Post on 02-Jun-2018
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
1/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
2/134
ROUDLY AN ISO 9001:2000
CERTIFIED COM ANY
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
3/134
COM ANIES ROFILE
COM ANY NAME : M/s S.M.Asghar ( vt) Limited
n ISO 9001:2000 Certified Company
COM LETE ADDRESS : 908-910, 9
th
Floor, Chapal
laza, Hasrat Mohani Road
Off I.I.Chundrigar Road
Karachi.
COR ORATE STATUS OF FIRM : RIVATE LIMITED.
TELE HONE NO : 00+ 92+213-2468091 -5
FAX NO : 00+92+213-2468096.
FIRMS CUSTOM HOUSE LICENCE NO : 714. (Copy Enclosed).
DATE OF REGISTRATION WITH : 30-03-1980.
CUSTOMS
E- MAIL ADDRESS : smasghar@cyber.net.pk
E- MAIL ADDRESS : info@smasghar.com.pk
Web- age : http://www.smasghar.com.pk
DATE OF ISSUE OF LICENCE : 30-03-1980.
NUMBER OF STAFF EM LOYED : 20.
YEAR OF ESTABLISHMENT : 1980.
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
4/134
SYED KHALID JAMAL CHIEF EXECUTIVE
SYED SAJID JAMAL DIRECTOR PROJECTS & COMM DIVISION
SYED MOHAMMAD ALI KHALID GENNERAL MANAGER
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
5/134
EO LE BEHIND THE COM ANY
SYED KHALID JAMAL : CHIEF EXECUTIVE.
SYED SAJID JAMAL : DIRECTOR PROJECTS & COMM DIV
SYED MOHAMMAD ALI KHALID : GENERAL MANAGER
MOHAMMAD ANWER : HEAD OF PORT OPERATIONS.
MOHAMMAD FAYYAZ KHAN : INCHARGE EXPORT DIVISION
MOHD SHARIF KHAN : HEAD OF CUSTOMS DIVISION.
S.IMDAD ALI.ZAIDI : HEAD OF PORT QASIM DIV.
MOHD SALEEM : ASST PORT OPERATION.
MOHD JAVED : ASST PORT OPERATION.
QAZI KHURSHID AHMED : HEAD OF AIRPORT DIV.
SALEEM NOOR : ASST. AIRPORT OPERATIONS
AFTAB AHMED : CO-ORDINATOR SHIPPING COMPANY
SAEED KHAN : HEAD OF COMPUTER DIVISION
DILSHAD A. SIDDIQUI. : MANAGER FINANCE
ASIF KHAN : ASST. MANAGER FINANCE
ATIA FASIAL : ASST. OFFICE CO-ORDINATOR
SYED ADNAN ALI : INCHARGE GD PREPARATION (BY AIR)
ASAD ABBAS : ASST.BILLINGS & ACCOUNTS
MOHSIN KHAN : FIELD OFFICER.
SADDAM HUSSAIN : FIELD OFFICER.
SULEMAN : OFFICE PEON.
USMAN GHANI : OFFICE PEON.
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
6/134
SECTION 1 : INTRODUCTION
SECTION 2 : SCO E OF WORK
SECTION 3 : DOCUMENTATION
REQUIREMENTS
SECTION 4 : ROJECT REFERENCES
SECTION 5 : ICUTRE GALLARY
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
7/134
We are pleased to inform you that by the Grace of All mighty Allah, currently we are Handling Projects for valuing more orless US $ 1.2 Billion Dollars.
You will appreciates that in all of the Projects mentionedbelow we have taken various Exemptions & benefits ofvarious SRO’s from Customer to Customer& on Project to Project Basis.
With our background experience, M/s. S.M.Asghar (Pvt) Limited has successfully completed all the major & PrestigiousProjects of National Importance as well asInternational Importance.
We on merit got the benefit of various ConcessionarySRO’s & Exemptions to our valued Customer to theirEntire satisfaction & without any problems and difficulty.
Our team of professionals sits with the Customer priorto the start of the Project/Projects & developed systemsand a general flexibility of approach tailored to ourClients most Complex of requirements.
We believe that our Professional approach to ourClient is unparalleled by any competitors.
Few of the recent Projects & Customer Referencesare given below, for whom we have claimed the various SRO’s& Exemptions to our valued Customer to their entiresatisfaction.
