Sites built

Post on 22-Jan-2018

98 views 0 download

Transcript of Sites built

HCT Cable Ladder: OBTS

Shelter Front View:

A/C Steps Grouting:

Cable Routing:

Cable Labeling:

Cable Labeling:

Cable Routing:

Cable Routing with DCDB:

Servo & Power Plant:

Template/Contact Details:

Single Line Diagram:

Shelter Layout:

+Ve Bus Bar:

+Ve Bus Bar View-2:

Common Earth Bus Bar:

IGB:

EGB:

Battery Bank:

Shelter Inside View:

A/C View:

Cable Routing:

Fire Fighter:

MW Rack:

Shelter Floor:

Floor View-2:

Roof Level:

Outside View:

Outside View-2:

Body Earthing:

Earthpit Marking:

Earthpit Chamber Marking-2:

Earthpit Chamber Marking-3:

ODBTS Box:

Overall View: