TANGGUH GPF PROJECT
WELLHEAD CONTROL PANEL
SPECIFICATION
2 15 Aug 06 AGP Re-Issued Approved LR CPL/PB
1 21 Oct 05 AGP Re-Approved LR ZS/PB0 31 May 05 AGP Approved LR ZS/PB
C 17 May 05 AGP Reissue for COMPANY Approval LR ZS/PB
B 02 May 05 AGP Issue for COMPANY Approval LR ZS/PB
A 15 March 05 AGP Issue for COMPANY Review LR ZS/PB
CHECK APPR SPEC REPS
Tangguh Development
2
REJECTED TO BE RESUBMITTED
FOR REVIEW
APPROVED/ACCEPTED WITHCOMMENTS
APPROVED
RE-ISSUED AT STATUS C
A
TANGGUH GPF PROJECTDOCUMENT APPROVAL STATUS
DOCUMENT CLASS
B
C
8/13/2019 Specification for Whcp (Gpf & Osf) _ 9500-Spe-cs-5003!2!0001
http://slidepdf.com/reader/full/specification-for-whcp-gpf-osf-9500-spe-cs-500320001 2/27
BP BERAU LTD
TABULATION OF REVISED PAGES
SHEET REVISIONS SHEET REVISIONSA B C 0 1 2 A B C 0 1 2
1 X X X X X X 51
2 X X X X X X 52
3 X X X X 53
4 X X 54
5 X X 55
6 X X X X 56
7 X X 57
8 X X X 58
9 X X 59
10 X X X 60
11 X X X X 61
12 X X X X X 62
13 X X X X 63
14 X X X X 64
15 X X X X X 65
16 X X X X X 6617 X X X X 67
18 X X X X 68
19 X X X 69
20 X X 70
21 X 71
22 X 72
23 X 73
24 X 74
25 X X X 75
26 X X 76
27 X 77
28 78
29 79
30 80
31 81
32 82
33 8334 84
35 85
36 86
37 87
38 88
39 89
8/13/2019 Specification for Whcp (Gpf & Osf) _ 9500-Spe-cs-5003!2!0001
http://slidepdf.com/reader/full/specification-for-whcp-gpf-osf-9500-spe-cs-500320001 3/27
BP BERAU LTD
DESCRIPTION OF CHANGES
Section
Affected
Description of Change Rev
All Issued for COMPANY Review A
Issued For COMPANY Approval B
Contents Updated B
2.0 Term and Abbreviation updated C
3.0 Standards and Code updated and added B
5.0 Humidity and wind changed B
6.0 Hydraulic valve control panel for LVO deleted B
7.0 Pressure transmitter and EEX “e” certified of junction box
added
C
8.0 Panel Enclosure updated C
9.0 Panel Instrumentation updated C
9.2 WHCP ESD sequence updated C
10.0 Tubing Installation updated C
11.0 Panel numbering and size of name plate added B
12.0 Cleanliness added B
13.0 Inspection and Testing added B
14.0 Factory Acceptance Test (FAT) updated B
15.0 Site Acceptance Test added B
17.0 Documentation and Requirement updated B
18.0 Attachment added B
18.1 Attachment-1 : WHCP Schematic Diagram (Control Module
Drawer Typical) updated
C
18.2 Attachment-2 : WHCP Schematic Diagram (Common
Module Bypass Drawer Typical) added
2
18.3 Attachment-3 : Typical WHCP Layout added B
1.0 Scope Updated 1
4.3 BP Guidelines updated 1
6.0 Area Classification updated 1
7 0 General updated 2
8/13/2019 Specification for Whcp (Gpf & Osf) _ 9500-Spe-cs-5003!2!0001
http://slidepdf.com/reader/full/specification-for-whcp-gpf-osf-9500-spe-cs-500320001 4/27
BP BERAU LTD
CONTENTS
Description Page No
Front Page 1
Tabulation of Revised Pages 2
Description of Changes 3
Table of Contents 4
1.0 SCOPE 5
2.0 TERMS AND ABBREVIATIONS 6
3.0 STANDARDS AND CODES 7
4.0 REFERENCES 8
4.1 PROJECT SPECIFICATION 8
4.2 PROJECT DRAWINGS 8
4.3 BP GUIDELINES 8
5.0 ENVIRONMENTAL CONDITION 9