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
8/134
MOL MAKORI GAS FIELD
SRO: 678(I)/2004, DT: 07-08-2004
Petrosin Ravi
SRO: 678(I)/2004, DT: 07-08-2004
SHELL GAS
SRO: 678(I)/2004, DT: 07-08-2004
SHV ENERGY PAKISTAN Various Equipments & Material Including Break Bulk LPG Mixture
SRO: 678(I)/2004, DT: 07-08-2004
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
9/134
Expansion of Plant: RAVI GAS
SRO: 678(I)/2004, DT: 07-08-2004
WEATHERFORD DRILLING
SRO: 678(I)/2004, DT: 07-08-2004
Petrosin Engineering (One of the Largest Private Sector Project US $ 700 Million Dollars)
SRO: 678(I)/2004, DT: 07-08-2004
TRANSASIA REFINERY LTD (Re-Location)(One of the Largest Private Sector Project US $ 700 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
10/134
INDUS REFINERY LTD (Re-Location)(Another Largest Private Sector Project US $ 650 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
DESALINATION & POWER PROJECT” at DHA Karachi
(Total Cost of the Project US $ 160 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
KARACHI INTERNATIONAL CONTAINER TERMINAL LIMITED (KICTL) at Karachi
EXPANSION PROJECT & NEW GANTRY CRANE
(Total Cost of the Project US $ 400 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
MIRANI HYDRO POWER DAM PROJECT (The Project Cost US $ 80 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
11/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
12/134
DUBER KHWAR HYDRO POWER DAM PROJECT (The Project Cost US $ 100 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
KHAN KHWAR HYDRO POWER DAM PROJECT (The Project Cost US $ 100 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
JAMSHORO JOINT VENTURE LIMITED (JJVL) PAHSE I (The Project Cost US $ 45 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
JAMSHORO JOINT VENTURE LIMITED (JJVL) PAHSE II (The Project Cost US $ 20 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
13/134
PROGAS LPG STORAGE & HANDLING TERMIANAL
(Private Sector Project US $ 50 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
FUAJI OIL TERMINAL & HANDLING JETTY FAICILITIES (The Second Expansion Phase Project US $ 30 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
PETROSIN ENGINEERING (Pvt) LTDQADIRPUR 600 MMSOFD EXPANSION PROJECT
(The Project Cost US $ 6 Million Dollars) SRO: 678(I)/2004, DT: 07-08-2004
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
14/134
CHINA XINJIANG BEIXIN ROAD & BRIDGE CONSTRUCTION CO.,LIMITEDPACKAGE 8C-1, ATC COMPLEX AND FCR BUILDING FOR NEW BENAZIRBHUTTO INTERNATIONAL AIRPORT PROJECT, ISLAMABAD(The Project Cost US $ 14 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
CHINA XINJIANG BEIXIN ROAD & BRIDGE CONSTRUCTION CO.,LIMITEDPACKAGE 01 OF AZAD JAMMU & KASHMIR URBAN DEVELOPMENTPROGRAM FOR ERRA(The Project Cost US $ 300 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
ALSTOM PAKISTAN LIMITEDFUAJI FERTILIZER COMPANY ENERGY LIMITED (FFCEL)
SETTING UP OF COMPLETE GRID STATION FOR FIRST WIND ENERGYFARM PROJECT OF 49.5 MW CAPACITY AT JHAMPIR.(The Project Cost US $ 20 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
15/134
ALSTOM PAKISTAN LIMITEDZHORLU WIND POWER ( Heavy Transformers)SETTING UP OF COMPLETE GRID STATION FOR FIRST WIND ENERGYFARM PROJECT OF 49.5 MW CAPACITY AT JHAMPIR.
SRO: 575(I)/2006, DT: 05-06-2006
FUAJI FERTILIZER COMPANY ENERGY LIMITED (FFCEL)SETTING UP OF COMPLETE GRID STATION FOR FIRST WIND ENERGYFARM PROJECT OF 49.5 MW CAPACITY AT JHAMPIR IN PAKISTAN.( The Project Cost US $ 50 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
DESCON ENGINEERING SETTING UP OF NEW WIND ENERGY FARM FOR FOUNDATION ENERGY 1
(The Project Cost US $ 130 Million Dollars)SRO: 575(I)/2006, DT: 05-06-2006
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
16/134
DESCON ENGINEERING SETTING UP OF NEW WIND ENERGY FARM FOR FOUNDATION ENERGY 2
(The Project Cost US $ 130 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
DESCON ENGINEERINGSETTING UP OF COMPLETE NEW ASPHALT BUILT UNIT (ABU)
(The Project Cost US $ 30 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
17/134
S.M.ASGHAR ( VT) LIMITED
908-910, 9
th
Floor, Chapal laza, Hasrat Mohani
Road, Off I.I Chundrigar Road, KARACH I
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
18/134
We have a pleasure to give a brief introduction of our Company
M/s. S.M.Asghar (Pvt) Limited , a name famous for its credibility,reliability & commitment in this part of world.
We are proudly an ISO 9001-2000 Certified Company.
We are among the few & pioneer company who got theISO Certification in Custom Clearance in Pakistan.
With our background experience, M/s. S.M.Asghar (Pvt) Limited
has been able to developed systems and a general flexibility ofapproach tailored & personalized solutions to our Clients most ComplexRequirements that we believe is unparalleled by any competitors.
Most important our customers are able to deal with an InternationalNetwork who can arrange the movement and supervisionof cargo from Europe, and beyond, whilst they onlyinstruct one control office. This International Strengthand wealth of experience combined with a genuinely personal
approach we feel makes us a formidable contender.
Our Credentials our Enthusiasm and our Track Record speak forthemselves.
For over the last 15 Years, M/s. S.M.Asghar (Pvt) Limited have developed & specializes and simultaneously Transformitself into a PROJECT CLEARANCE SPECIALIST.
