Transcript of Shell IWCF Well Control Manual, Part 1
Part 1Topic 1.1 - IntroductionTopic 1.2 - Formation
pressuresTopic 1.3 - Formation strengthTopic 1.4 - Primary well
control conceptsTopic 1.5 - Secondary well controlTopic 1.6 -
Tertiary well controlAppendix 1 - Relationship between bottom hole
pressure, formation strength at the casing shoe, drilling fluid
density, mud influx volumeAppendix 2 - Worked example for killing a
well by "Wait & Weight" methodAppendix 3 - Derivation of the
equation to calculate top gas pressuresAppendix 4 - List of symbols
used in this Part