6.0 AREA CLASSIFICATION 10
7.0 GENERAL 11
8.0 PANEL ENCLOSURE 14
9.0 PANEL INSTRUMENTATION 15
9.1 PANEL DESIGN CRITERIA INTERFACE WITH HYDRAULIC SYSTEM 15
9.2 WHCP ESD SEQUENCE ADDED 16
9.3 WHCP "OFFLINE BYPASS" FEATURE 16
9.4 WHCP "OUT-OF-SEQUENCE" FEATURE 16
10.0 TUBING INSTALLATION 17
11.0 NAMEPLATE AND TAGGING 18
12.0 CLEANLINESS 19
13.0 INSPECTION AND TESTING 20
8/13/2019 Specification for Whcp (Gpf & Osf) _ 9500-Spe-cs-5003!2!0001
http://slidepdf.com/reader/full/specification-for-whcp-gpf-osf-9500-spe-cs-500320001 5/27
8/13/2019 Specification for Whcp (Gpf & Osf) _ 9500-Spe-cs-5003!2!0001
http://slidepdf.com/reader/full/specification-for-whcp-gpf-osf-9500-spe-cs-500320001 6/27
BP BERAU LTD
2.0 TERMS AND ABBREVIATIONS
COMPANY BP BERAU LTD
CONTRACTOR SAIPEM (EPC Contractor)
ESD Emergency Shutdown System
WSD Well Shutdown
TWSD Total Well Shutdown
SCSSV Surface Controlled Sub-surface Safety Valve
SMV Surface Master ValveSWV Surface Wing Valve
FAT Factory Acceptance Test
SAT Site Acceptance Test
WHCP Wellhead Control Panel
HPU Hydraulic Power Unit
8/13/2019 Specification for Whcp (Gpf & Osf) _ 9500-Spe-cs-5003!2!0001
http://slidepdf.com/reader/full/specification-for-whcp-gpf-osf-9500-spe-cs-500320001 7/27
BP BERAU LTD
3.0 STANDARDS AND CODES
All work performed inside this panel shall comply with applicable sections of the latest edition of
the following standards and codes:
• Instrumentation System and Automation Society (ISA)
• American National Standards Institute (ANSI)
• American Petroleum Institute (API)
• International Electrotechnical Commission (IEC)
• UL, CENELEC, BASEEFA
8/13/2019 Specification for Whcp (Gpf & Osf) _ 9500-Spe-cs-5003!2!0001
http://slidepdf.com/reader/full/specification-for-whcp-gpf-osf-9500-spe-cs-500320001 8/27
BP BERAU LTD
4.0 REFERENCES
4.1 PROJECT SPECIFICATION
9000-SPE-CS-0001 General Instrument Specification
9000-SPE-CS-0004 General Instrument Installation
9000-SPE-EL-0001 General Electrical Specification
9000-SPE-CS-0005 Instrument Testing and Calibration
9000-DBS-CS-3000 Instrument and Control Design Criteria
9500-SPE-CS-5001 Distributed Control System
9500-SPE-CS-5002 Safety Instrumented System
9500-SPE-CS-5004 Hydraulic Power Package Unit
9000-SPE-ST-0002 Environmental Design Criteria
9000-DBS-MM-0001 Source and Factory Inspection Basis of Design
GS 106-2 General Painting Specification
4.2 PROJECT DRAWINGS
2100-PID-PS-5004 VR-A PID Wellhead Control Panel A
2100-PID-PS-5005 VR-A PID Wellhead Control Panel B
2200-PID-PS-5004 VR-B PID Wellhead Control Panel A
2200-PID-PS-5005 VR-B PID Wellhead Control Panel B
8/13/2019 Specification for Whcp (Gpf & Osf) _ 9500-Spe-cs-5003!2!0001
http://slidepdf.com/reader/full/specification-for-whcp-gpf-osf-9500-spe-cs-500320001 9/27
BP BERAU LTD
5.0 ENVIRONMENTAL CONDITION
The climatic conditions specific for this project are defined in “Specification for Environmental
Design Criteria” 9000-SPE-ST-0002.