If one can give a brief look at the Pakistan’s Most Advanced
& the Important Industrial Estate PORT BIN QASIM, by the Grace Of All Mighty Allah it is an Honor for
M/s. S.M.Asghar (Pvt) Limited to perform the Complete CustomClearance & the Logistics Support in the form of Local Transportation tothese Prestigious Projects.
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
19/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
20/134
ENGRO ASAHI POLYEMR & CHEMICALS (Another One of the Largest Private Sector Project US $ 80 Million Dollars)
FAUJI FERTILIZER BIN QASIM LTD(Handling of Break Bulk Phosphoric Acid)
LPG BREAK BULK SHIPMENT (Handling of 100% of Pakistan Break Bulk LPG Shipments at EVTL)
VCM BREAK BULK SHIPMENT (Handling of 100% of Break Bulk VCM Shipments at EVTL)
ETHYLENE BREAK BULK SHIPMENT (Handling of 100% of Break Bulk ETHELYNE Shipments at EVTL)
K ARACHI I NTERNATIONAL C ONTAINER T ERMINAL (KICT) P HASE II E XPANSION P ROJECT (Total Cost of the Project US $ 400 Million Dollars)
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
21/134
Beside the Port Qasim & Karachi we now take a trip to the otherside & rest of the Pakistan Major Prestigious & Project of National
Importance.
The Government of Pakistan in the last 5 Years initiated the fewHydropower Power & Dam Projects to overcome the Power Break downCrisis.
Hydro Power Sector
Among these Projects of National Importance includes:-
MIRANI HYDRO POWER DAM PROJECT (The Project Cost US $ 80 Million Dollars)
SATPARA HYDRO POWER DAM PROJECT (The Project Cost US $ 30 Million Dollars)
MANGLA RAISING HYDRO POWER DAM PROJECT (The Project Cost US $ 100 Million Dollars)
GOMAL ZAM HYDRO POWER DAM PROJECT (The Project Cost US $ 100 Million Dollars )
DUBER KHWAR HYDRO POWER DAM PROJECT (The Project Cost US $ 100 Million Dollars)
KHAN KHWAR HYDRO POWER DAM PROJECT (The Project Cost US $ 100 Million Dollars)
ALAI KHWAR HYDRO POWER DAM PROJECT (The Project Cost US $ 100 Million Dollars)Beside the Hydropower Projects, the Government also encourages theother areas such as the Sea to generate Electricity, beside the supply
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
22/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
23/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
24/134
SCOPE OF WORK
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
25/134
BENEFIT OF VAVARIOUS
CONCESSIONARY
SRO’s & EXEM TIONS
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
26/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
27/134
CUSTOM CLEARANCE:
We shall collect in full advance all the necessarydocuments for the onward Custom Clearance fromthe Importer / Representatives of the Importer when intimated and will prepare GD and all therequired documents and formalities to be submittedto the related Custom Authority and Will Completethe preparation of the GD (Goods Declaration) asper Invoice, Packing List & Bill Of Ladingdepending on weather the Vessel has arrived and
also subject to the Lodging Of Manifestation ofIGM (Import General Manifest) by the Shipping Company / Shipping Agent.
OBTAINING THE DELIVERY ORDER:
We shall complete all the formalities required by the relative Shipping Agent /
Main Carrier Agent/ relevant Port Authority and will obtain the DeliveryOrder from the Shipping Company/ OR their Agent against thepresentation/ submission of Original Bill of Lading.The delivery Order's are generally issued after filing of IGM in order to
ascertain the goods have not been Transshipped.
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
28/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
29/134
DELIVERY AT / TO THE LANT SITE
We shall safely Transport the Cargo by theTrucks, Trailers, Multi Axle, Low Bed OR asper the requirement & Nature of Cargo to theWarehouse or the open storage area as perthe instruction of Importer / Representatives of the Importer.
CUSTOM DUTIES TAXES
SRO’s AND NECESSARY
ERMITS
All the Plant, Machinery, Equipment and Parts/Spares which are importedinto Pakistan shall be subject to Custom Duties and Taxes Prevailing at thetime of Import.
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
30/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
31/134
2) WEST WHARF:
a) Karachi International Container Terminal Ltd (KICT)
b) KPT owns few Berths such as Berth Namely 18, 19, 20, 21, 22, 23, 24 And 25
c) Berth Number 25 is for Heavy Lift Cargo that has On Shore HeavyCrane for capacity 50 M/Tons.
For Containerized Cargo the various Yards/Ports are charging different
Handling Charges/Lifting Charges/Examination Charges/RD/Seal BreakingCharges/Yard Storage Charges.
Please note that for all the above mentioned charges the relevantPort /Yard will issue Receipts for the relevant charges.
Excise Taxes @ 0.91-0.95% on Import Value/Assessed Value/ Appraise Value by the Customs or any other Charges / Taxes prevailing atthe time of Import shall be Paid by the I m p o r t e r immediately before
the Clearance of the Consignments from the Port.
Further the completion of GD’s (Bill of Entry) and other Custom formalitiesare subject to the Final Assessment / Valuation / Any SRO Benefits / PCTconfirmation and also the Container / Marks & Number.
