Smart Grid – Electric Vehicle Supply Equipment (EVSE’s)

Sustainability TransportationCategory

San Diego June 2014Presented by

Nathaniel C. Martin, C.E.M

2

Project Description

• The installation of 14 EVSE’s.

• The project was funded through a grant from DOE which was implemented by Sacramento Municipal Utility District (SMUD).

3

Project Description

• The funding requirements were to test the newly commercialized Smart Grid technology.

• Functional requirements: to confirm readiness for direct load control, energy monitoring, and interoperability.

4

Project Information

Project completion date: July 2013Project cost: $236,000

EVSE installation locations:• Parking Lot 1, has 3 units• Parking Structure 1, has 4 units• Parking Structure 2, has 7 units

5

Project Description continued

• Sac State had a requirement to charge a fee for service for each charging event of the EVSE’s.

Prerequisites:• This project required development of a

Demand Response Management System (DRMS) by SMUD.

6

Project Description continued

Prerequisites continued:• Sac State had to install a new Energy

Management Control System (EMCS)• New Electrical Metering equipment with

communication capabilities over the campus Ethernet network

7

EVSE pictures

8

EVSE pictures

9

Energy and the Environment

10

Energy and the Environment

• The total energy usage 6,230 kWh, which equates to 1.93 Metric Tons of CO2e.

• This is equivalent to the 631 gallons, which equates to 5.4 Metric Tons of CO2e.

• The net avoided GHG emissions is 3.47 Metric Tons of CO2e.

11

EMCS AutoDR screen

12

EVSE AutoDr Sequence

13

EVSE charge trend

14

EVSE AutoDr test trend

15

Team

• Linda Hafar, P.E., Sr. Director, Sustainability & Plant Operations-Retired

• Paul Serafimidis, Associate Director, Plant Operations• Nat Martin, C.E.M., Energy Management • SMUD• SAIC Energy, Environment & Infrastructure• The Engineering Enterprise, consulting engineers.• 3DData com• HRGA Architects

16

My contact information

Nathaniel C. Martin, C.E.Mnmartin@csus.edu916 278-3639