The equipment furnished shall be suitable for the following environmental conditions:
• Atmosphere : Corrosive, salt-laden, humid, tropical marine
• Ambient Temperature : Max. 40°C, Min. 20°C
• Operating Area temperature : Max. 56°C , Min 20°C
• Humidity : Max. 100% relative Min. 50% relative
• Wind : Normally low subject to squall winds up to 37 m/s
• Seismic : Earthquake-prone area, design ± 0.7 g vertical and all planeshorizontal acceleration.
8/13/2019 Specification for Whcp (Gpf & Osf) _ 9500-Spe-cs-5003!2!0001
http://slidepdf.com/reader/full/specification-for-whcp-gpf-osf-9500-spe-cs-500320001 10/27
BP BERAU LTD
6.0 AREA CLASSIFICATION
Wellhead Control Panels will be located at the Mezzanine Deck. Hydraulic control panels arelocated in a classified area. All electrical and instrument components of control panels shall be
certified for use in an IEC 60079 Class 1, Zone 1, Gas Group IIA, Temp. class T3 minimum area
classification with IP 65 minimum.
8/13/2019 Specification for Whcp (Gpf & Osf) _ 9500-Spe-cs-5003!2!0001
http://slidepdf.com/reader/full/specification-for-whcp-gpf-osf-9500-spe-cs-500320001 11/27
BP BERAU LTD
7.0 GENERAL
The following is a list of panel (2100-V-1001A1002A) and associated valves for VR-A (typical for
6 flowlines & 2 spare flowlines) :
No. WHCP/HPU
Tag No.
Valve Tag No. Description
1 2100-V-
1001A1002A
2101-XV-1005 SCSSV Wellhead #1
2101-XV-1008 SMV Wellhead #1
2101-XV-1009 SWV Wellhead #1
2102-XV-1005 SCSSV Wellhead #2
2102-XV-1008 SMV Wellhead #2
2102-XV-1009 SWV Wellhead #2
2105-XV-1005 SCSSV Wellhead #5
2105-XV-1008 SMV Wellhead #52105-XV-1009 SWV Wellhead #5
2106-XV-1005 SCSSV Wellhead #06
2106-XV-1008 SMV Wellhead #06
2106-XV-1009 SWV Wellhead #06
2110-XV-1005 SCSSV Wellhead #10
2110-XV-1008 SMV Wellhead #102110-XV-1009 SWV Wellhead #10
2111-XV-1005 SCSSV Wellhead #11
2111-XV-1008 SMV Wellhead #11
2111-XV-1009 SWV Wellhead #11
The following is a list of panels and associated valves for VR-B typical for 6 flowlines installed
and 2 flowlines spare to be associated by 2200-V-1001A 1002A and typical for 3 flowlines
installed and 5 flowlines spare to be associated by 2200-V-1001B 1002B :
8/13/2019 Specification for Whcp (Gpf & Osf) _ 9500-Spe-cs-5003!2!0001
http://slidepdf.com/reader/full/specification-for-whcp-gpf-osf-9500-spe-cs-500320001 12/27
8/13/2019 Specification for Whcp (Gpf & Osf) _ 9500-Spe-cs-5003!2!0001
http://slidepdf.com/reader/full/specification-for-whcp-gpf-osf-9500-spe-cs-500320001 13/27
BP BERAU LTD
• Common Module Bypass
Local common module bypass facility shall be provided for any well control module which
is removed for service maintenance.
• Automatic Shutdown (ESD, WSD & TWSD) of each Master and Wing Valve on loss of
individual control signal.
• Automatic shutdown (ESD) of each SCSSV on loss of control signal.