Any discrepancy or mistake or dispute arising due to Invoice/ Packing List /Bill of Lading OR any other relevant documents submitted by theImporter ,will may render in delay to clear the consignment.
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
32/134
SUBMITTAL OF SHI ING GUARANTEE
BOND IN ABSENCE OF ORIGINAL BILL OF LADING
If there is a delay in the arrival of the Original Bill of Lading, can cause a
delay in getting the Goods/ Cargo release of the from the Portpremises/Yard.
A Shipping Guarantee Letter/Bond for the said Bill of Lading would betherefore required by the shipping company in order to issue the DeliveryOrder.
It shall be discussed and settle before arrival of the vessel. We will provideall necessary assistance and advice for the Shipping Guarantee to theImporter / Representatives of the Importer .
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
33/134
During the Unloading of the Break Bulk/ loose Cargo from the vessel
There are chances of getting the goods Damage OR in case we find any
Loss of Goods and or the Goods already Damage on or after its receiving
We shall report to the Importer / Representatives of the Importer or
Arrange a joint survey as soon as possible. Marine/Transit insurance
Shall be arranged by Importer / Representatives of the Importer , from
Place of Origin up to the Plant Site.
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
34/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
35/134
The G.D (Goods Declaration) is prepared in accordance with the
declaration of the Importer and the documents provided by the Importeri.e. Commercial Invoice, Bill of Landing and the Packing List. Thereafter theG.D (Goods Declaration) is submitted to the Custom for Assessment onLine.
* The amount of Custom Duties & Taxes and the Sindh Infra StructureFee (CESS) has to be paid in advance as per the Importer declaration.
* If the assessment by the WeBOC is done as per the declaration of
Importer, than the G.D is processed and the Importer can take thedelivery of the goods, after the payment of all the necessary Port Dues& Excise Tax.
In case the goods have been processed under WeBOC SYSTEM does notaccept the Importer Declaration, than the Importer may asked for additionalDuties & Taxes or If the Importer wants to Contest with the views of theCustoms than they can go for appeal & meet the Senior Custom Officialsalong with the relevant Documents & Proof to justify their claims.
The Custom Authorities may defer in three basic ways :
1) Disagreement in the PCT OR HS Code Classification.
2) Not extending the benefit of the claimed SRO.
3) Disagreement with the Valuation.
If Customs satisfy with all the 03 criteria’s mentioned above i.e.
PCTSROValuation
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
36/134
The GD is than completed by the Concerned Group. The Importer has
to than pay the Applicable Duties & Taxes after that the GD isforwarded to the Port side for Examination after which the Importer cantake the Delivery of the goods after the payment necessary PortDues.
* If Customs do not satisfy with all the 03 Criteria’s mentioned abovei.e.
PCT
SROValuation
Than the GD is forwarded to thePort Side for Physical Examination tocheck the goods are in conformity to the declaration of the Importer &under the light of Examination Report GD will be completed by theconcerned Group in the Custom House.
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
37/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
38/134
The following documents are required generally by the customs forprocessing the B/E for the Cargo arriving at Sea Port.
I Original Invoice showing complete description of the goods with valueof the each individual item
II Detail Packing List showing complete Description, Quantity GrossWt, Net Wt, Ullage Certificate.
III Original Bill of Lading duly endorsed at the backside in our Favor.
IV Certificate of Origin
V All Govt. Sanctions, Authorization from Government Agenciesif any
VII Original Letter of Credit
VIII Sales Tax Registration Certificate
IX Import Registration
X National Tax No Certificate Copy
Any other document that may be requested by the Custom to verify thedeclaration of Importer
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
39/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
40/134
Further to the above there may be delays in Clearance due to followingreasons:-
I Non availability of the Original Documents, such as BL
II Delay in meeting Custom Queries.
III Strikes / Weather, Act of God, Force Major Etc
IV Delays due to Non-availability of concerned officers.
V Delays in receipts of payments
VI Delays due to the Non-fulfillment of Shipping Companies
VII Delays due to Non-availability of Trucks / Trailer
OSSBLE
DELAYS
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
41/134
PREVIOUSPROJECTS
HANDLED
.
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
42/134
CLIENTS ROJECTS
* M/S ICI AKISTAN LTD.
C/o TRANSCAR ROJECTS LTD
ICI TA ROJECT ORT QASIM
* M/S ENGRO AKTANK TERMINAL.
CHEMICAL STORAGE TERMINAL
* M/S NOEL LGA (GERMANY)
L G EX ANSION & MARKETING
* M/S ENGRO ASAHI OLYMER & CHEMICALS.
ENGRO VC LANT ROJECT
* M/s TEKSER INSAAT SAANAYI
CHASMA RIGHT BANK C-65
* M/S FMC. (MARINE LOADING ARM)
FOTCO OIL TERMINAL BIN QASIM
* M/S SECA AKISTAN.
KHI - HYDERABAD BY ASS
* M/S TRANSCAR ROJECTS LTD.
DHABEJI UM ING STATION W-19
* M/S TRANSCAR ROJECTS LTD.
