SFUSD Prop 39: Projects, Planning and Problems

BACKGROUND Big, Urban, and Old School District 6th Largest School District in CA

Renters love school bonds 4 School Bonds since 2000

Gavin supports green schools 2008 Sustainability Office of 1 created

Prop 39 Improve user comfort, address site maintenance issues, lower utility costs, and save energy by implementing energy efficiency upgrades.

2011 Bond “Sustainability Lite”

2011 Bond “Sustainability Lite”

PROP 39 ROUND 1

Visitacion Valley MS Proposed EEMs:

PROP 39 ROUND 1

PROP 39 ROUND 1

ZNE BECOMES ALL THE RAGE

➔ “SUSTAINABILITY LITE” A HEAVY DISSAPPOINTMENT

➔ DSA 7 x 7 x 7 CHALLENGE ➔ SB 350 SIGNED INTO

LAW ➔ NBI PRESENTATIONS ➔ SFUSD ZNE WORKING

GROUP ➔ SFUSD CARBON

REDUCTION PLAN

ZNE STAIRWAY ZNE STAIRCASE

PROP 39 ROUND 2 Round 2 Goal: Improve user comfort, address site maintenance concerns, lower utility costs, and implement ZNE strategy. Round 2 Focus: ➔ LED Lighting ➔ Heating Controls ➔ EMS Upgrades ➔ Windows ➔ HVAC maintenance ➔ Fuel Switch Nibbling

Round 2 No-Nos: ➔ Condensing Boilers ➔ VFDs** ➔ Short Term Complexity

PROP 39 LESSONS LEARNED ➔ HAVE A CLEAR GOAL AND VISION FOR PROP

39 FUNDS ➔ LEVERAGE FUNDING OPPORTUNITIES THAT

BECOME AVAILABLE ➔ ALIGN GOALS WITH MAINTENANCE

CAPACITY ➔ QUALITY OF ENERGY AUDITS MATTERS, A

LOT ➔ PLAN ON SUBMITTING AT LEAST ONE

AMENDMENT

PROP 39 EXTENSION