• Pressure transmitters (Smart HART protocol)
• Junction Boxes (EEx “e” certified, IP 66)
• All cabling should be Flame Retardant, detail see cable specification (9500-SPE-CS-5009).
b) Wellhead control modules shall be designed to be interchangeable (removable drawers), easy
to remove and to have a minimum number of tubing connections. Any well module can be
easily isolated and removed without affecting the operation of any other of the well control
panel. Each well control module shall provide the following functions :
• Drawer type complete with top and bottom handles.
• Local manual close / shutdown of SCSSV, Master and Wing valve (pull to open, push to
close).
• Dedicated hydraulic pressure gauge on front of panel for control supply indication to
SCSSV, Master and Wing valves.
8/13/2019 Specification for Whcp (Gpf & Osf) _ 9500-Spe-cs-5003!2!0001
http://slidepdf.com/reader/full/specification-for-whcp-gpf-osf-9500-spe-cs-500320001 14/27
BP BERAU LTD
8.0 PANEL ENCLOSURE
Panel shall be free standing, two a front face, a top face, a bottom face. Panel enclosure shall beIP66 minimum, 3 mm thickness 316 stainless steel plate from prime stock, free of tool and clamp
marks, brushed finished.
Panel shall have sufficient internal braces and supports to prevent bulging or bulking from
excessive overhang and/or equipment weight and sufficient to withstand handling during
transportation.
All braces and supports shall be fabricated from 316 stainless steel.
316 stainless steel lifting padeyes shall be provided on the top of panel enclosure for handling
operations fixed on the panel frame to avoid distortion when lifting.
Panel shall have removable full length opening doors on the rear side with heavy duty 316 SS
hinges and lock. If center posts are required, they shall be removable for unobstructed access to
Panel internals.
All hardware such as bolts, nuts, screws, etc shall be 316 stainless steel.
All modules of the same type shall be completely interchangeable.
Detail of Wellhead Control Panel should be provided of :
• Number of Wellheads
• Valves
• Control Local/Remote
• Shutdown Level
• Stroke volume
• Closing Time
• Sequence Time
8/13/2019 Specification for Whcp (Gpf & Osf) _ 9500-Spe-cs-5003!2!0001
http://slidepdf.com/reader/full/specification-for-whcp-gpf-osf-9500-spe-cs-500320001 15/27
BP BERAU LTD
9.0 PANEL INSTRUMENTATION
All indicators, relay valves and block valves shall be 316 stainless steel.
All Medium Pressure hydraulic equipment shall be suitable for use with minimum design pressure
of 340 bar g at 40ºC.
All High Pressure hydraulic equipment shall be suitable for use with minimum design pressure of
690 bar g at 40ºC.
PANEL MANUFACTURER shall ensure that seal material of all manual valves, solenoid valves,
regulators, etc. shall be compatible with the characteristics of the specified hydraulic fluid. This
will be castrol Transqua HT a water-based fluid. .
Panels shall be flushed and tested with the specified fluid.
9.1 PANEL DESIGN CRITERIA INTERFACE WITH THE HYDRAULIC SYSTEM
The control system shall be packaged as a complete to allocate for 8 slot panels. This includes the
equipment related to the SCSSV, the Master and the Wing valves.
The well head control panel shall contain all parts necessary for proper and safe operation,
installed, pretubed and prewired including the following:
• Hydraulic system shall be via hydraulic pilot valves and hydraulic solenoid valves with singleacting spring return. The hydraulic pilot and solenoid valves shall be compatible with hydraulic
fluid.
• Pressure transmitters (Smart HART protocol)
• Hydraulic push button shall be mounted on the front face of modules : push to shutdown, pull
to reset of pilot valve for each SCSSV, Master & Wing valves.
• Junction boxes, (EEx “e” certified, IP66)
• Hydraulic logic of sequence for interlock between SCSSV, Master & Wing valves.
The system design the system layout and panel design shall be approved by the COMPANY prior
8/13/2019 Specification for Whcp (Gpf & Osf) _ 9500-Spe-cs-5003!2!0001
http://slidepdf.com/reader/full/specification-for-whcp-gpf-osf-9500-spe-cs-500320001 16/27
BP BERAU LTD
9.2 WHCP ESD SEQUENCE
The valve operating sequence shall be arranged via the WHCP interlock such that the wellhead
valves close in the following order when ESD occurs :
- Wing valve first
then
Master valve
then
SCSSV (Down hole valves)
An opening of the wellhead valves in the following order :
- SCSSV first
then
Master valve
then
Wing valve
Timers shall be provided on the to logic provide delay between valve operations.