NORTH EAST KARACHI STATION W-18
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
43/134
* M/S CHINA GUANGXI COR ORATION
ATFEEDER CANAL ROJECT
* M/S CHINA DONGFANG COR ORATION
SEWERAGE TREATMENT ROJECT
* M/S CHINA ETROLEUM
KORANGI SEWERAGE TREATMENT
* M/S CHINA YUNNAN COR ORATION
K T JINNAH BRIDGE HASE II
* M/S CHINA NATIONAL ELECTRIC WIRE & CABLES
QUEENS ROAD OWER STATION
* M/S CHINA HARBOR ENGINEERING
JETTY FOR ENGRO AKTANK
* M/S IJM / IGI JOINT VENTURE.
LBOD SANGHAR ROJECTS
* M/S LIFE LINE ( vt) LTD.
DHURNAL L G GAS EX ANSION
ROJECT
* M/S ENGRO AKTANK TERMINAL.
L G TERMINAL AT BIN QASIM
* M/S ENGRO AKTANK TERMINAL
VCM TERMINAL HANDLING ROJECT
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
44/134
* M/S HYUNDAI COR KHI OFFICE.
K.E.S.C HIGH TENSION CABLE ROJ.
* M/S HYDERABAD DEVELO MENT AUTHORITY.
MACHINERY UNDER S ANISH GRANT
* M/S CHINA YUNNAN COR ORATION.
MALDIVE S ARLIAMENT BUILDING
* M/S CHINA NATIONAL CHEM ENGG COR .
SUB CONTRACTOR FOR DONGFANG
S2 ROJECT
* ENGRO ASAHI TRADING ( VT) LTD
EX ORT OF VC WORLD WIDE
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
45/134
* M/S DESCON ENGINEERING WORKED FOR NUMBER OF ROJECTS
1) E TL FOR L G TERMINAL
2) E TL FOR VCM ROJECT
3) EVTL FOR MEG ROJECT
4) FOR ARCO MID COUNTRY REFINERY
5) LASMO OIL BHIT GAS FIELD ROJECT
US $ 6.5 Million Dollars
* M/S BI - WATER INTERNATIONAL KARACHI WATER & SEWERAGE BOARD
HUB & I RI ROJECT FUNDED BY ADB
£ 15.8 Million Sterling
* M/S HYUNDAI HIDCO HAKAS JV
EX ORT OF HEAVY DREDGING MACHINERY
US $ 2.5 Million Dollars
* M/S AL - NOOR SUGAR MILLS LTD
MDF BOARD FIBRE BUILDING BOARD LANT
(LASSANI)
* ROCTER & GAMMBLE AKISTAN SOA CA ACITY EX ANSION LANT.
US $ 4.5 Million Dollars
* M/S ENGRO AKTANK TERMINAL.
CHEMICAL STORAGE TERMINAL
US $ 5.5 Million Dollars
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
46/134
* M/S SHV ENERGY AKISTAN
GAS EX ANSION ROJECT
US & 1.5 Million Dollars
* M/S TEKSER INSAAT SANAYI VE TICCARRET
CHASMA RIGHT BANK CANNAL ROJECT C-
65 US $ 260 Million Dollars
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
47/134
BREAK BULK
LIQUID CHEMICALS &
PETROCHEMICALS HANDLING
PROJECTS IN HAND
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
48/134
* M/s. SHV ENERGY LIMITED
LIQUIFIED ETROLEUM GAS (L G)
IN BULK OF VARIOUS ARCELS
* M/s. JAMSHORO JOINT VENTURE LIMITED
LIQUIFIED ETROLEUM GAS (L G)
IN BULK OF VARIOUS ARCELS
* M/s. AFTAB TRADERS
LIQUIFIED ETROLEUM GAS (L G)
IN BULK OF VARIOUS ARCELS
* M/s. CRESS L G
LIQUIFIED ETROLEUM GAS (L G)
IN BULK OF VARIOUS ARCELS
* M/s. RELIANCE CONSULTANCY
LIQUIFIED ETROLEUM GAS (L G)
IN BULK OF VARIOUS ARCELS
* M/s. ENGRO OLYMER & CHEMICAL LIMITED
VINYL CHLORIDE (VCM)
IN BULK OF VARIOUS ARCELS
EDC
IN BULK OF VARIOUS ARCELS
CAUSTIC SODA
IN BULK OF VARIOUS ARCELS
ETHELYNE
IN BULK OF VARIOUS ARCELS
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
49/134
UNDER GOING
PROJECTS
IN HAND
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
50/134
* M/S ENGRO FOODS LIMITED
1) LAUNCHING & SETTING U A COM LETE
STATE OF AN ART OF O'MORE ICE
CREAM LANT
2) BRAND NEW STATE OF AN ART ENGRO
RICE & AR BOILING LANT
3) EX ANSION OF EXISTING DAIRY MILK
LANT. (OL ER'S MILK)
* M/s. FOUNDATION ENERGY LIMITED-1
SETTING U A STATE OF AN ART WIND
OWER ROJECT OF A CA ACITY 49.50
MW AT JHAM IR, SINDH ROVINCE
* M/s. FOUNDATION ENERGY LIMITED-II
SETTING U A STATE OF AN ART WIND
OWER ROJECT OF A CA ACITY 49.50
MW AT JHAM IR, SINDH ROVINCE
* M/S. AK ARAB REFINERY LIMITED
SETTING U A COM LETE BRAND NEW
AS HALT BUILT UNIT (ABU UNIT)
* ENGRO OLYMER TRADING LIMITED
EX ORT OF VC RESIN (SABZ BRAND)
WORLD WIDE A ROXIMATE EX ORT IN
M/TONS 2500 ER MONTH
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
51/134
* M/s. CIVIL AVIATION AUTHORITY
SETTING U A BRAND NEW BENAZIR
BHUTTO INTERNATIONAL AIR ORT,
ISLAMABAD, and ACKAGE 06 REFUEL
HYDRANT SYSTEM.
