Solving Environmental Challenges
Paolo Mannone – Director of AECOM EnvironmentContinental Europe
Gheorghe Stoian – Head of Environment AECOMRomania
February 2016
Building,Design &Planning
Water Transportation ManagementServices
Power &Energy
Construction
l Air QualityConsulting &Engineering
l Climate Adaptation &Sustainability
l EHS ManagementConsulting &Compliance
l Impact Assessment& Permitting
l ManagementInformation Systems
l Remediation,Restoration,Redevelopment
l Solid & HazardousWaste Services
l Water, NaturalResourcesManagement
l Architecturel Building
Engineeringl Designl Economicsl Facilities
Managementl Planningl Program/
ConstructionManagement
l Program CostConsultancy
l CommunityInfrastructure
l Design-Buildl Drinking Waterl Industrial Waterl Wastewaterl Water Resourcesl Stormwater &
WatershedManagement
l Aviationl Freight Raill Highways &
Bridgesl Mass Transitl Planningl Ports & Marinel Traffic
l EmergencyManagement &ContingencyOperations
l InformationManagementSystems
l Intelligence andClassified MissionSupport
l InternationalDevelopment
l Logistics, Operationsand Maintenance
l Procurementl Systems
Engineeringl Training and
Simulation
l Energy Efficiency& CarbonManagement
l Energy Planning& Economics
l EngineeringDesign
l Hydroelectricl Nuclearl Renewables &
AlternativePower
l Transmission &Distribution
l Commissioningl Constructionl Construction
Inspectionl Construction
Managementl Cost Managementl Project Controlsl Site Development /
Preparationl Stakeholder
Relations
Fully Integrated Engineering Firm
Environment
Fully Integrated Engineering Firm
“…OUR CAPABILITY TO OFFER INTEGRATED
ENGINEERING SERVICES ALLOW US TO BE
BETTER ENVIRONMENTAL CONSULTANTS ...”
ASSET MANAGEMENT INTEGRATIONEnvironmentEnvironment
Key Figures
6.800ENV Staff 1.600
ENV Staff
800ENV Staff
150 Countries
85.000 Total Staff
9.200 Environment
Romania
§ Environmental Services
ENVIRONMENT ROMANIA
Beside design and environmental consultingservices, AECOM also acts in Romania as a GeneralContractor for Environmental projects, through theEnvironment Business Line.
AECOM is registered in the National Register ofdevelopers for environmental studies, namely:environmental balances, impact studies,environmental reports, appropriate assessment.
– ESHIA – Environmental Social Health ImpactAssessment
– EIA, SEA and Environmental permitting– Water management permitting– Biodiversity– Waste management and reporting– VOC balances and reporting– Remediation and site restoration services– Waste management and reporting– Technical assistance– Construction/remediation supervision including full
works packages– Environmental status monitoring– Environmental due diligence– Environmental consultancy– Geographic Information System GIS Analysis– Water and wastewater management
WHAT WE DO
February 16, 2016Presentation Title Page 9
SELECTED PROJECT EXPERIENCE
February 16, 2016Solving Environmental Challenges Page 10
ESHIA, Land Leasing and Engineering Services in Romania(confidential client)
February 16, 2016Solving Environmental Challenges Page 11
Independenta bio-treatment plant, Galati CountyConstruction
February 16, 2016Solving Environmental Challenges Page 12
Ticleni bio-treatment plant and landfill, Gorj CountyConstruction
February 16, 2016Solving Environmental Challenges Page 13
Barasti bio-treatment plant, Olt CountyConstruction
February 16, 2016Solving Environmental Challenges Page 14
Videle bio-treatment plant, Teleorman CountyConstruction
February 16, 2016Solving Environmental Challenges Page 15
Arpechim refinery lakes bioremediationRemediation
February 16, 2016Solving Environmental Challenges Page 16
Petrobrazi refinery internal lagoons cleanupRemediation
Food industry plant decommissioning and decontamination
February 16, 2016Solving Environmental Challenges Page 17
February 16, 2016Solving Environmental Challenges Page 18
Food industry plant decommissioning
SEA, GENERAL TRANSPORT MASTER PLANFOR ROMANIA (GTMP)
February 16, 2016Solving Environmental Challenges Page 19
• Integrate environmental considerations into the preparation andadoption of GTMP;• Ensure that all necessary measures are taken to protect theenvironment and the protected areas, to reduce environmentalimpacts ;• Ensure the sustainable development of the GTMP.
February 16, 2016Solving Environmental Challenges Page 20
Rehabilitation of Industrial Sludge lagoon of 30 hectares inTg Mures
AECOM – JV partner in a design&build project,in collaboration with:
- Geiger Transilvania SRL,- Geiger Umweltsanierung GmbH and- Astor Com SRL.
Short description of the historical polluted site
February 16, 2016Solving Environmental Challenges Page 21
Satellite imagery of the sludge lagoon - 2013
Short description of the historical polluted siteImages of the lagoon in June 2014
February 16, 2016Solving Environmental Challenges Page 22
The state of the sludge
February 16, 2016Solving Environmental Challenges Page 23
February 16, 2016Solving Environmental Challenges Page 24
Should we adapt the lagoon to the designor
Should we adapt the design to the lagoon?
Traditionalconcept
The concept will askadditional material.
Potential behaviorin time
or
Use the natural shape of the sludge and designing a more even covering layer
Current sludgeshape
February 16, 2016Solving Environmental Challenges Page 25
Optimal solution for implementation
February 16, 2016Solving Environmental Challenges Page 26
Challengesmaterials behavior
Overlapping on the adjacent strips of geogrid do not function properly on sludge
February 16, 2016Solving Environmental Challenges Page 27
A higher strength material was tested and which can be sewed for providing strength continuity
Solutions
February 16, 2016Solving Environmental Challenges Page 28
ChallengesSide extrusions of sludge when executing the internal dams
February 16, 2016Solving Environmental Challenges Page 29
A floating excavator was used to dig the internal dam routes and to level the excess of material. The same equipment wasused for leveling the already occurred side extrusions of the sludge.
SolutionsPreliminary removal of the sludge crust and side
sludge leveling
February 16, 2016Solving Environmental Challenges Page 30
Works progress
Image taken in October 2015
Decision on new investments• Choosing the site location• Baseline surveys• Due Diligence – ESA Phase 1, 2• Romanian Environmental Balances• Risk studies• Decontamination works
Construction phase• Design and technical assistance• All required permitting services• Works Supervision / Works Management• Construction of industrial buildings and facilities• Remediation/decontamination works
Decommissioning• Site investigations (DD, ESA, Env. Balances)• Assessment of remediation needs and costs• Formalizing environmental liabilities• Decontamination/demolition works
Operation• Getting or renewal of Environmental Permit• IPPC - permit• Water management permit• Planning and coordination of environmental
monitoring• Support in reporting to authorities
o waste, including specific waste (packaging, tires etc)o VOC, other air/water emissions
We can offer individual or whole chain of services and works for different phases
February 16, 2016Solving Environmental Challenges Page 31
Thank You!For any enquiries please contact:
GHEORGHE STOIAN
Head of EnvironmentalDepartment
gheorghe.stoian@aecom.com
Phone: +4 021 316 11 63
Mobile: +4 0756 135 051
PAOLO MANNONE
Director, Growth - EnvironmentContinental Europe
paolo.mannone@aecom.com
Phone: +39 02 422556 213Mobile: +39 348 93 73 361