The delay will be adjustable 0 ~ 60 second s for SCSSV and 0~30 seconds for Maser Valve at the
WHCP by operations personnel. Position of timing device to be located as to allow easy access.
The closing time for full shutdown for SCSSV shall be 20 seconds.
The closing time for full shutdown for Master and Wing valves shall not be more than 10 seconds
as per API RP 14C
9.3 WHCP “OFFLINE BYPASS” FEATURE
8/13/2019 Specification for Whcp (Gpf & Osf) _ 9500-Spe-cs-5003!2!0001
http://slidepdf.com/reader/full/specification-for-whcp-gpf-osf-9500-spe-cs-500320001 17/27
BP BERAU LTD
10.0 TUBING INSTALLATION
Tubing installation shall be neat, plumb, parallel, rigidly supported and exhibit professionalworkmanship.
Tubing shall be routed so as to allow easy accessibility to panel mounted instruments for routine
maintenance with minimum tubing removal.
All tubing shall be seamless 316L stainless steel, ASTM-A-269/213 316/316L (for high
temperature service such as tubing to downhole valve).
All tubing fittings shall use 316 stainless steel, and shall be SWAGELOK double ferrule type. The
supplier to ensure that fittings are suitable for the temperature conditions when the HP circuits trips
(the return fluid to reach 131 deg.c)
Tubing wall thickness shall be sized to be suitable for the operating pressure. Refer to 9500-SPE-
CS-5004 “Hydraulic Power Unit Specification“.All bulkhead are tube O.D connections and shall
be provided with female bulkhead fittings.
Block valves on bulkhead lines to and from well control modules shall be located as close to the
module to panel connection points as possible.
Block valves shall be clamped or mounted on panel braces or supports.
8/13/2019 Specification for Whcp (Gpf & Osf) _ 9500-Spe-cs-5003!2!0001
http://slidepdf.com/reader/full/specification-for-whcp-gpf-osf-9500-spe-cs-500320001 18/27
BP BERAU LTD
11.0 NAMEPLATE AND TAGGING
Nameplates shall be phenolic, laminated and engraved type. Text and character size and color shall
be accordance with the referenced drawings.
The following of detail on panel numbering and tagging :
No. WHCP/HPU Tag No. Platform
1. 2100-V-1001A1002A VR-A
2. 2100-V-1001B 1002B (Future) VR-A
3. 2200-V-1001A1002A VR-B
4. 2200-V-1001B1002B VR-B
Nameplate shall generally be 25 mm x 75 mm (1 inch x 3 inch) with 4 mm (0.158 inch) high
characters so as to allow 3 horizontal lines with 18 characters per line.
Nameplate shall be fastened to the panel with 18-8 stainless steel screws.
All bulkhead connectors shall have nameplates both inside and outside panel enclosure.
All instruments shall be provided with a permanently attached nameplate with tag numbers asshown in the reference drawings.
A plastic coated stainless steel plate showing panel control schematic etched on the plate shall be
provided by the SUPPLIER. This plate shall be attached to the internal face of the enclosure door.
8/13/2019 Specification for Whcp (Gpf & Osf) _ 9500-Spe-cs-5003!2!0001
http://slidepdf.com/reader/full/specification-for-whcp-gpf-osf-9500-spe-cs-500320001 19/27
BP BERAU LTD
12.0 CLEANLINESS
For reference hydraulic fluid shall be “Castrol Transaqua” HT , it will be water base fluid andenvironmentally benign.
All WHCP components receiving hydraulic fluid shall be suitably flushed in order to obtain a final
ex works particle pollution ≤ level 17/15/12 as stated in ISO 4406 “Hydraulic fluid power –
Method for encoding level of contamination by solid particles”, and class 6 as stated in NAS 1638
“Cleanliness Requirements of Parts used in Hydraulic System”.