* M/s. KARKEY AKISTAN
OWER SHI & OIL SU LY TANKER
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
52/134
VARIOUS OTHER PROJECTS
OF NATIONAL IMPORTANCE
INCLUDING HYDRO, SEWERAGE
WATER TREATMENT, DAMS
CHEMICAL INDUSTRY
OIL & GAS SECTOR
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
53/134
* M/S CHINA SINOHYDRO COR ORATION
1) GOMAL ZAM DAM HYDRO OWER
2) DUBAR KHAWAR DAM HYDRO OWER
3) KHAN KHAWAR DAM
4) KWSB K-III
* M/S. INDUS REFINERY LIMITED.
HI-TECH 100,000 B SD OIL REFINERY
ON RELOCATION BASIS
* M/S. JAMSHORO JOINT VENTURE
L G EXTRACTION LANT
* M/S. ETROSIN RAVI ENGINEERING
OIL & GAS ROJECTS LTD.
* M/S. SHELL GAS L G AKISTAN LTD
L G ROJECTS / L G GAS
* M/S. BI-WATER INTERNATIONAL
KARACHI WATER & SEWERAGE
BOARD HUB & I RI UM ING
STATION ROJECT
* M/S. DESCON ENGINEERING LTD (HYDRO OWER ROJECTS)
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
54/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
55/134
* AREVA T&D AKISTAN ( VT) LTD.
132 KV GRID STATION AT
CREEK CITY, DHA
* KHALID RAUF & CO., ( VT) LTD.
INFRASTRUCTURE ROJECTS
LAHORE RING ROAD
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
56/134
HYDRO OWER ROJECTS
From our background experience, strength & experiences from
industrial development projects, S.M.Asgh ar ( vt) L imited
has rapidly established itself as a key player in infrastructure
projects.
We successfully did the Custom Clearance & In-land
Transportation jobs of large-scale projects like dams, barrages,
highways and housing complexes.
We hold the distinction of being the first ever local company to
do the 07 Major Hydropower Projects Simultaneously of National
Importance in Pakistan
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
57/134
HYDROPOWER
PROJECT.
Taunsa Barrage Rehabilitation and Modernization
Location: Taunsa Pakistan
Nature Of Job Custom Clearance & Inland Transportation.
Year Of Project March 2006-2007
Cost Of Project US $ 140 Million Dollars
Completion : May 2008
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
58/134
HYDROPOWER
PROJECT
MANGLA DAM RAISING PROJECT
LOCATION Mangla
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION
COST OF
PROJECT
US $ 140 Million Dollars
Expected
Completion
Date:
September 20 2007
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
59/134
HYDROPOWER
PROJECT.
SATPARA DAM HYDROPOWER PROJECT
LOCATION PAKISTAN
NATURE OF JOB CUSTOM CLERANCE & INLAND TRANSPORTATION.
COST OF
PROJECT
US $ 140 Million Dollars
Completion : March 2007
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
60/134
roject Name Kachhi Canal roject – Contract # KC-03
Location: Taunsa Barrage – Kot Addu
NATURE OF JOB CUSTOM CLEARANCE & INLAND
TRANS ORTATION.
COST OF
ROJECT
US $ 65 MILLION DOLLARS
Completion: January 2009
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
61/134
Project NameGOMAL ZAM HYDRO OWER ROJECT
CLIENT CHINA SIOHYDRO COR ORATION
NATURE OF
JOB
CUSTOM CLEARANCE & INLAND
TRANS ORTATION.
COST OF
ROJECT
US $ 220 MILLION DOLLARS
Completion: 4 YEARS
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
62/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
63/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
64/134
Project NameDuber Khwar
Location:
The project located on river Duber Khwar, right
bank tributary of Indus river near atan in NWF
at a distance 265 Km from Islamabad.
NATURE OF JOB CUSTOM CLEARANCE & INLAND
TRANSPORTATION.
COST OF PROJECT US$ 109 million
Completion: 4 YEARS
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
65/134
Location: The project is located on Allai Khwar river, left
tributary of River Indus near Besham in NWF , 245
km from Islamabad
NATURE OF JOB CUSTOM CLEARANCE & INLAND
TRANSPORTATION.
