• Data Science Studio• Pilot Incubator Program• Discussion

2

A 5-year, $37.8 million cross-institutional collaboration

3

Establish a virtuous cycle

• 6 working groups, each with • 3-6 faculty from each institution

Pilot Program Organizers

• Andrew Whitaker, Research Scientist• Dan Halperin, Director of Research, Scalable Data Analytics• Jake Vanderplas, Director of Research, Physical Sciences• Bill Howe, Associate Director

5

The Data Science Studio

• An open collaborative research space• A resident data science team

– Permanent staff of ~5 data scientists – applied research and development– ~15-20 data science fellows (research scientists, visitors, postdocs, students)

• How to Engage:– Drop-in open workspace– Studio “Office Hours”– Incubation Program

…plus seminars, sponsored lunches, workshops, bootcamps, joint proposals...

6

7

6th floor Physics Astronomy Building

A partnership among …

• Provost• UW Libraries• Physics, Astronomy,

Arts & Sciences• eScience Institute

8

Estimated Timeline:• Design Phase Jan-June• Construction June – Sep• Target: October 1, 2014

Incubator Program Overview

• Goal: Create watercooler opportunities and scale our efforts by co-locating collaborations from different fields in the studio

• Protocol: ~1-page proposals for 1-quarter, on-site data science collaborations with us

• What we're looking for: Projects where fruitful collaboration is possible, with potential for significant impact, and that have sustained engagement

• This meeting: Pilot program for Spring Quarter to inform full launch Fall 2014.

9

http://data.uw.edu/incubator

Spring Incubator Pilot Program Logistics

• Applications due online 3/10• Each proposal identifies a Project Lead (PL)

– The person doing the work, not the thesis advisor

• Incubator participants join the studio 2 days/week– Days decided collectively by participants and team

• Pilot program operates out of Sieg 326• Milestones at 3, 6, 9 weeks

– blog posts + demo, visualization, IPython notebook, dataset, GitHub repo, preliminary results, etc.

• Networking/poster session during 9th week

10

Areas of interest• scalable data management and analytics• learning and predictive models• interactive visualization• parallel algorithms• code review, publishing, and reproducibility• online teaching materials, tutorials

11

A Live SeaFlow Dashboard

12

Laser

Microscope Objective

Pine Hole Lens

Nozzle d1

d2

FSC (Forward scatter)

Orange fluo

Red fluo

Francois Ribalet

Jarred Swalwell

Ginger Armbrust

SeaFlow Ambitions• SeaFlow is a huge success! NSF wants one on

every R/V

13

SeaFlow Ambitions• Underway biology should enable adaptive

sampling - a sort of “holy grail”

• How can remote collaborators participate?• What about citizen science?

14

“Wait! We saw a populationchange between P3 and P4!”

“Let’s go back!”

A Live SeaFlow Dashboard

15

Is the instrumentworking?

Where is the ship?What is it doing?

What phytoplankton populations are we seeing?

The AscotDB Project

16

• A multi-year collaboration between UW Astronomy and UW Computer Science researchers and students

• ASCOT = the AStronomy COllaborative Toolkit

• Goal: Provide an interactive and collaborative environment for analysis of astronomical data.

The AscotDB Project

17

• Interacting browser-based widgets for generating database queries & associated visualization.

• The resulting visualizations can be shared with collaborators through a browser URL

Pilot cohort desiderata

• good clustering• alignment with sponsor and program goals• new directions, new questions• availability, engagement, commitment• “do only what we can only do together”

– with apologies to Djikstra

• clarity and shovel-readiness• capacity for measurable outcomes

18

Spring Schedule

• 3/10: Proposals due• 3/14: Follow-up requests• 3/21: Pilot participants notified• 3/31: Spring program start date• 4/21: First milestone• 5/12: Second milestone• 6/2: Third milestone• 6/6: Poster/networking event

19