The same cleanliness class shall be applied to the whole WHCP.
Procedure for determination of particle contamination shall conform with ARP 598-&-598A
(Aerospace Recommended Practice) “Procedure of the determination of particle count method”.
After cleaning operation of WHCP at the SUPPLIER premises, the tubing at the bulkhead side
shall be suitably plugged to avoid any contamination before being connected on site.
Cleaning and checking operations WHCP shall be included in the SUPPLIER scope of work, and
be performed by a specialised Subcontractor.
Hydraulic fluid necessary for cleaning operation shall be part of the SUPPLIER scope of supply.
8/13/2019 Specification for Whcp (Gpf & Osf) _ 9500-Spe-cs-5003!2!0001
http://slidepdf.com/reader/full/specification-for-whcp-gpf-osf-9500-spe-cs-500320001 20/27
BP BERAU LTD
13.0 INSPECTION AND TESTING
The responsibility for inspection and testing rests with the CONTRACTOR. However, the
COMPANY reserves the right to inspect equipment at any time during fabrication to assure the
materials and workmanship are in accordance with this specification, referenced data sheets and
drawings.
Supplier shall provide FAT procedure for CONTRACTOR/COMPANY approval prior to
submitting for FAT.
The CONTRACTOR shall notify COMPANY or its authorized representative of its intention ofcarrying out factory tests at least two (2) weeks prior to commencement of such tests in order that
the COMPANY may witness the test.
The CONTRACTOR/SUPPLIER shall supply the services of a competent technician who shall be
responsible for carrying out shop performance tests to the satisfaction of the COMPANY or its
authorized representative.
The SUPPLIER shall provide all necessary test certificates to be signed by CONTRACTOR during
the Factory Acceptance Tests. These certificates shall be part of the “Functional test procedure”
If requested, the CONTRACTOR/SUPPLIER shall supply the services of a competent on-site
commissioning technician who shall be responsible for carrying out performance tests to the
satisfaction of the COMPANY or its authorized representative.
The CONTRACTOR shall submit test and commissioning data to the COMPANY or its authorizedrepresentative within two (2) weeks of the completion of the above tests.
8/13/2019 Specification for Whcp (Gpf & Osf) _ 9500-Spe-cs-5003!2!0001
http://slidepdf.com/reader/full/specification-for-whcp-gpf-osf-9500-spe-cs-500320001 21/27
BP BERAU LTD
14.0 FACTORY ACCEPTANCE TEST (FAT)
Before the system is delivered to the site, satisfactory performance of the entire system shall be
demonstrated to the project’s designated representative. The system shall simulate the final onsiteconfiguration as closely as possible.
The following test are recommended. They shall be developed in detail during preparation test
procedures. The vendor shall have technician and test equipment available full time during testing
• Inspection of equipment
• Shock or vibration test
• Functional test, including operator control panel functions and failures and interaction between
different part of the system
• Electrical insulation and continuity test
• Leak test of tubing at 1.5 maximum working pressure during 30 minutes
• Nameplates checked for correct spelling and location
• Grounding test
• Termination, glands, junction boxes, etc for correct installation
• Full mechanical and panel finish
• Spare capacity verification
Vendor shall follow the FAT procedure in accordance with document no. 9000-DBS-MM-0001,
“Source and Factory Inspection Basis of Design”.
8/13/2019 Specification for Whcp (Gpf & Osf) _ 9500-Spe-cs-5003!2!0001
http://slidepdf.com/reader/full/specification-for-whcp-gpf-osf-9500-spe-cs-500320001 22/27
BP BERAU LTD
15.0 SITE ACCEPTANCE TEST
Site acceptance will involve two stages; checkout in the fabrication yard prior to load out and in-
situ at the Job Site
The SUPPLIER shall provide qualified engineering assistance in the fabrication yard to assure that
the equipment has been received and installed without damage, and that it is ready for
commissioning.
The SUPPLIER shall then perform site acceptance tests (SAT) to prove satisfactory system
performance at Job Site. SUPPLIER shall commission the WHCP and demonstrate the
performance of the system to the satisfaction of the COMPANY. All deficiencies, errors, action
items, etc. shall be corrected and or completed prior to final acceptance of the system.
