Signed Sealed Delivered with Postnord

Mats Malmberg, Data Analyst

What you can do with telematics if you have a large set of cars

• Planning of infrastructure

• Identify traffic risks

• Traffic information

• Map information

• Measuring of radio Coverage

Can we find one M2M solution that can provide several parallell revenue streams?

Problem

Let’s try and see what happens!

Solution

Results

Low sample rate introduces a large uncertainty

Office 1 Office 2 Office 3

Total number of stops 1076 680 718

Total stop time 40.7 22.4 47.6

Total time 136 119 129.2

Average stop duration 136.1 118.6 2387.1

longest stop 5595 2327 8035

Shortest stop considered 30 30 31

Percentage idle 29.9% 18.8% 36.8%