COST OFPROJECT
US$ 110 million
Completion: 4 YEARS
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
66/134
Project Name MIRANI DAM
Location: In the Dasht River Basin about 30 miles (48 km)
West of Turbat Town in Makran Div of
Baluchistan.
NATURE OF JOB CUSTOM CLEARANCE & INLAND
TRANSPORTATION.
COST OF
PROJECT
US$ 120 million
Completion: 4 YEARS
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
67/134
Project Name MIRANI DAM
Location: In the Dasht River Basin about 30 miles (48 km)
West of Turbat Town in Makran Div of
Baluchistan.
NATURE OF JOB CUSTOM CLEARANCE & INLAND
TRANSPORTATION.
COST OF
PROJECT
US$ 120 million
Completion: 4 YEARS
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
68/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
69/134
L G Storage & Handling Facilities
Project Name ENGRO AKTANK L G TERMINAL
Location: EASTERN INDUSTRIAL ESTATE ORT QASIM
NATURE OF JOB CUSTOM CLEARANCE & INLAND
TRANSPORTATION.
COST OF
PROJECT
US$ 10 million
CAPACITY 4,500 METRIC TONES OF LPG
LPG BULLETS 10 LPG bullets
Completion: 1997 -98
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
70/134
Integrated Bulk Liquid Chemical
Terminal Storage & Handling Facilities
Project Name ENGRO AKTANK VCM TERMINAL
Location: EASTERN INDUSTRIAL ESTATE ORT QASIM
NATURE OF JOB CUSTOM CLEARANCE & INLAND
TRANSPORTATION.
COST OF PROJECT US$ 80 million
CAPACITY 41,000 CUBIC METER STORAGE FACILITY
SPHERICAL TANK 2 SPHERICAL TANK
Completion: 1997 -98
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
71/134
In the first phase E TL constructed facilities for the integrated
bulk liquid Chemical and Storage Terminal the first phase comprised construction
of 41,000 cubic meter of storage facility the cost of first phase of the roject was
US $ 60 million the tank farm is situated on reclaimed land in the QA.
ARAXYLENE
ACETIC ACID
HOS HORIC ACID (HANDLING ONLY)
VINYL CHLORIDE MONOMER
ACRYLONITRILE
LIQUEFIED ETROLEUM GAS
MONO ETHYLENE GLYCOL
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
72/134
Project Name ENGRO ASAHI OLYMER & CHEMICALS LIMITED
Location: EASTERN INDUSTRIAL ESTATE ORT QASIM
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANS ORTATION.
COST OF PROJECT US$ 80 million
CAPACITY 100,000 (T A) VC MANUFACTURING LANT
CLIENT ENGRO ASAHI OLYMER & CHEMICALS LTD
Completion: 1999-2000
Engro Asahi olymer & Chemicals Limited (EA CL or the company) is a joint
Venture between Engro Chemical akistan Ltd. (EC L) and Mitsubishi
Corporation (Japan), each with an 80% and 20% shareholding, respectively
EA CL is the only VC manufacturer in akistan with a Capacity
Of 100,000tons per annum (T A) and its operations are located at ort Qasim
Karachi. Its plant was commissioned in November 14, 1999.
Engro Asahi olymer & Chemicals Limited
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
73/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
74/134
ICI T11 TA lant
Project Name ICI TA T11 LANT
Location: EASTERN INDUSTRIAL ESTATE ORT QASIM
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 480 million
CLIENT TRANSCAR ROJECTS UK/ FOOSTER WHEELER UK
Completion: 1998
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
75/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
76/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
77/134
ARCO Mid Country Refinery (100, 000 B D)
Project Name AK ARAB REFINERY COM ANY
Location:MULTAN, AKISTAN
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANS ORTATION.
COST OF PROJECT US$ 80 million
CLIENT DESCON ENGINEERING
Completion: 1998
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
78/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
79/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
80/134
-------
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
81/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
82/134
INDUS REFINERY LIMITED
AKISTAN SECOND LARGEST REFINERY
Project Name IRL is a 100,000 bpd or 4.95 million metric tons per
annum complex fuels refinery. It will be the sixth
petroleum refinery in akistan and the country’s
largest refinery.
Location: ORT QASIM INDUSTRIAL ESTATE
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANS ORTATION.
COST OF PROJECT US$ 700 million
CLIENT INDUS REFINERY LIMITED
Completion: UNDER CONSTRUCTION
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
83/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
84/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
85/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
86/134
RELOCATION OF 100,000 BARRELS CA ACITY REFINERY
ETRO CANADA REFINERY TO AKISTAN ORT QASIM
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
87/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
88/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
89/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
90/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
91/134
TRANSASIA REFINERY LIMITED
AKISTAN SECOND LARGEST REFINERY
Project Name TRL is a 100,000 bpd or 4.00 million metric tons per
annum complex fuels refinery. It will be the state of an
Art petroleum refinery in akistan and will be one of
the country’s largest refinery.
Location: ORT QASIM INDUSTRIAL ESTATE
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANS ORTATION.