8/13/2019 Specification for Whcp (Gpf & Osf) _ 9500-Spe-cs-5003!2!0001
http://slidepdf.com/reader/full/specification-for-whcp-gpf-osf-9500-spe-cs-500320001 23/27
BP BERAU LTD
16.0 PREPARATION FOR SHIPMENT
SUPPLIER shall prepare the Panel for export shipment. Panel shall be crated in a manner to
provide maximum protection during shipment and storage.
Screwed connections are to be protected with threaded plastic plugs.
8/13/2019 Specification for Whcp (Gpf & Osf) _ 9500-Spe-cs-5003!2!0001
http://slidepdf.com/reader/full/specification-for-whcp-gpf-osf-9500-spe-cs-500320001 24/27
BP BERAU LTD
17.0 DOCUMENTATION REQUIREMENT
Standard SUPPLIER documentation shall be provided. The types and quantity of documents shall
be as listed in the SUPPLIER DATA REQUIREMENT LIST (SDRL).
Operating and Maintenance Manual shall be written specifically for the particular system.
Operating and Maintenance Manual shall include the following as a minimum:
Installation manual section shall contain all information necessary for site preparation, powering,
grounding, installation procedure, commissioning, start up, etc. All auxiliary equipment supplied
shall be provided with manufacturer’s installation, operating and maintenance manual specific to
the equipment.
Operating manual shall completely describe the theory, configuration and overall operation of
WHCP.
Maintenance manual shall contain all necessary information to maintain WHCP. The manual shall
have instructions for trouble shooting, routine maintenance, preventive maintenance, assembly and
disassembly, etc.
The SUPPLIER shall be responsible for producing an ‘as-built’ set of documents reflecting all
modifications made during testing and commissioning. Operation and maintenance manuals shall
be provided in editable format to aid preparation of the COMPANY documentation.
Refer to Appendix-1 of Requisition for WHCP (9500-REQ-CS-5020).
8/13/2019 Specification for Whcp (Gpf & Osf) _ 9500-Spe-cs-5003!2!0001
http://slidepdf.com/reader/full/specification-for-whcp-gpf-osf-9500-spe-cs-500320001 25/27
HYDRAULIC SUPPLY
FROM HPU HP HEADER
Document No
Revision
9500-SPE-CS-5003:
: 2 25 of 27Page
BP BERAU LTD
ATTACHMENT
ATTACHMENT- 1 : WHCP SCHEMATIC DIAGRAM( CONTROL MODULE DRAWER TYPICAL)
18.0
18.1
CLOSE
SCSSV, MASTER& WING
~
311 bar g
HYDRAULIC SUPPLY
FROM HPU HP LP HEADER
5 bar g
590 bar g
H
L
H
L
H
L
_ _ _ _ _ |
|
| |
_ _ _ _ _ I N D RA
0 7 - MA Y -
2 0 0 7
BP BERAU LTD
8/13/2019 Specification for Whcp (Gpf & Osf) _ 9500-Spe-cs-5003!2!0001
http://slidepdf.com/reader/full/specification-for-whcp-gpf-osf-9500-spe-cs-500320001 26/27
ATTACHMENT-2 : WHCP SCHEMATIC DIAGRAM (CONTROL MODULE BYPASS DRAWER TYPICAL)
BP BERAU LTD
18.2
Document NoRevision
9500-SPE-CS-5003:: 2 26 of 27Page
SCSSV, MASTER VALVECLOSE
_ _ _ _ _ |
|
| |
_ _ _ _ _ I N D RA
0 7 - MA Y -
2 0 0 7
8/13/2019 Specification for Whcp (Gpf & Osf) _ 9500-Spe-cs-5003!2!0001
http://slidepdf.com/reader/full/specification-for-whcp-gpf-osf-9500-spe-cs-500320001 27/27
_ _ _ _ _ |
|
| |
_ _ _ _ _ I N D RA
0 7 - MA Y -
2 0 0 7