Post on 15-Jan-2016
description
Shuttle Mission:
STS-117 Atlantis
Launch/Landing Date:
June 10 - 22 , 2007
Assembly Elements:
S3/4 Truss Segment with Photovoltaic Radiator and 3rd Set of Solar Arrays
P6 Array Retraction
The following artist’s renderings show the ISS assembly schedule with the corresponding shuttle missions and launch vehicles.
S3/4 Truss Segment
P6 Array Retraction
Shuttle Mission:
STS-118 Endeavour
Launch/Landing Date:
August 8 - 21, 2007
Assembly Elements:
S5 Truss Segment
External Stowage Platform 3
S5 Truss Segment
External Stowage Platform 3
Shuttle Mission:
STS-120 Discovery
Launch Date:
October 23, 2007
Assembly Elements:
Node 2
P6 Relocation
P6 Relocation
Node 2
Shuttle Mission:
STS-122 Atlantis
Launch Date:
December 6, 2007
Assembly Elements:
Columbus European Laboratory Module
Columbus European Laboratory Module
Launch vehicle:
Ariane 5 Rocket
Launch Date:
No Earlier than January 2008
Assembly Elements:
None: European Automated Transfer Vehicle
European AutomatedTransfer Vehicle
Shuttle Mission:
STS-123 Endeavour
Launch Date:
February 14, 2008
Assembly Elements:
Kibo Japanese Experiment Logistics Module – Pressurized Section (ELM – PS)
Canadian Special Purpose Dexterous Manipulator (DEXTRE)
Kibo ELM - PS
DEXTRE
Shuttle Mission:
STS-124 Discovery
Launch Date:
April 24, 2008
Assembly Elements:
Kibo Japanese Experiment Module – Pressurized Module (JEM-PM)
Japanese Experiment Module Remote Manipulator System (JEM RMS)
JEM-PM and JEM RMS
ELM-PS Relocated
Shuttle Mission:
STS-125 Atlantis
Launch Date:
August 7, 2008
Assembly Elements:
None: Hubble Space Telescope Servicing Mission 4 (HST-SM4)
Shuttle Mission:
STS-126 Endeavour
Launch Date:
September 18, 2008
Assembly Elements:
None: Multi-Purpose Logistics Module (MPLM)
Shuttle Mission:
STS-119 Discovery
Launch Date:
Under review
Assembly Elements:
S6 Truss Segment with 4th Set of Solar Arrays S6 Truss
Segment
Launch Vehicle:
Proton Rocket
Launch Date:
Under review
Assembly Elements:
Multipurpose Laboratory Module with European Robotic Arm (ERA) Multipurpose Laboratory
Module with European Robotic Arm (ERA)
Shuttle Mission:
STS-127 Endeavour
Launch Date:
Under review
Assembly Elements:
Kibo Japanese Experiment Module Exposed Facility (JEM EF)
Kibo Japanese Experiment Logistics Module – Exposed Section (ELM-ES)
Kibo JEM EFand ELM-ES
Launch Vehicle:
H-IIB Rocket
Launch Date:
Under review
Assembly Elements:
None: Japanese H-II Transfer vehicle
Japanese H-II Transfer Vehicle
Shuttle Mission:
STS-128 Discovery
Launch Date:
Under review
Assembly Elements:
Multi-Purpose Logistics Module (MPLM)
3 Crew Quarters, Galley, 2nd Treadmill, Crew Health Care System 2 6 Person Capability
Established
Shuttle Mission:
STS-129 Endeavour
Launch Date:
Under review
Assembly Elements:
EXPRESS Logistics Carriers 1 and 2
EXPRESS Logistics Carriers 1 and 2
Shuttle Mission:
STS-130 Discovery
Launch Date:
Under review
Assembly Elements:
None: Multi-Purpose Logistics Module (MPLM)
Shuttle Mission:
CONTINGENCY FLIGHT STS-131 Endeavour
Launch Date:
Under review
Assembly Elements:
EXPRESS Logistics Carriers 3 and 4
EXPRESS Logistics Carriers 3 and 4
Shuttle Mission:
STS-132 Discovery
Launch Date:
Under review
Assembly Elements:
Node 3 with Cupola
Node 3
Cupola
Shuttle Mission:
CONTINGENCY FLIGHT
STS-133 Endeavour
Launch Date:
Under review
Assembly Elements:
EXPRESS Logistics Carriers 5 and 1
EXPRESS Logistics Carriers 5 and 1
ISS Assembly Complete
Launch vehicle:
Proton Rocket
Launch Date:
Under review
Assembly Elements:
Research Module
Research Module
Completed ISS
Click this link to see an animation of the ISS Assembly:http://www.tietronix.com/anim/pao/s1A1.html
Click this link to see Space Shuttle Flights and ISS Assembly Sequence:
http://www.nasa.gov/mission_pages/station/structure/iss_manifest.html