COST OF PROJECT US$ 700 million
CLIENT TRANSASIA REFINERY LIMITED
Completion: UNDER CONSTRUCTION
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
92/134
TRANASIA REFINERY LIMITED
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
93/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
94/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
95/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
96/134
FAUJI FERTILIZER ENERGY COM NAY
LIMITED (FFCEL) 49.5 MW WIND ENERGY
ROJECT AT JHAM IR, KARACHI
Project Name FFCEL WIND ENERGY ROJECT OF CA ACITY 49.5
MW
Location: JHAM IR, NEAR THATTA
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANS ORTATION.
COST OF PROJECT US$ 110 million
CLIENT DESCON ENGINEERING LIMITED
Completion: UNDER FINAL STAGES OF COM LETION
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
97/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
98/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
99/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
100/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
101/134
DHA DESALINATION LANT 3 MIGD
& 94 MW OWER LANT KARACHI
Project Name DHA DESALINATION & OWER LANT
AKISTAN FIRST EVER SEA DESALINATION
& OWER LANT
Location: DHA, HASE VIII. KARACHI
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANS ORTATION.
COST OF PROJECT US$ 130 million
CLIENT DHA COGEN LIMITED (DCL)
Completion: UNDER CONSTRUCTION
TOTAL VALUE OF L/C ESTABLISHED:
Siemens AG Germany $ 41,400,000 $ 33,120,000
Siemens AG Germany € 6,550,000 € 5,240,000
Alfa Laval AS Copenhagen € 15,165,300 € 12,132,241
Lincas Electro Vertibas € 295,500 € 236,390
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
102/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
103/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
104/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
105/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
106/134
KARACHI INTERNATIONAL CONTAINER
TERMINAL (KICTL) KARACHI
Project Name KARACHI INTERNATIONAL CONTAINER
TERMINAL (KICTL)
HASE III EX ANSION ROJECT
Location: WEST WHARF ROAD, KARACHI
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANS ORTATION.
COST OF PROJECT US$ 400 million
CLIENT KICTL AKISTAN
Completion: UNDER CONSTRUCTION
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
107/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
108/134
BAHRIA TOWN ( VT) LIMITED
RAWAL INDI
Project Name BAHRIA TOWN ( vt) LIMITED
AWAMI VILLAS ROJECT.
TOTAL # OF VILLAS 8000
Location: RAWAL INDI, AKISTAN
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANS ORTATION.
COST OF PROJECT US$ 120 million
CLIENT BAHRIA TOWN ( vt) LIMITED
Completion: UNDER CONSTRUCTION/ ROGRESS
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
109/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
110/134
Project Name 49.5 MW FFCEL FIRST WIND OWER ROJECT
Location: JHAM IR, KARACHI
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANS ORTATION.
COST OF PROJECT US$ 130 Million
Completion: 25TH
DECEMBER 2012
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
111/134
Project Name AS HALT BUILT UNIT ROJECT (ABU)
FOR ARCO
Location: ARCO MID COUNTRY REFINERY, MULTAN
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANS ORTATION.
COST OF PROJECT US$ 30 Million
Completion: DECEMBER 2012
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
112/134
Project Name 49.5 MW FOUNDATION WIND ENERGY-1 ROJECT
Location: JHAM IR, KARACHI
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANS ORTATION.
COST OF PROJECT US$ 130 Million
Completion: SE TEMBER 2014
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
113/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
114/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
115/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
116/134
Project Name 49.5 MW FOUNDATION WIND ENERGY-II ( vt) Ltd.
ROJECT
Location: JHAM IR, KARACHI
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANS ORTATION.
COST OF PROJECT US$ 130 Million
Completion: SE TEMBER 2014
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
117/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
118/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
119/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
120/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
121/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
122/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
123/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
124/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
125/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
126/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
127/134
Project Name METRO HABIB CASH & CARRY AKISTAN ( VT) LTD
Location: HEAD OFFICE THOKAR NIAZ BAIG, MULTAN RD, LHR.
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANS ORTATION.
COST OF PROJECT US$ 3.4
Completion:STILL UNDERGOING
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
128/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
129/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
130/134
S.M.Asghar ( vt) Limited believes that
A
CCIDENTS DON
’
T JUST
happen, they’re caused, and it is the dutyof the Company to remove and minimize all possible causes ofAccidents.
We at S.M.Asghar ( vt) Limited takes preliminary guide to the
recognition of potential hazards to the following.
M O S T - S A F E - L A C E S
M MACHINERY : Sources of Mechanical ower
O O ENINGS : its, Sumps, Ducts & Drains
S STACKS : Stores Materials, Raw & rocess.
T TOOLS : All type of Tools.
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
131/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
132/134
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
133/134
Safety Boots : At the Ship Derricks & the ort remises
Safety Glasses : They are provided to the Staff who
Work on the Ship /Vessel.
8/11/2019 S.M.Asghar (Pvt) Limited Profile & Introduction for Link-19th December 2014
134/134
HEAVY & SUPER HEAVY LIFT
TRANSPORTATION EXPERIENCEWE CALLED THIS ASABNORMAL LOADS