Solar Plants Installed with Monitoring

Post on 15-Apr-2017

28 views 0 download

Transcript of Solar Plants Installed with Monitoring

J Pan Tubular, Gr. Noida – 120 kw DC

Reverse Meter

Electricity bill reducedfrom 2,15,000- to 85,000- pmWith Solar Power Plant

DG Synchronized Solar

Raj Bhawan

Dehradun – 11.34kw

Summer optimized Solar Plant to bypass longer shadow of trees in winter

Reverse MeterPeak Generation : 7.2 units / kw

Gorwara Chemicals, Udaipur-RajasthanAC: 50 kw; DC: 52.78 kw. On 10th April: 360 AC Units / 50 kw AC

Suri Shoes, Kanpur 90 kw DC PID Free Panels: Dust Attraction

Minimized

DG usage Minimized

DG usage Reduced from 365 to 35 days

Rosy Public School – Jalalabad UP Off Grid (Grid available: 1½ hr)

25 kW DC

4-mm thick laminated glassDurability maximized - Sahu Exports, Gr. Noida

Durability maximized4 mm laminated glass

Central Monitoring of Plants for Customer Support

STP 25000TL-

30 178Data logger

object energyMeter

change [kWh]

STP 25000TL-

30 189Data logger

object energyMeter

change [kWh]

STP 25000TL-

30 190Data logger

object energyMeter

change [kWh]

STP 25000TL-

30 279Data logger

object energyMeter

change [kWh]

9/13/16 6.357 6.415 6.022 7.812

9/14/16 107.226 106.521 105.796 120.972

9/15/16 93.602 92.729 91.651 109.311

9/16/16 108.529 107.437 106.585 121.669

9/17/16 78.383 78.116 77.441 87.965

9/18/16 89.392 88.615 87.860 104.592

9/19/16 99.525 97.557 96.417 107.319

9/20/16 99.551 97.690 97.042 110.477

9/21/16 101.483 99.807 98.900 117.864

9/22/16 88.313 87.029 86.158 102.316

9/23/16 97.529 96.799 96.654 111.099

9/24/16 18.777 18.628 18.673 22.159

1 String disconnected

Inverter Tripping due to leakage by morning moisture

460 nos.x260w = 120.120 kwpStrings: 2(5x21PV) + 2(6x21PV)

Central Monitoring of Plants for Maintenance

Dirty

CleanedDirty Panels: Power Loss

Shree Bharat, Sector-11, Noida – 50 kw

Multiple Diversified Rooftop Plants

Shree Bharat, Sector-7, Noida – 40 kw

Diversified Rooftop Plants

St. Paul’s Sr. Secondary School – Udaipur – 75 kw Tier-1 Panels with 4 Bus Bar cells

‘Global Rank Quality & Economic’ Panels preferred by school instead of Govt. Subsidy with High Priced Local Panels